Heaven Solar Sarathi App:
your solar journey, end to end.
Free on Android and iOS. Book a free site visit, get a 3D rooftop design and savings estimate, track your installation and subsidy live, monitor your plant for life, and earn Heaven Solar Sarathi referral payouts, all in one app.
Free site visit, 3D design & savings
Engineer visit, rooftop 3D and exact monthly savings, free.
Live project tracking
Real-time install updates, subsidy status, warranty & invoices.
Heaven Solar Sarathi: refer & earn ₹1,000 / kW
Manage leads and payouts directly in the app.
Monitor your solar plant
Live generation, savings and CO₂ offset, lifetime.
Built for every stage of going solar.
Whether you're exploring, mid-install, already generating, or referring friends, the app has a screen for it. It covers residential rooftop solar, commercial and industrial projects alike, and you can run the same numbers on the web with our solar savings calculator.
Free site visit & 3D design
Book an engineer visit, get a rooftop 3D design and an exact monthly savings estimate, no cost, no obligation.
Live project tracking
Follow design approval, subsidy status, material dispatch and installation in real time.
Service requests, anytime
Raise a ticket in seconds, day or night, with no phone tag. Our team picks it up Monday to Friday, 9 AM to 5 PM.
Lifetime plant monitoring
Live generation, savings versus your old bill, and CO₂ offset, for as long as your plant runs.
Heaven Solar Sarathi referrals
Submit leads, track every referral, and earn a payout for each one installed, paid directly through the app.
See it in action.
A quick tour of the screens customers and Heaven Solar Sarathi partners use most.
Turn your network into real income.
Heaven Solar Sarathi is Heaven Green Energy's in-app referral program, distinct from other "Solar Sarathi" schemes you may have heard of. Anyone can join, no office visits, no paperwork, just your phone. If you install or sell solar for a living, look at our channel partner programme instead.
Four steps, start to solar.
From download to your first month of savings. Prefer to talk to someone first? Contact the Heaven Green team or find your nearest team on our solar by location page.
Download the app
Get it free on Google Play or the App Store and sign in with your mobile number.
Get your design & quote
Check your required plant size, book a free site visit, and get a 3D design with savings.
Track your install
Watch subsidy, design and installation progress update in real time.
Go solar & earn
Monitor your plant for life, and refer friends through Heaven Solar Sarathi to earn ₹1,000/kW.
Heaven Solar Sarathi App, Answered
Common questions about the app and Heaven Solar Sarathi referrals.
Still have questions? Is the Heaven Solar Sarathi App free to use?
What can I do in the app before I sign a contract?
How does Heaven Solar Sarathi (refer & earn) work in the app?
Can I track my installation progress after I sign up?
Does the app work after my system is installed?
Your solar journey fits in your pocket.
Download the Heaven Solar Sarathi App and get a free site visit, live tracking, and Heaven Solar Sarathi referral earnings.