Four parties may hold four different rights
A leased-site project can involve the building owner, the operating tenant, the electricity consumer and the owner of the solar asset. Sometimes one entity holds several roles; sometimes each role belongs to a different party. A rooftop proposal becomes confusing when these roles are compressed into “the factory.” The first page of a useful project brief should name the legal entity in each position and the document that supports it.
For example, a tenant may pay the electricity bill but the landlord may own the building and roof. A third-party investor may own the solar equipment. The distribution licensee sees the consumer account and the proposed grid connection. A GIDC plot may add allotment or estate conditions. None of those facts can be inferred from a business card or site photograph. The 2026 GERC Grid Interactive Distributed Renewable Energy Sources Regulations, clause 8.1(II), say the system owner must own, lease, lawfully possess or otherwise have valid legal authority to install and operate at the rooftop or other location. The rule does not mean every tenant automatically owns the roof.
| Role | Question to settle | Evidence to review |
|---|---|---|
| Building/roof owner | Who may grant attachment, access and continued use? | Title/lease chain, roof-use clause, signed consent |
| Factory tenant/operator | Who occupies the premises and bears operational disruption? | Factory lease, renewal rights, EHS rules |
| Electricity consumer | Whose account and sanctioned connection will be used? | Recent bills, consumer name, connection documents |
| Solar asset owner | Who purchases, insures, operates and later removes equipment? | EPC or power-purchase contract, asset register, finance documents |
| Estate or lender, where relevant | Is another approval or restriction recorded? | Allotment terms, mortgage/charge, estate rules |
The table is a document map, not a claim that every listed party must sign every project. A lawyer, property manager and utility application team should resolve the actual chain of authority. The 2026 GERC rule also places responsibility for safe operation and defects on the DRES owner up to the applicable interconnection point; contracts should reflect that responsibility rather than leaving it between the tenant and landlord.
Read the lease before sizing panels
The first lease question is whether the tenant has exclusive roof use or only a right to occupy the factory floor. Many leases describe the premises broadly but reserve terrace, equipment and repair access to the owner. A tenant with a long factory lease may still need a separate roof licence or amendment for solar fixings, cabling, inverter placement and maintenance access. The agreement should also address shared roofs, skylights, water tanks, telecom equipment and future roof repairs. If the site sits on an estate plot, read the allotment and subletting terms too; GIDC's property guidance shows that its allotments and permissions have their own procedures.
The second question is time. A solar plant is meant to operate for years, while a factory lease may have a shorter remaining term or uncertain renewal. Do not assume an extension will be signed. The owner and tenant need a written plan for renewal, continued roof access, early termination, sale of the building, insolvency, and removal or transfer of the solar plant. The economics should model at least a realistic lease-end scenario, not only a full-life scenario that may never occur at that site.
The third question is authority to alter the roof and electrical system. A landlord's casual message approving “solar” may not cover structural reinforcement, drilled roof fixings, new cable routes through common space, transformer work or a utility application in the consumer's name. A useful consent document identifies the exact roof, proposed mounting scope, equipment rooms, cable path, application signatories, access rules and restoration duties. Ask a qualified adviser to put these terms into an enforceable agreement; this page is a buyer checklist, not a substitute for legal drafting.
What a landlord consent should actually cover
A short NOC can establish support for a utility application, but the underlying lease or licence should handle the operational details. Start with a drawing that marks the agreed roof zones and structural supports. State whether the landlord has reviewed existing leaks, roof warranties and insurance conditions. Define who can enter the roof for construction and maintenance, what notice is required, and who may shut work down for safety. If the landlord may replace roof sheets or add HVAC units later, reserve a process for coordinating with the solar owner.
The agreement should also settle compensation for damage caused by installation, how pre-existing damage is recorded, and who pays when the roof must be repaired under the array. Clarify who owns the cable, inverter, meter-related equipment and mounting structure, and who carries the insurance. If a lender has security over the property, its documents may restrict alterations; do not assume landlord consent alone resolves that. At lease end, specify whether the plant is removed, sold to the landlord, assigned to a new tenant, or operated under a new arrangement. Each route has different technical, commercial and tax consequences.
| Agreement topic | Buyer question | Why vague wording fails |
|---|---|---|
| Roof area | Which exact bays and access routes are granted? | “Use the roof” may conflict with vents, repairs or another tenant |
| Fixings and waterproofing | Which design and repair standard applies? | Leak responsibility becomes disputed |
| Utility application | Who signs for the consumer account and site rights? | An application may stall at document review |
| Operations | Who may access inverter, meter and roof, and when? | Maintenance can become impossible during production |
| Insurance and damage | Who covers each asset and third-party loss? | The policy may exclude an undeclared installation |
| Lease end | Remove, transfer or buy out: who decides and on what terms? | A plant can be stranded when tenancy changes |
This table is an agenda for a negotiated document. An EPC can identify the physical scope and the required drawings; the parties' lawyer and tax adviser should settle rights and commercial obligations.
Check the connection and current Gujarat rules
The electricity consumer on the bill is central to an on-site solar proposal. Confirm the account name, utility, tariff category, sanctioned or contract demand, meter arrangement and whether the premises has other generating equipment. A leased shed does not necessarily have a separate connection from the landlord's adjoining building. If loads or meters are shared, the electrical arrangement may differ from what a rooftop photograph suggests.
The GERC 2026 DRES notification repealed the previous 2016 rooftop regulations for the relevant new applications. It sets conditions for owner-level eligibility, connectivity, capacity, metering and safety. It also requires registration and applicable approvals rather than allowing a private roof arrangement to bypass them. The correct route depends on whether the tenant owns the plant, a third-party/RESCO owns it, and how the power is used and settled. The 2026 rule has different arrangements; do not label all leased-roof projects “net metering” before the actual connection is reviewed.
Ask the EPC to identify the current regulation, the specific DISCOM's procedure and the application documents it expects. The GERC regulation text requires technical and safety compliance with relevant authorities and says the DRES owner must obtain applicable registrations and permissions. An old article or an unverified vendor checklist should not determine eligibility. Record the date and version of every authority document in the proposal because policy and application practice can change during a long lease negotiation.
Who owns the plant, and who receives the electricity benefit?
Ownership can sit with the operating tenant, the building owner or a third-party solar company. Those options change who pays capital costs, who maintains the plant and who may claim any tax treatment. The factory that consumes power is not automatically the owner of the solar asset. Likewise, owning the roof does not automatically make the landlord the purchaser of the system. The contracts, invoices, asset register, funding and actual use need to match the claimed structure.
For a tenant-owned system, the tenant should confirm that its roof right lasts long enough, that equipment can be accessed and removed, and that the utility arrangement supports its use. For a landlord-owned system, the parties should document how the tenant pays for or receives solar electricity, who holds utility approvals and what happens when a new tenant arrives. A third-party model adds a power or service agreement and may require more explicit consent and assignment provisions. None of these is inherently the “best” model; the project must be evaluated against lease security, tariff, funding and tax treatment.
Keep the physical and financial models aligned. A 20-year spreadsheet is weak if the roof licence ends in five years without a clear extension or transfer right. An asset may also have removal cost and roof-restoration obligations at expiry. Include those possible costs in a scenario analysis. Do not treat a speculative sale price to the landlord as guaranteed value.
Depreciation and GST: ask the right party's adviser
The Income Tax Department's current Appendix I depreciation table lists solar power generating systems at 40% written-down-value depreciation under the relevant rules. That is a rate entry, not an answer to “does this tenant claim 40%?” Eligibility and timing depend on the asset's owner, business and accounting treatment, put-to-use date and applicable law. An operating tenant who merely buys power from another owner should not assume it owns a depreciable solar asset. A landlord should not assume roof ownership alone makes it the purchaser. Confirm the actual structure with your CA before using depreciation in the investment model.
GST creates a different question. A rate charged on eligible solar goods does not prove that the buyer can claim input tax credit. ITC depends on the recipient, taxable use, invoice, statutory conditions and blocked-credit rules, including how a particular installation is classified. The CBIC's CGST Act text, sections 16 and 17 is a starting point, but its public PDF has amendments to check; a current CA should review the exact procurement and contract. The GST Council's 2025 release records a reduced 5% rate for specified renewable-energy devices, but goods, installation and composite supply may be treated differently. Do not combine that headline rate with an automatic ITC or savings promise.
For a leased property, give the CA the complete documents: the lease and roof licence, EPC or power-purchase agreement, invoices, asset ownership schedule, GST registration and intended electricity use. Ask for a written conclusion on who, if anyone, may claim depreciation or ITC and on what basis. If the answer changes the bid ranking, obtain it before signing, not after commissioning. This page gives the rule and decision path; it does not assign the tax benefit to the tenant or landlord.
The roof still needs an engineer
Legal permission to use the roof does not certify that it can carry solar. A metal shed's sheet, purlins, rafters and columns form a load path that needs review for added dead load and wind uplift. A leased building may have been extended or repaired without complete as-built drawings. Document those changes, existing leaks, corrosion, skylights and maintenance routes. A structural engineer should state which roof bays can be used and what strengthening, if any, is needed. The landlord's agreement should permit the inspection and any resulting work before a fixed EPC scope is accepted.
The CEA electrical-safety regulation register lists the 2023 regulations and a BESS-focused 2026 amendment effective 1 April 2027. The actual design must use safety and connection requirements in force on the project date. A tenant should coordinate with the landlord and plant EHS team on access, lifts, exclusion zones and shutdown windows. “No production interruption” cannot be promised before the existing electrical system and work method are reviewed.
A roof condition record protects both parties. Photograph and map pre-existing leaks, sheet dents and corrosion, then agree the repair responsibility. At handover, retain as-built drawings, fixing details, test records and a route for future roof repairs. If the lease ends, those documents help the next owner understand what is attached and how it can be isolated or removed safely.
Model the lease-end cases, not just the sunny years
At minimum, compare three outcomes. In the first, the tenant renews and keeps operating the solar system. In the second, the tenant leaves and removes it, paying for isolation, lifting, roof restoration and possibly relocation. In the third, the plant transfers to the landlord or a new occupant under a negotiated price and utility arrangement. Each option can be technically possible but commercially different. The agreement should specify how the choice is made, the notice period and the condition in which the roof is returned.
A financial model should show the lease term, any renewal assumption, expected usable solar generation, electricity tariff components, operating and insurance cost, roof repairs, financing, taxes after CA review, and termination outcome. Keep forecast generation separate from guaranteed performance. There is no honest generic Heaven Green payback period for this situation: the remaining lease term and exit rights can dominate the answer. The NREL PVWatts methodology can inform a generation estimate, but it cannot supply the missing lease, tariff or ownership facts.
The best early action may be to negotiate the roof licence before paying for detailed design. If the landlord will not grant access for the intended term, a beautifully optimised array has no site. If the agreement is sound but the roof fails structural review, the system may need a different bay, strengthening or a different property. Resolve those gates sequentially so an apparent low-price quote does not become a stranded procurement.
What to send with a proposal request
Send the factory lease and any roof-use amendment; the landlord's contact for consent; property or GIDC allotment conditions if applicable; the name on the electricity bill; twelve bills; connection and tariff details; roof drawings and repair history; machine shifts; and the proposed asset owner. Where a document is confidential, share a redacted extract showing the rights and dates with an adviser before circulating the full lease. Ask the EPC to state which assumptions remain provisional and what additional survey is needed.
The returned proposal should separate engineering scope from legal and tax assumptions. It should identify the accepted roof zone, preliminary size, point of electrical connection, current utility rule, proposed metering arrangement, required permissions, installation window, maintenance access and lease-end technical work. It should not claim that the EPC has resolved a tax question merely because the quotation includes a 40% depreciation line. Have the CA and property adviser review their respective parts.
The industrial solar route covers the broader factory project. The commercial solar route may fit a non-industrial tenant. Both existing pages have inherited unverified claims that require cleanup before they are relied on as publishing destinations.
Questions to close before signing
Can a tenant apply without owning the building? Potentially, if the system owner has valid legal authority for the rooftop and the project satisfies the current GERC and DISCOM requirements. A lease may or may not give enough roof rights; review the exact wording and supporting consent.
Does a landlord NOC solve everything? It can be one important document, but it may not cover structural work, insurance, access, utility signatures, lender restrictions or lease-end obligations. Put those matters into the full agreement.
Who claims solar depreciation? The official schedule lists a 40% rate for qualifying solar power generating systems. Which entity, if any, claims it depends on the ownership, use and tax facts. Confirm with the entity's CA.
Can a rented roof qualify for GST input credit? There is no blanket answer. The recipient and tax use of the supply, invoice, installation classification and current GST law matter. Obtain a project-specific CA conclusion.
What happens if we leave the shed? The lease or roof licence should say whether the equipment is removed, sold, assigned or left in place, who pays for the work and how utility permissions are handled. Model that outcome before buying the plant.
Get a load-based proposal for my plant. A site-specific proposal can then show what is feasible, which rights and approvals remain open, and what the project would require before anyone signs.