Turn your land into a
solar power plant.
Heaven Green Energy delivers complete ground-mount solar park solutions, from land documentation and government approvals to full EPCC execution and 25–30 years of operation & maintenance.
Explore 3 investment models, our team calls within 2 hours
What a ground-mount solar park is, who it suits, and what happens next
A ground-mount solar park puts solar panels on fixed structures on open land instead of on a roof, so it is sized to the land and the grid connection rather than to a building. Heaven Green Energy, headquartered at Mota Varachha, Surat, runs the work from land documentation and approvals through design, construction and operation and maintenance. For the contractor side of the work, see turnkey solar EPC.
Who it suits
- Factories with little roof space that want captive power
- Investors who want recurring income from a PPA
- Landowners and farmers who want a long DISCOM contract under PM-KUSUM
Site checks
Feasibility, soil tests, irradiance data, grid connectivity and yield projections come first. As a planning figure, 1 MW needs roughly 4 to 5 acres, per our 1 MW plant guide.
What happens next
Send the location, land area, ownership and the model you prefer through the form. We evaluate the land, suggest the project model and walk you through the returns projection.
End-to-end solar park
in 5 steps
From the first site visit to 25 years of power generation, we handle every single step so you don't have to.
Land Documentation
Assistance with all required approvals from government and local authorities, electricity board, and land clearances.
Site Survey & Planning
Detailed feasibility analysis, soil tests, irradiance data, grid connectivity, and yield projections to ensure maximum efficiency.
Design & Engineering
Customized solar park designs tailored to your site conditions, load profile, and chosen project model.
Procurement & Construction
Premium-grade Adani Solar modules, in-house Qbits inverters, and quality BOS components installed by our 70+ expert team.
Operation & Maintenance
Comprehensive 24/7 monitoring and maintenance support to keep your plant at optimal performance for 25–30 years.
Three ways to earn from
ground-mount solar
Choose the model that fits your goal, whether you're a factory owner, investor, or farmer, we tailor the solution to your situation.
Captive Use Solar Power Plant
Best for factories or industries without sufficient rooftop space, generate power remotely and use it at your facility.
How It Works
- Generate solar power at a remote ground-mount location
- Transmit electricity to your factory via the grid
- Pay minimal transmission and wheeling charges
Key Benefits
- Green energy directly at your consumption site
- Reduced dependency on expensive DISCOM rates
- Long-term energy cost savings for 25+ years
Third-Party Selling Solar Power Plant
An investment opportunity, set up a solar park and sign PPAs with private companies or factories to earn recurring income.
How It Works
- You invest in a ground-mount solar park
- Sign Power Purchase Agreements (PPA) with private companies or factories
- Sell electricity at rates lower than DISCOM tariffs
Key Benefits
- Recurring monthly income for the investor
- Buyers benefit from cheaper electricity than DISCOM
- Win-win model, savings for both parties
Sell to DISCOM or Government
The most popular model, sell solar energy to the DISCOM under PM Kusum Yojana at a tariff fixed for the 25-year PPA.
How It Works
- Participate in government reverse bidding to fix your electricity rate
- Sign a long-term PPA with DISCOM or government entity
- Generate steady monthly income for 25 years
Key Benefits
- 25-year PPA with the DISCOM under PM Kusum Yojana
- DISCOM payments backed by an escrow arrangement in the PPA
- Long-term returns at a tariff fixed for the PPA term
Scope of ground-mount installation and commissioning
What the build covers once design and approvals are done. The contract sets the exact boundaries for your plant.
| Stage | What is done |
|---|---|
| Site preparation | Site preparation and civil work for the plant area. |
| Structure and modules | Mounting structure installation, then module mounting and wiring. |
| Inverters and electrical | Inverter installation, DC and AC cabling, protection and earthing, and the electrical connections. |
| Grid interconnection | Connection to the grid and metering, with the DISCOM and utility approvals that go with it. |
| Testing and commissioning | System testing, commissioning and handover with full documentation and operator training. |
| Operation and maintenance | Monitoring and maintenance after commissioning. See O&M for what a contract usually covers. |
Stage scope follows our solar EPC guide. Commissioning and approval details depend on your state and DISCOM.
Your trusted partner in
solar park development
We don't just build solar parks, we manage them for life. Here's what makes Heaven Green Energy the partner of choice for ground-mount projects across India.
Leverage state & central policies
for your solar park
Multiple government schemes make ground-mount solar one of the most financially rewarding investments available today in India.