For a housing society solar plant, the answer is usually shared across three different roles. The legal system owner or prosumer remains accountable for the plant and its safe operation under the applicable electricity rules. A contracted vendor performs the maintenance tasks the agreement assigns to it. The committee administers the contract, access, records, budget and member communication on behalf of the society. Individual members help through the rights and duties in the society’s own bylaws and resolutions; owning a flat does not automatically make each resident the maintainer of a common-roof solar array.

This is a governance question as much as a technical one. A roof system may keep working for years, while the secretary, treasurer, facility manager and EPC contact all change. A maintenance arrangement that depends on one person’s phone number will fail at handover. The society needs a named owner for each decision, a written scope for whoever does the work, an accessible record, and a way to resolve faults. The answer also differs between a society-owned plant, a developer-owned plant pending handover, a third-party-owned arrangement and an individual member’s private plant.

If your committee is planning a common-facility system, Get a proposal for our committee through the society solar enquiry route. Share the common-meter bills, roof rights, bylaws or resolution process, and any draft O&M agreement. A proposal should name the parties and maintenance boundary instead of promising that “someone will look after it”.

Sources checked: 23 November 2026. The MNRE PM Surya Ghar residential CFA guidelines describe GHS/RWA common-facility eligibility, resident-created maintenance entities and registered-vendor CMC duties under that scheme. The current GERC distributed renewable energy regulations, notified 30 October 2026 place safe operation and maintenance of the DRES up to the delivery point on the DRES owner. Those sources do not supply this society’s bylaws, ownership deed or executed vendor contract. The documents for this particular site determine the final allocation of work and cost.

Start with ownership and the meter, not the maintenance brand

Ask first: who legally owns this solar asset, and whose electricity connection does it use? The answer may be a registered society or association, a developer who will hand the asset over, a RESCO or other third-party owner, or an individual resident who controls a private roof section and meter. The roof owner, electricity consumer and solar equipment owner are not always the same legal entity. A sales brochure may use “society solar” for all of these arrangements; a maintenance contract cannot.

Gujarat’s 2026 DRES regulation says the DRES owner is responsible for safe operation, maintenance and defects of the system up to the delivery point. The distribution licensee is responsible for its network beyond that point, subject to the regulation’s conditions when damage is caused by the DRES. This allocates regulatory responsibility at the electrical boundary; it does not tell the society which employee will book a cleaning visit or which vendor will pay for a failed inverter. Those are contractual and governance matters. GERC Regulation 11.5–11.6.

Under PM Surya Ghar’s residential CFA route, the MNRE guidelines say support for GHS/RWAs generally goes to resident-created entities responsible for the overall maintenance and upkeep of common facilities. They also set a common-facility connection condition: the eligible GHS/RWA connection must be dedicated to common facilities, not used to supply residents’ individual homes. That is a scheme condition, not a claim that every apartment solar project has the same subsidy or that the committee can reallocate electricity credits without a utility-approved mechanism.

There are exceptions and handover cases. MNRE’s clarification on developer/promoter applications describes support before a resident collective exists, subject to an undertaking to transfer the subsidised asset once the collective is created. If your building is in that stage, the committee should request the undertaking, completion documents, warranties, serial register and O&M records before accepting handover. Do not assume “the builder installed it” means the builder will maintain it indefinitely.

Arrangement to documentWho should be identifiedMaintenance question to settle
Society-owned common-facility plantSociety or association, consumer number, authorised committee signatoryWhich vendor work is contracted and who keeps records after a committee change?
Developer-installed asset before handoverDeveloper, future resident entity, DISCOM account holderWhen and with which documents does maintenance responsibility transfer?
Third-party-owned plantEquipment owner, society roof-rights grantor, electricity consumerWho operates equipment, maintains the roof interface and responds to faults?
Member-owned private systemResident, meter account holder, roof-rights sourceWhich parts are the resident’s and which access or waterproofing matters remain common?

This is a decision table, not a substitute for legal advice. It helps the committee collect the documents that answer the question before voting on a budget or signing an EPC order.

What the vendor owes under the applicable scheme and signed agreement

An EPC can install a plant, then also provide a comprehensive maintenance contract (CMC), a narrower annual maintenance contract (AMC), a call-out service, or no ongoing service beyond limited warranties. These words are not interchangeable. Read the signed scope and the scheme rule. A module manufacturer’s product warranty is not automatically a promise that someone will inspect the roof, clean panels, repair cable damage, file utility paperwork or pay for a lift to replace a failed inverter.

For projects under the PM Surya Ghar residential CFA guidelines, MNRE states that registered vendors provide repairs and maintenance during a five-year CMC period from commissioning, with the cited guideline describing repair or replacement of under-performing components during that period. Its model consumer-vendor agreement includes five years of comprehensive O&M and asks the vendor to educate the consumer on safe cleaning and maintenance. That is a concrete scheme provision. It should not be copied onto an unrelated commercial society project, a RESCO contract, or a Heaven Green Energy offer without confirming the actual eligibility and signed terms. MNRE guideline, service clause and model agreement.

Even where a scheme requires five years, the society should make the handover document operational. Name when the clock starts, the plant and component identifiers, site access process, what preventive visits include, how fault reports are logged, who can authorise work, who pays for consumables or damage outside scope, and which evidence proves a task was done. The committee should ask for a method of measuring system performance that does not confuse a cloudy week with a fault. A vendor’s promise to “monitor” is incomplete without the data source, alert recipient, review frequency and escalation path.

Avoid inventing a universal cleaning interval. A coastal roof, a roof beside an exhaust outlet, a sheltered terrace and a dusty construction site can soil differently. The vendor should inspect conditions and propose a safe method compatible with module and roof instructions. If water or access equipment is needed, the society and vendor should agree who provides it. The maintenance plan must preserve fall protection and electrical isolation requirements. Residents should not be told to climb a roof and wash an energised array because the committee wants to keep an O&M line cheap.

What the committee has to administer

The committee may delegate physical work, but it cannot delegate away the need to manage its own contract and common property. It should keep one current file: approved design, as-built electrical single-line diagram, roof layout, utility permission, commissioning and meter records, warranties, manuals, serial numbers, vendor contact, insurance if any, and a fault and maintenance log. Make the file accessible to the next committee under the society’s document rules. An inverter app login held only by an outgoing secretary is a continuity risk even when the panels are healthy.

Choose two named roles: a technical contact who can report symptoms and coordinate safe access, and an authorised decision-maker who can approve paid work within the society’s authority. They may be the same person in a small society, but the responsibility should be written. Set an escalation path if that person is unavailable. A facility manager can note a broken isolator cover or recurring inverter alarm; they should not alter protection settings or open electrical cabinets without appropriate qualification and authority.

Budgeting is part of maintenance. The committee should know which work the vendor performs under an existing CMC and which future repairs, roof reinstatement, meter costs or replacement items may fall outside it. A five-year service promise does not answer what happens in year six. The society’s governing body can approve a reserve or procurement method according to its bylaws. This article does not prescribe a compulsory reserve amount, levy or voting threshold; those depend on the society’s legal form and documents.

A simple monthly governance check can be useful: compare the generation meter or monitored production with the expected pattern after considering weather, shading, outages and new building loads; note any sustained unexplained change; check that the most recent service report and utility bill are filed. This is not a remote diagnosis. A shortfall can have several causes, and a qualified service provider must test safely. The committee’s role is to notice and document, not to bypass the vendor or electricity supplier.

Task or decisionSociety committeeContracted vendorIndividual members
Keep title, approvals and as-built documentsMaintain accessible master fileSupply agreed handover documentsRequest access through society process where entitled
Routine monitoring and fault logName a contact and keep decisions recordedPerform the scope in the signed agreementReport visible issues without touching equipment
Roof access and resident noticeAuthorise and coordinate according to bylawsFollow agreed safety and access methodRespect restricted work areas
Cleaning and electrical maintenanceCheck scope, evidence and safe accessPerform if contracted, using qualified staffDo not perform common-array electrical work without authority
Warranty claimPreserve proof and authorise claim routeAssist as contracted or required by schemeNo individual claim for common asset unless documents say otherwise
Future paid repairsApprove under society governance and budgetQuote and execute only authorised workVote or contribute as bylaws provide

This matrix is a draft responsibility worksheet. The committee must edit it against the actual ownership and contract. It should not appear in a signed agreement without legal and technical review.

What members can reasonably decide and what they should not be asked to do

Residents can decide whether they support use of common roof space, capital expenditure and service budgeting through the society’s valid process. They can ask for comparable bids, readable performance reports and a clear division between common and individual electricity benefits. They should receive notice of works that affect terraces, access, noise or waterproofing. The exact meeting, quorum and voting rules come from the society’s bylaws and applicable state law; do not apply a generic “simple majority” claim from a blog post.

Members should not be made personally responsible for diagnosing electrical faults on a common plant. A resident who sees a damaged cable or open enclosure should keep clear and report it to the society’s authorised contact. A flat owner may have a separate arrangement for a private system, but that does not give them authority to move or disconnect common equipment. Likewise, a committee cannot promise flat-level bill credits simply by approving a resolution. Billing allocation depends on the electricity regulator’s mechanism, same-name and other conditions, and utility approval.

The distinction matters in Gujarat after the 2026 DRES regulation. It offers net, group and virtual mechanisms with distinct eligibility and settlement rules. The GERC statement of reasons specifically discusses housing-society ownership and allocation issues. Do not treat “group net metering” as a synonym for splitting a common plant’s savings among all flats. Ask the utility which mechanism is proposed and which legal entity names appear on the relevant service connections before telling members how bills will change. This article’s maintenance roles remain necessary under every mechanism, but the meter and credit structure can differ.

Put the decision into the resolution and contract

A committee resolution can be short and still settle the right questions. It should record the purpose of the project, the common roof area and metered loads under consideration, the authority to obtain technical proposals, who may sign after the society’s required approval, the financial limit or further approval needed, and the records the committee must bring back. If the society has not yet chosen a vendor or capacity, say so. A resolution asking for a feasibility study should not be worded as an unconditional order to build whatever system an EPC later recommends.

For a project approval, append or reference the final equipment schedule, roof and electrical drawings, ownership and meter boundary, vendor scope, service term, warranties, access and safety plan, insurance allocation if relevant, reporting method, cost and payment terms, and defect or dispute route. State who receives portal credentials and where records are stored. Define how a future committee takes over these files. These are drafting prompts, not a model legal document and not a statement that every society law requires identical clauses.

The contract should describe outputs and evidence. “Quarterly inspection” is stronger when it lists what the inspector checks and what report the society receives. “Remote monitoring” needs the portal, data retention, alert routing and response responsibility. “Cleaning” needs a safe work method, roof-access permissions and a way to decide frequency from observed conditions. “Warranty support” needs a named party to file claims, collect replacement components and document downtime. Do not write a promise of zero faults, a fixed generation number or a guaranteed response time unless the vendor has offered and documented exactly that.

At handover, request a demonstration of safe shutdown and fault reporting for the authorised facility team, not a lesson that encourages residents to work inside live equipment. Verify that manuals, passwords, test records and utility commissioning paperwork are delivered and that the committee can contact the relevant service party. The MNRE residential guideline includes maintenance education and an O&M manual in its scheme framework; an actual society should confirm what its executed contract and applicable programme require.

What to do when something goes wrong

A fault can be a normal inverter alert, a damaged module, a roof leak near mounting, a meter discrepancy or an electrical safety concern. These need different escalation. The first step is to protect people and record the observation without unsafe contact. Note date, location, photographs taken from a safe position, alarm text or monitor screenshot, and whether the building has lost grid supply. Contact the vendor or qualified site electrician through the agreed channel. If the utility network or revenue meter appears involved, use the licensee’s process.

Do not assume that lower generation proves a defective panel. Compare the same season, weather, shading and downtime. Check whether a building modification has cast new shade or whether the inverter was intentionally curtailed under an approved arrangement. Conversely, do not dismiss repeated inverter trips as “cloudy weather”. The service provider should test, identify the cause and record the corrective action. The society file should show the fault report, work order, parts changed, warranty claim if any, and return-to-service check.

Roof leaks need special treatment because the owner and solar vendor may disagree about cause. Keep pre-installation roof-condition photographs and post-installation inspection records. The contract should say who investigates an alleged attachment leak and how repair responsibility is determined. A blanket “the solar vendor handles all roof leaks forever” statement is not supported by the scheme guideline; nor is an automatic assumption that the society pays. Evidence and the signed scope decide.

For a serious safety concern, isolate the area and call qualified help. The GERC regulation treats safe operation up to the delivery point as the DRES owner’s responsibility and allows licensee disconnection when needed for safety. It does not make the secretary an electrical inspector. Arrange competent technical review and follow the current CEA safety regulations, including their 2026 amendment, when the work requires it. The committee should record the decision and communicate only verified status to residents.

Questions committees ask

Does the five-year MNRE CMC mean our vendor handles everything? It means the specified registered-vendor service obligation applies where your project is within that scheme and its conditions. The agreement must still identify scope, evidence, exclusions and the parties. Do not apply that clause to an unrelated arrangement without checking eligibility and the signed documents.

Does the committee have to clean panels itself? No universal rule says committee members must do physical cleaning. The legal owner must ensure safe maintenance; the contract can assign the work to a qualified vendor. The society should decide who arranges roof access and checks completion. Cleaning frequency should reflect site conditions and manufacturer guidance.

Can a member claim a common-system inverter warranty directly? Usually the asset owner or its authorised representative should manage the claim, but the actual warranty and purchase documents govern. Keep the manufacturer certificate, invoice, serial number, vendor contact and approval authority together.

What changes if a developer installed the plant before the society formed? Confirm title, meter account, any MNRE handover undertaking, warranties, service contract, outstanding defects and portal access. A completed panel installation is not a complete governance handover.

Can savings appear on individual flat bills? That is a separate metering and legal-entity question under the current GERC arrangement and utility approval. A common-facility PM Surya Ghar connection has its own use condition. Do not promise member credits from a committee vote alone.

What should the next committee inherit? The resolution, signed contracts, as-built drawings, approvals, meter records, warranties, manuals, monitoring access, maintenance history, budget and open faults. Put them in a controlled society record rather than an outgoing member’s personal messaging history.

The committee’s best first move is to make ownership, meter boundary and service scope visible on one page. That turns an ambiguous “vendor or members?” discussion into a list of decisions the society can approve and monitor. Get a proposal for our committee through the housing-society solar enquiry, with common-meter bills and the society’s current governance documents. The final O&M responsibility should be written into the executed project and service agreements.

Written by
Heaven Green Energy

Founded in Surat in 2017. Head office at Utran, Surat. Heaven Green files PM Surya Ghar and DISCOM paperwork for its customers.

About Heaven Green Energy
Ready to Go Solar?

Plan solar for common facilities

Bring common-area bills, roof plans and the committee’s questions to discuss a society proposal.

Call WhatsApp