Contract demand is the kW or kVA capacity your electricity supplier agrees to make available to your connection. It is written into the supply agreement and usually appears on a factory electricity bill. Maximum demand is what the meter actually recorded as your highest qualifying average during the billing period. Billing demand is the number the tariff uses to calculate the month's demand charge. These three numbers are related, but they are not interchangeable. GERC's 2026 distributed renewable energy regulation defines contracted demand; the DGVCL FY 2026-27 tariff order sets the billing-demand and demand-charge rules used in the examples below.
This calculator is for DGVCL's standard LTMD and HTP-I tariff categories under the order dated 25 March 2026, effective for FY 2026-27. Enter the contract demand and actual maximum demand from the same bill. Select LTMD if your bill uses kW and HTP-I if it uses kVA. The result shows the tariff's 85% floor, the billing demand, any demand above your contract, and the demand-charge component only. It does not calculate your full electricity bill or recommend that you change your contract.
Rules checked: 23 November 2026. Check your current bill's tariff category and the current GERC order before using these results for a decision in 2027. Seasonal, night-use and other special tariff options follow different conditions and are outside this calculator.
Calculator interface: Tariff category [LTMD: kW / HTP-I: kVA] · Contract demand · Recorded maximum demand · Calculate. The result card shows the 85% floor, tariff minimum, billing demand, within-contract and excess portions, and demand-charge component. The current screen calculates one contract-demand value at a time; the four-row table below illustrates separate what-if calculations against the same recorded maximum demand. These are scenarios, not an application to DGVCL.
What the calculator computes
For the two standard categories covered here, the billing demand is the highest of three quantities: the actual maximum demand measured in the month, 85% of the contract demand, and a tariff-specific minimum. The minimum is 6 kW for LTMD and 100 kVA for HTP-I. This is stated in clauses 5.6 and 11.4 of the DGVCL FY 2026-27 tariff schedule.
In compact form:
LTMD billing demand (kW) = max(actual maximum demand, 0.85 × contract demand, 6 kW)
HTP-I billing demand (kVA) = max(actual maximum demand, 0.85 × contract demand, 100 kVA)
The calculator then splits that billing demand at your contract level. Units up to the contracted level use the applicable demand-charge slabs. Any billing demand above the contract uses the tariff's excess-demand rate. The rate unit matters: LTMD charges per kW and HTP-I per kVA. Multiplying an HTP-I kVA figure by an LTMD rupee-per-kW rate gives a plausible-looking but wrong answer.
| DGVCL standard category | First in-contract slab | Next in-contract slab | Remaining in-contract slab | Above contract | Billing-demand minimum |
|---|---|---|---|---|---|
| LTMD | First 40 kW at ₹90/kW/month | Next 20 kW at ₹130/kW/month | Above 60 kW at ₹195/kW/month | ₹265/kW/month | 6 kW |
| HTP-I | First 500 kVA at ₹150/kVA/month | Next 500 kVA at ₹260/kVA/month | Above 1,000 kVA at ₹475/kVA/month | ₹555/kVA/month | 100 kVA |
Source: GERC, DGVCL tariff order for FY 2026-27, Rate LTMD §§5.1 and 5.6; Rate HTP-I §§11.1 and 11.4. The table is not a complete tariff summary. Energy charges, time-of-use adjustments, reactive energy or power-factor charges, duties, surcharges, arrears and taxes are excluded. Tariff amendments or a different licensee can change the answer.
The phrase “first 500 kVA” does not mean every HTP-I customer with billing demand above 500 kVA pays the second rate on every kVA. It means the first block uses the first rate, the next block uses the second, and so on. The excess-demand rate applies to the portion beyond your contract, not to the entire billing demand. This distinction is why the calculator shows the in-contract and excess components separately.
A worked HTP-I bill example
Suppose your DGVCL HTP-I bill shows 600 kVA contract demand and 560 kVA maximum demand for the month. Eighty-five percent of the contract is 510 kVA. The tariff minimum is 100 kVA. The largest of 560, 510 and 100 is therefore 560 kVA billing demand. Because it is below the 600 kVA contract, there is no excess-demand component.
The demand charge is: 500 × ₹150 + 60 × ₹260 = ₹90,600 for that billing period. That is the demand-charge line under the tariff assumptions, not the total bill. The energy used by your plant is charged separately, and other applicable items remain payable. The example deliberately avoids an invented factory bill or solar saving. Rate HTP-I, §§11.1 and 11.4.
| Step | Calculation | Result |
|---|---|---|
| Contract floor | 600 kVA × 85% | 510 kVA |
| Compare actual, floor and minimum | max(560, 510, 100) | 560 kVA billed |
| First demand slab | 500 kVA × ₹150 | ₹75,000 |
| Second demand slab | 60 kVA × ₹260 | ₹15,600 |
| Excess over contract | max(0, 560 − 600) | 0 kVA |
| Demand charge only | ₹75,000 + ₹15,600 | ₹90,600 |
Now change only one input: suppose a separate month records 650 kVA maximum demand with the same 600 kVA contract. Billing demand becomes 650 kVA. The 600 kVA within contract costs ₹75,000 for the first 500 kVA plus ₹26,000 for the next 100 kVA, or ₹101,000. The 50 kVA above contract costs 50 × ₹555 = ₹27,750. The demand-charge result is ₹128,750. This is why a plant that usually peaks below the contract still needs to understand its occasional high-demand month. The tariff's demand component is not simply contract demand × one flat rate.
A worked LTMD bill example
For an LTMD connection, keep the units in kW. Suppose the bill lists 80 kW contract demand and 70 kW maximum demand. Eighty-five percent of the contract is 68 kW; the other tariff floor is 6 kW. The highest number is the measured 70 kW, so billing demand is 70 kW. The demand-charge calculation is 40 × ₹90 + 20 × ₹130 + 10 × ₹195 = ₹8,150. DGVCL FY 2026-27, Rate LTMD §§5.1 and 5.6.
If that LTMD site measures 90 kW while retaining an 80 kW contract, the within-contract part is ₹10,100: 40 × ₹90, 20 × ₹130 and 20 × ₹195. The extra 10 kW above contract adds ₹2,650 at ₹265/kW. The demand charge becomes ₹12,750. If your actual bill does not match, compare its tariff category, billing dates, maximum-demand value, any seasonal option and other line items before concluding the meter is wrong.
These examples also show the 85% floor's effect. If an HTP-I plant has 1,000 kVA contract demand but records only 100 kVA maximum demand in a quiet month, the tariff's 85% figure is 850 kVA, which becomes the billing demand. Reducing usage alone may therefore leave a large demand-charge line. That does not prove the contract should immediately be cut: the plant might need that capacity during a seasonal run, a maintenance restart, or a new production line. Contract changes require an operational and tariff review, not one low-demand month.
Should you compare a lower contract demand?
To compare hypothetical contracts with this one-scenario calculator, rerun it with each candidate contract level while holding one month's actual maximum demand constant. The resulting demand-charge components can then be compared, as in the table below. For example, with an HTP-I maximum of 560 kVA, the FY 2026-27 DGVCL rule gives these results:
| Hypothetical HTP-I contract | 85% floor | Billing demand | Demand above contract | Demand charge only |
|---|---|---|---|---|
| 500 kVA | 425 kVA | 560 kVA | 60 kVA | ₹108,300 |
| 550 kVA | 467.5 kVA | 560 kVA | 10 kVA | ₹93,550 |
| 600 kVA | 510 kVA | 560 kVA | 0 kVA | ₹90,600 |
| 650 kVA | 552.5 kVA | 560 kVA | 0 kVA | ₹90,600 |
Source and method: same DGVCL HTP-I demand-charge clauses, with each row computed from the formula above. The four rows are what-if calculations, not historical bills or a prediction. They ignore any security deposit change, connection alteration fee, energy-charge effect, power factor, solar generation, and future peak. The last two rows have the same demand charge in this single month because the recorded 560 kVA remains higher than both 85% floors. A different month can produce a different result.
Do not choose the lowest candidate from that table. Request at least 12 months of actual maximum-demand values, including monsoon, annual shutdown and the highest-production season. If the utility meter provides interval data, compare the recorded peak with the operations diary: Which machines started? Did a compressor, chiller, furnace, pump or air-handling plant overlap? A production plan for the next year matters too. If your site expects a new line, the historical maximum is an incomplete guide. The calculator can quantify the tariff consequence of a proposed contract; it cannot approve that contract or decide the capacity your plant needs.
The 2026 GERC DRES rule defines contracted demand for renewable-energy connections and attaches conditions when proposed solar capacity exceeds the contract for consumers above 100 kW. That is a separate reason to review a proposed contract reduction alongside the existing or planned solar plant. A lower contract figure may change the solar design or metering route even if one tariff scenario appears cheaper. Check both rules before changing the supply agreement.
Why solar does not automatically lower contract demand
Rooftop solar produces energy when sunlight is available. A factory's contract demand is a contractual capacity, not the sum of its monthly kWh purchases. Installing panels does not rewrite that agreement. Solar may lower a recorded peak if the plant's highest grid draw happens while the panels are generating enough power, but that is a coincidence to test with interval data. The recorded maximum can still occur at night, at first shift start, on a cloudy day, or when the inverter is unavailable. An energy reduction in kWh is therefore not automatically a demand reduction in kW or kVA.
Before claiming a demand-charge benefit, plot the factory's grid demand across real days and overlay a conservative solar production profile for the proposed roof. Mark the 15- or 30-minute demand interval used by the meter where relevant; the DGVCL HTP-I schedule describes maximum demand as an average over consecutive 30 or 15 minutes, with a specific three-minute option in a parallel-operation setting. DGVCL FY 2026-27, HTP-I §11.7. A ten-second motor start is not necessarily the billed maximum, and a smooth daily average can hide the demand interval that actually matters. Ask the utility or plant energy team for the recorded profile instead of assuming the raw motor nameplate is the billing demand.
For a solar project, the more reliable first analysis is usually daytime self-consumption and export, then the effect on actual maximum demand as a separate scenario. The two should not be combined into a single “solar will cut the bill by X%” claim. If your factory is in a DGVCL area, the 2026 renewable-energy rule also limits non-residential net-meter export adjustment and leaves demand and fixed charges payable. The industrial solar service page is the starting point for reviewing your site and connection.
What to check when the calculator and your bill disagree
First, check the bill period and tariff category. This calculator uses the DGVCL FY 2026-27 order's standard LTMD and HTP-I clauses only. A consumer on HTP-II, HTP-IV, an EV charging tariff, a seasonal option, a different state-owned Gujarat licensee or Torrent Power needs the relevant schedule. The words “factory bill” are not enough to select HTP-I. Your bill determines the applicable rate class.
Second, confirm the units. LTMD calculations here use kW, HTP-I uses kVA. A kVA figure and a kW figure may be numerically different because of power factor. GERC's 2026 DRES regulation includes a 0.9 factor for a specific contracted-demand conversion where a supply agreement uses kVA, but that provision is not an instruction to convert every bill reading at an assumed power factor. Use the bill's own recorded units and the matching tariff. If the bill lists both, compare the relevant line used in its demand-charge calculation. GERC DRES 2026, definition 2.1(9).
Third, separate demand charge from energy charge, time-of-use adjustment, power-factor or reactive-energy line, fuel or power-purchase adjustment, duty and arrears. The output on this page is intentionally narrower than the amount due. In particular, the HTP-I schedule has energy-charge slabs tied to billing demand and power-factor adjustments on the energy-charge amount. Reproducing every line would require actual interval and billing data that a two-field tool does not collect. A transparent partial result is more useful than a “total bill” that quietly omits half the bill.
Fourth, examine the maximum-demand input. A single large number may be a meter reading for the wrong period, an old contract value, or a mistaken kW-to-kVA transcription. Use the billed maximum demand for that month and save the bill alongside the calculation. If the tool output still differs from the demand-charge line, ask DGVCL for the bill calculation and check for an amended tariff or charge. Do not change production plans or sign a solar contract to make the calculator match.
What this tool can and cannot decide
The tool is good for three tasks: checking the arithmetic behind a standard LTMD or HTP-I demand-charge line, seeing how an actual peak interacts with the 85% contract floor, and comparing hypothetical contract levels under the same measured peak. It makes the units and the applicable tariff year visible. It also lets a factory owner have a more focused discussion with an energy manager, accountant or solar EPC team.
It cannot tell you the lowest safe contract demand. It does not know your production peaks, planned machinery, grid availability, special tariff option, security deposit, annual minimum treatment, or DGVCL's current administrative requirements for changing a contract. It also cannot predict whether a rooftop array will shave the demand interval that defines the bill. A site with a cold store, furnace or multi-shift process needs a different operating model from a site that empties at 5 pm. The next step is a bill and load-profile review, not a one-click change request.
If you are planning solar for a DGVCL-billed factory, Heaven Green Energy can review the recent bills, roof information and operating hours for a load-based proposal. Bring the contract-demand line, maximum-demand history and any interval data you already have. The design should state where solar meets daytime load, where export is expected, and which demand assumptions remain unproven. See industrial solar for factories or get a load-based proposal for my plant through the industrial enquiry form. You can also call +91 63904 05060 or send site details on WhatsApp.