Is your shed ready for solar? Checklist

Download a real three-page shed-roof solar readiness checklist covering structure, access, drainage and electrical questions.

Download the PDF

3-page tagged A4 PDF · no form required

A shed is ready for a solar proposal when the owner can give the survey team safe access, roof rights, a record of the roof's condition, and a named structural and electrical review path. It is not ready merely because the roof looks large in a photograph. The downloadable worksheet helps a factory team collect those facts and mark what remains unknown before asking EPCs for a final price. It cannot approve the roof, specify a clamp or replace a qualified engineer's assessment.

Download the checklist PDF now. The document is a three-page file with fields for site details, roof condition, structural questions, access, electrical handoff and blockers. It downloads directly from this page. If you want a plant-specific proposal after gathering the documents, use the separate Get a load-based proposal for my plant route at industrial solar.

Start by deciding who may inspect the roof

The first checklist item is not panel capacity. It is safe access. Industrial sheds can have fragile sheets, skylights, corroded fasteners and altered or undocumented bays. A plant team should not climb a roof to complete a marketing worksheet. Use existing drawings, maintenance records and photographs taken from safe locations first. If the roof is fragile, visibly deteriorated or lacks a controlled access method, stop and have the site safety team and a qualified structural reviewer define how it can be inspected.

This distinction prevents a dangerous misunderstanding: a ticked box is a record of an observation, not a sign-off. A maintenance supervisor may know that a roof leaks at a certain bay or that a purlin was replaced. That knowledge is valuable input for the engineer. It does not prove that the roof can carry a new array, a maintenance crew or the wind actions associated with the mounting system. The US DOE's current PV installation guidance names roof compatibility, structural strength, age and wind exposure as suitability factors. That is general design guidance; Indian site design must use the applicable local code and qualified sign-off.

The worksheet therefore has three statuses in practice: known and evidenced, unknown, or needs professional review. A “known” item should point to a photo, drawing, maintenance log or named person. Do not score a roof as “80% ready” by counting ticks. One unresolved structural issue can matter more than twenty completed administrative fields.

Establish roof rights and document history

Find out who owns the building and who can authorize attachments, access and repairs. A factory may own its equipment but lease the shed, or use a roof shared with another unit. A landlord, estate authority, lender or insurer may have rights that affect installation. The checklist asks for ownership and lease status so that the project does not reach the mounting design stage before permission is known. It deliberately does not state that a particular NOC is universally required; the actual contract and local authority route must be reviewed.

Collect the most recent structural drawings, any as-built revisions, extension records and roof-maintenance log. Sheds are sometimes modified after their original design: a new exhaust duct, suspended conveyor, heavier ceiling service or replacement sheet can change what an engineer needs to assess. Write down what has changed and where. If the structural drawing is missing, mark it missing and ask the engineer what survey or measurement will be needed. Do not let the EPC's quote assume drawings exist if nobody has seen them.

Record roof age, roof material and whether repair or replacement is already planned. A solar array is a long-lived installation; removing it later to repair a roof can disrupt the plant. The US DOE commercial rooftop FAQ highlights roof integrity and warranty as concerns when a building owner considers PV mounting. Its discussion is not a Gujarat code, but the procurement question is still useful: who accepts responsibility if the attachment affects weather tightness, and what evidence will show the roof was in sound condition before work began?

Record visible condition without diagnosing it

Use a roof-block plan and photo IDs. Mark sagging or deflection, corrosion, loose or damaged sheets, leak stains, repairs, ponding, skylights, vents and existing equipment. A photo that shows the whole roof can establish context; close-ups show a fastener, seam or stain. Write where each photo was taken. If the view is from below, say so. A photograph cannot measure purlin thickness, internal corrosion or structural capacity, but it can direct the engineer to the right bay.

Leaks deserve special attention because solar mounting can add attachment points and make later access to the sheet harder. If the plant already has a recurring leak, document it before any EPC touches the roof. The final design must address weatherproofing at attachments or penetrations and state who is responsible for testing and repair. A buyer should not accept an unqualified “no leak” promise from a generic product brochure. A seam clamp, bracket, rail or penetration detail must be compatible with the actual sheet profile, purlin position and site conditions.

Corrosion needs context. A coast-adjacent plant, a chemical process and a textile processing roof may expose materials differently. The worksheet asks where corrosion is visible and which process vents or exhausts discharge nearby; it does not prescribe a universal coating or cleaning frequency. The engineer and supplier need to choose compatible materials and check the roof's existing condition. If galvanic interaction between dissimilar materials is possible, document the proposed separation or detail. The US DOE weather-vulnerability guide explains why fastening and structural vulnerabilities should be addressed as design details, not left to assumptions.

Observation to log Useful evidence Decision it informs
Damaged or sagging roof bay Photo ID, bay location, maintenance record Structural review and whether repair precedes layout
Leaks or patched sheets Roof and ceiling photos, repair date Waterproofing scope and responsibility
Corroded purlin or fasteners Safe-view photos and drawing mark Survey method and material compatibility review
Skylight, smoke outlet or vent Mark on roof plan Exclusion, safe access and array layout
Existing equipment and pipework Dimensions, maintenance access Usable area and cable route

This table helps a factory team produce a useful handoff. It does not ask the team to diagnose structural safety from sight. An unresolved item remains a review gate, not a reason to fill the box with “okay”.

Have the engineer follow the load path

Solar modules are supported by rails or another mounting system, which transfers forces into brackets or clamps, then to sheets, purlins, rafters, columns and foundations. The exact path depends on the roof. A narrow statement that “the panels weigh only a few kilograms per square metre” does not test wind uplift, concentrated attachment forces, roof condition or the other loads already present. The engineer needs the roof geometry and structural data, mounting arrangement, local wind design basis and access loads to assess the proposed system. This page does not publish a generic allowable kg/m² figure because it would invite misuse on roofs with very different structures.

Ask who will inspect and certify the structure, what drawings and calculations will be delivered, and what repairs or reinforcement are excluded from the EPC price. If the roof documentation is incomplete, the engineer should specify how measurements will be obtained. The worksheet has fields for span, purlin spacing, material and condition, proposed attachment concept, design actions and the named sign-off deliverable. It does not instruct a plant operator to measure or climb onto an unsafe roof.

The attachment concept matters for both structure and weatherproofing. Standing-seam sheets, trapezoidal sheets and old corrugated roofs do not share one mounting detail. A clamp advertised as “non-penetrating” still needs proof that it fits the seam and transfers design actions safely. A bracket through a sheet needs a designed connection into suitable structure and a water-tight detail. The question for the EPC is show the exact load path and roof-sealing detail on the actual roof, not “which clamp is cheapest?”

Maintenance access is part of that design. A layout that fills every remaining roof rectangle can leave no safe route to clean modules, reach vents or inspect the roofing. Mark the access path and roof-work permit conditions before finalising module rows. If the roof requires a special rescue plan or fall protection, the site safety team must own that requirement. These are site-specific safety controls; a public page cannot certify them.

Map obstructions, shade and production exposure

Skylights and smoke vents need to remain identifiable and serviceable. Roof exhausts and chimneys can shade modules or deposit soot or chemical residue. A nearby taller building may shade only part of a roof at certain times. Record these features on the annotated plan and ask the EPC how it will survey them. Do not assume that every square metre not occupied by a skylight is usable for modules.

For a process plant, identify the source of lint, fibres, fumes, steam or soot near the roof. The reason is practical: deposits can affect cleaning access, module soiling and material selection. This page does not claim a standard cleaning interval or production loss percentage. Those require site observation and a maintenance plan. The buyer should ask the proposal to specify who will inspect, clean and maintain the system and how that team will reach it without interrupting production unnecessarily.

Cable routes also belong on the roof plan. The shortest straight line to the inverter or electrical room may cross a hot process area, a moving crane path, a roof drainage line or another tenant's space. The engineer must review electrical and physical routing together. The rooftop decision therefore connects to the factory's industrial solar design, not just the sheet profile.

Connect the roof survey to the electrical and utility plan

A strong roof does not mean the plant's electrical system is ready. Collect the last 12 bills, tariff category, contract demand and current SLD. Mark transformer, main board, DG interface, APFC equipment, utility meter and candidate solar tie-in. These records allow the EPC to evaluate load matching and the electrical work while the structural team works on the roof. A real project needs both lines of review to converge before a final capacity and price are accepted.

For a Gujarat project commissioned under the current GERC 2026 distributed-renewable regulation, the utility application, metering, technical feasibility, protection and commissioning requirements must be checked for the proposed arrangement. The regulation also references applicable CEA safety rules, including the 2026 amendment. A roof checklist cannot decide whether a particular plant needs Chief Electrical Inspector approval, but it can ensure that the project team names the person who will confirm the route.

If installation involves a connection to a main distribution bus, the factory may need a planned isolation window. Roof mounting work and electrical tie-in are separate operations. Ask the EPC to state which work can happen during production and which requires power isolation. “No shutdown” should be a site-specific engineering conclusion, not an advertising line. The worksheet records the plant's approved shutdown windows so the proposal can plan around them.

Use the worksheet with an EPC

Complete the first page from records that already exist. Attach clear photo IDs and list every missing drawing. Have maintenance and safety teams review the roof-condition notes before sending them externally. The second page is for the structural and layout questions: it should be handed to a qualified reviewer, not filled with guessed values. The third page records electrical documents, utility questions and decision blockers.

When inviting bids, give each EPC the same worksheet and evidence. Ask for a roof layout, attachment detail, structural review scope and electrical connection basis. If one bidder excludes roof repairs while another includes them, mark that difference rather than comparing only kWp and price. If the plant is leased, resolve permission before finalising the mounting method. If the roof is unsafe, ask for a repair or alternative siting assessment before soliciting a full rooftop installation price.

The output of a good first survey is a decision record: which roof blocks are potentially suitable, which are excluded, what must be repaired or measured, who signs the structural design, where solar may connect, which utility route is proposed, and what information the final quotation still needs. That is more useful than a yes/no sticker on a drone photo.

Questions before the first site survey

Can a factory owner complete this without an engineer? The owner can gather drawings, safe-view photos, leak records, roof rights and production constraints. Structural capacity, attachment design, wind action, electrical tie-in and approval applicability need qualified review. The PDF deliberately separates observations from sign-off.

What if the roof has old sheets but no obvious leak? Age alone neither proves failure nor proves suitability. Record the age and condition, avoid unsafe access, and request a roof and structural assessment before a final layout. Old sheets may also affect maintenance and replacement planning even if they are currently weather-tight.

Does a non-penetrating clamp avoid all roof risk? No. It still must suit the exact seam or sheet profile, resist the design actions and avoid damaging the sheet. The supplier's detail and engineer's review matter. A clamp name is not a structural calculation.

Can the checklist tell me how many kW fit? It intentionally cannot. Usable area, actual module dimensions, row layout, shade, structure and electrical constraints all affect capacity. Use the worksheet to prepare the survey, then have the EPC provide a dimensioned layout and load-based proposal.

Is the PDF a safety permit? No. It is a buyer preparation aid. Site safety rules, permits, fall protection and qualified supervision govern actual access and work.

Should I send the checklist to every bidder? Yes, after reviewing it for confidential information. Giving every bidder the same records makes their scope and assumptions easier to compare. Missing facts should be disclosed consistently.

Download and next step

Use the three-page shed roof solar checklist to collect the roof, structure, access and electrical records. It is available without a form. A separate download request may be recorded as a download event or optional follow-up, but it is not a substitute for the file and should not be counted as an industrial sales lead. Once the roof and load documents are ready, use the industrial solar page and the CTA Get a load-based proposal for my plant. The enquiry form is separate from the PDF; call +91 63904 05060 if you prefer to talk through the document list.