KUSUM Andhra Pradesh Application, NREDCAP and DISCOM Steps

KUSUM in Andhra Pradesh: scheme status in 2026, Component A, B, C, NREDCAP nodal agency process, APSPDCL, APEPDCL, APCPDCL steps, 60% subsidy, documents, timelines.

KUSUM Andhra Pradesh Application, NREDCAP and DISCOM Steps

Andhra Pradesh runs one of India’s most generous farm power regimes: agricultural connections receive free electricity for up to nine hours a day, backed by a large state subsidy. If you farm in AP, that generosity is exactly why the KUSUM Andhra Pradesh application works differently here than in Karnataka or Tamil Nadu. The state is putting its PM-KUSUM money into solarising entire agricultural feeders, not just individual pumps. The combined central and state subsidy reaches at least 60% of system cost under national PM-KUSUM rules, meaning a farmer’s share on a ₹2.5 lakh solar pump system can be as low as ₹25,000 plus an optional loan.

This guide covers the full KUSUM Andhra Pradesh application: who runs it (NREDCAP, the New and Renewable Energy Development Corporation of Andhra Pradesh), how Components A, B, and C differ in AP, the APSPDCL, APEPDCL, and APCPDCL steps, subsidy rates, documents, timelines, and the rejection reasons that stall most farmer files.

Direct answer. To apply for PM-KUSUM in Andhra Pradesh, register through NREDCAP or your DISCOM (APSPDCL, APEPDCL, or APCPDCL) when a district window opens, submit Aadhaar, Meebhoomi land records, bank details, and pump details, and pay your farmer share after selection. Subsidy is 60% combined (30% central + 30% state) with 10% farmer share and an optional 30% loan. Component B covers standalone solar pumps, Component C solarises existing grid-connected pumps, and Component A lets landowners host 500 kW to 2 MW solar plants. Under MNRE’s current timelines, new windows depend on PM-KUSUM 2.0, so confirm a window is actually open first.

The details below follow MNRE guidelines and Andhra Pradesh’s current announcements. Where AP practice differs from the national template, we say so explicitly.

Scheme status, October 2026. PM-KUSUM’s sanctioned period ran to 31 March 2026. MNRE has allowed projects whose PPA was signed, or whose Notice to Proceed was issued, on or before 31 December 2025 to complete by 31 March 2027, and has said there will be no extension beyond that date (MNRE office memoranda of 28 March, 25 May and 28 September 2026, published on the PM-KUSUM national portal). MNRE has said the scheme’s committed liabilities will move into a successor scheme, PM-KUSUM 2.0, which it described in March 2026 as at the proposal stage. Before preparing a file, confirm with your state implementing agency whether any application window is actually open.

What is PM-KUSUM and who runs it in Andhra Pradesh?

PM-KUSUM (Pradhan Mantri Kisan Urja Suraksha evam Utthaan Mahabhiyaan) is the Ministry of New and Renewable Energy (MNRE) scheme to solarise Indian agriculture: replace diesel pumps, add solar to grid-connected pumps, and let farmers earn from small solar plants on their land. Nationally, MNRE’s renewable energy statistics count about 13.8 lakh solar pumps installed under all its schemes as of 31 March 2026, of which about 34,000 are in Andhra Pradesh, according to MNRE. The farmer-facing national portal is pmkusum.mnre.gov.in.

In Andhra Pradesh, the state nodal agency is NREDCAP. It invites farmer registrations, tenders pump and plant work to empannelled vendors, and releases the state subsidy share after commissioning. Scheme notices and tenders appear on nredcap.in (NREDCAP, 2026).

The three DISCOMs (distribution companies) play the second role. APSPDCL covers the southern districts (Tirupati, Kadapa, Nellore, Anantapur belt), APEPDCL covers the eastern districts (Visakhapatnam, Kakinada, Rajahmundry region), and APCPDCL covers the central districts (Vijayawada, Guntur, Krishna, Prakasam region). For Component B, the DISCOM mainly certifies that your pump is genuinely off-grid. For Component C and feeder-level solarisation, the DISCOM is central: it handles feasibility, net metering, and is often the project proposer itself.

One honest note on where AP stands. Farmer posts on X through 2025 and 2026 repeatedly complain that Component B has barely moved in Andhra Pradesh since 2019. The state’s answer has been to go big on feeder-level solarisation instead: 1,162.8 MW approved to solarise 2.93 lakh pump sets across 1,156 agricultural feeders, as reported by SolarQuarter in December 2025. For the national scheme structure, see our PM-KUSUM complete guide.

The 9-Hour Daytime Power Test: which KUSUM route fits your farm?

Before any paperwork, run our proprietary route picker, The 9-Hour Daytime Power Test. It exists because AP already gives free daytime power, so the value of each component differs sharply by farm. Answer three questions:

  1. Does your land have a DISCOM agricultural meter? If no, Component B is your only route. If yes, go to question two.
  2. Do you actually get the promised nine hours of daytime power, reliably, in your village? If yes, your practical gain from KUSUM is small until your feeder is solarised; register interest but do not spend. If supply is erratic or night-heavy, Component C individual pump solarisation (IPS) converts your connection to dependable daytime solar with export income.
  3. Do you own 2 or more acres of fallow or low-yield land within about 5 km of an agricultural substation? If yes, Component A or a land lease to a feeder-level project is worth evaluating for steady rental income.

The test matters because of timing. If your 11 kV feeder is on the state’s feeder solarisation list, you will get reliable daytime solar power with no application, no farmer share, and no installation on your land. Applying for Component C IPS on a feeder that is about to be solarised wastes your 10% share. Ask your DISCOM sub-division office for your feeder’s status before spending anything; it is a five-minute enquiry that can save ₹25,000 or more.

Diesel-pump farmers fail the test at question one and should treat Component B as urgent: every season on diesel costs ₹80,000 to ₹1,10,000 for a 5 HP pump, more than most farmers’ entire KUSUM share. Our KUSUM Component B application guide walks that route end to end.

Subsidy rates: what an AP farmer actually pays

Under the national PM-KUSUM structure, the Central Financial Assistance is 30% of the benchmark or tender cost (whichever is lower), the state adds at least 30%, the farmer pays 10%, and an optional 30% bank loan can cover most of the remaining gap. Andhra Pradesh follows this standard structure; unlike Karnataka’s temporary 80% round, AP has not announced a higher state share as of mid-2026.

60%
Combined central + state subsidy
30% CFA + 30% state, MNRE, 2026
10%
Farmer share upfront
Plus optional 30% bank loan, MNRE, 2026
2.93 lakh
AP pump sets targeted for feeder solarisation
Reported plan, 1,156 feeders, SolarQuarter, Dec 2025
31 Mar 2027
Last completion date for already-awarded projects
PPA or NTP by 31 Dec 2025, MNRE OM, Sep 2026

In rupees, using MNRE benchmark costs as the guide: a 5 HP solar pump system costs roughly ₹2.5 to 3 lakh installed. At 60% subsidy, the farmer pays about ₹25,000 to 30,000 upfront, with the optional loan covering the balance. Compare that with the diesel bill above, and payback lands inside the first crop year.

Pump sizeTypical system costFarmer share at 60% subsidyDiesel cost avoided per year
3 HP₹1.6-1.9 lakh₹16,000-19,000 + loan option₹50,000-70,000
5 HP₹2.5-3.0 lakh₹25,000-30,000 + loan option₹80,000-1,10,000
7.5 HP₹3.6-4.2 lakh₹36,000-42,000 + loan option₹1,10,000-1,50,000
10 HP₹4.8-5.5 lakh₹48,000-55,000 + loan option₹1,40,000-1,90,000

These are planning figures; the payable amount is fixed by NREDCAP’s tender-discovered rates for your district. The right size depends on your borewell depth and crop water need, which our KUSUM pump size by borewell depth guide works through with Rayalaseema and coastal AP water tables in mind.

Planning a solar pump or a farm solar plant? See your subsidy, farmer share, and payback in 60 seconds with our free solar calculator.

Component A in Andhra Pradesh: solar plants on farmland

Component A is for landowners, not pump owners. You install, or lease land for, a decentralised solar plant of 500 kW to 2 MW on barren or fallow land, and sell power to the DISCOM under a 25-year Power Purchase Agreement (PPA) at a tender-discovered tariff. Our glossary explains how a PPA works if the term is new.

Andhra Pradesh is more active here than the national average, but through a specific door: the state is acquiring land for its feeder-level and decentralised plants partly by leasing government and endowment land. Those government leases give private landowners a reference point in lease negotiations; our working range is ₹25,000 to 40,000 per acre per year in most districts, indexed upward.

Who should seriously consider Component A in AP:

  • Landowners with 2 or more acres of fallow land near an agricultural substation, especially in Anantapur, Kadapa, and Kurnool districts where irradiation is among the best in South India.
  • Farmer producer organisations that can pool contiguous plots.
  • Farmers who want lease income without operating anything.

Who should skip it: anyone whose real problem is irrigation reliability. Component C or feeder solarisation solves that at zero or low cost. Our KUSUM Component A landowner guide covers PPA income maths in detail, but note that MNRE’s March 2027 completion deadline covers only projects whose PPA was signed by 31 December 2025, with financial closure due by 30 November 2026, so a new landowner is effectively waiting for PM-KUSUM 2.0. For engineering support on ground-mount layouts and grid drawings, our sister firm Heaven Designs has a practical explainer on PM-KUSUM project design.

Component B: standalone solar pumps, the diesel replacement route

Component B replaces your diesel or off-grid pump with a standalone solar pump, no grid connection involved. Nationally this is the flagship component, but in Andhra Pradesh it is the weakest link: the state’s free-power policy meant most irrigation was already grid-connected, so Component B demand was historically low, and farmer complaints on X in 2026 describe it as effectively stalled since 2019.

The practical reading for 2026: PM-KUSUM’s sanctioned period ended on 31 March 2026, and new Component B windows depend on PM-KUSUM 2.0. Genuinely off-grid farmers, particularly in upland Rayalaseema and tribal-belt mandals where borewells run on diesel, should get their documents clean and ask the NREDCAP district office to note their interest, so they are ready if a new round opens.

Eligibility essentials:

  • You own or lease agricultural land in Andhra Pradesh with a working borewell, open well, or surface source.
  • No DISCOM agricultural meter exists on that survey number (grid-connected farmers go to Component C).
  • Tenant farmers can apply with a registered tenancy agreement and landowner consent; see our KUSUM tenant farmer rules for the consent format.
  • One pump per survey number in most district rounds.

Two AP-specific cautions. First, groundwater-notified mandals (the state notifies over-exploited blocks) can face pump capacity caps, so do not assume 10 HP is available in your mandal. Second, because windows open irregularly, the farmers who get pumps are the ones whose documents were already clean when the window opened. Qbits Energy maintains a farmer-friendly walkthrough of the KUSUM agricultural solar subsidy structure, and our Component B application guide has the full document sequence.

Component C and feeder-level solarisation: AP’s main game

Component C is for farmers who already have a DISCOM agricultural connection, and in Andhra Pradesh this is where nearly all the money is flowing. It comes in two flavours.

Individual Pump Solarisation (IPS): a solar plant sized to your pump’s HP is installed at your farm. The pump runs on solar during the day, the grid stays as backup, and surplus units are exported under net metering at the DISCOM’s applicable rate. Subsidy follows the standard 60% structure, and your DISCOM handles feasibility and the net metering agreement.

Feeder Level Solarisation (FLS): one solar plant, typically 500 kW to a few MW, is built to supply an entire 11 kV agricultural feeder. Every pump on that feeder gets reliable daytime solar power with no installation at the farm. MNRE’s dedicated FLS guidelines are in this Press Information Bureau release. AP’s reported plan, described above, is a large FLS commitment.

For the farmer, FLS is mostly passive: you do not apply so much as get covered when your feeder is selected. IPS is the one you actively apply for, through your DISCOM. The step-by-step IPS process, including net metering paperwork, is in our KUSUM Component C grid-tied pump guide.

How to apply for KUSUM in Andhra Pradesh: step-by-step

Portal screens change between rounds, but the sequence below is stable for NREDCAP’s Component B cycles and the DISCOM-run Component C process.

Total elapsed time for a clean Component B file: 60 to 90 days nationally; in AP, plan for 90 to 120 days while NREDCAP’s process ramps up. Farmers in neighbouring states face similar paperwork but different portals; see our KUSUM Karnataka application and KUSUM Tamil Nadu application guides for comparison.

Documents and eligibility checklist

Andhra Pradesh’s document set is manageable because land records are digitised on Meebhoomi, but every document must agree with the others.

Documents required (Component B and C):

Eligibility at a glance:

  • Resident of Andhra Pradesh with agricultural land in the applying district.
  • Component B: no DISCOM agricultural meter on the survey number.
  • Component C IPS: existing legal agricultural connection in the applicant’s name.
  • Component A: 2 or more acres of contiguous land with clear title, within DISCOM evacuation distance.

Timelines: how long the AP process actually takes

Plan for 90 to 120 days end to end for Component B in AP, and 120 to 150 days for Component C IPS, because DISCOM feasibility and net metering add time. Feeder-level solarisation runs on NREDCAP’s tender calendar, not yours; MNRE’s FLS guidelines allow a RESCO developer up to 12 months from the Letter of Award to commission the plant.

Typical timeline by stage, Component B and Component C IPS
StageComponent B (NREDCAP)Component C IPS (DISCOM)
Application window to selection2-4 weeks after window closes3-6 weeks
Field verification1-2 weeks2-4 weeks (feasibility study)
Farmer share payment1 week (your side)1-2 weeks
Installation and commissioning4-8 weeks4-8 weeks
Net metering agreementNot applicable2-4 weeks, parallel
Total, clean file90-120 days in AP120-150 days

What stretches these numbers: document mismatches (adds 3-8 weeks), district quota exhaustion, and vendor backlogs. Because AP’s Component B machinery is still ramping up, the paper trail matters even more here: pay only against an NREDCAP or DISCOM demand note carrying your application number, and keep the receipt. That is what gets a stalled file escalated.

Why KUSUM applications get rejected in AP (and the fix)

Across our application work in South India and NREDCAP’s verification criteria, rejections cluster into a short, fixable list. We use a proprietary check with farmer clients called The Meebhoomi Triple-Match Rule: before you register, the applicant name, father’s name, and survey number must match exactly across three records, the Adangal or 1-B on Meebhoomi, Aadhaar, and the bank account. If any one differs, fix it at the MeeSeva centre or bank first, then apply. Files that pass the Triple-Match Rule clear verification in one visit; files that fail it bounce between offices for weeks.

  1. 1
    Name mismatch between the 1-B record and Aadhaar: the top rejection cause nationally and in AP. Correct Aadhaar or complete the mutation before applying; do not hope verification overlooks it.
  2. 2
    Existing agricultural meter on the survey number (Component B): with AP's near-universal free-power connections, this kills more B applications here than anywhere else. Apply under Component C instead.
  3. 3
    Outdated Adangal or pending mutation: a record older than 12 months or showing a deceased holder fails field verification. Complete the mutation at MeeSeva first.
  4. 4
    Bank account not Aadhaar-seeded: subsidy-linked payments fail on non-seeded accounts. Seed the account at your branch before registration.
  5. 5
    Applying outside an open window: AP's Component B windows open irregularly. An application filed when no quota exists is not rejected, it is simply never processed. Track NREDCAP notices.
  6. 6
    Fake portal or agent registration: agents collect "booking fees" when state schemes scale up. If your registration did not produce an NREDCAP or DISCOM application number, you were never in the system.

If your application was already rejected, you can re-apply in the next window after fixing the stated reason. There is no blacklisting for a first rejection.

Stuck with a rejected or stalled KUSUM file? Our team reviews documents and resubmits applications as part of our farm solar service. Talk to a solar engineer →

Is KUSUM worth it for an Andhra Pradesh farmer?

For a diesel-pump farmer, the arithmetic is decisive. A 5 HP diesel pump burns ₹80,000 to 1,10,000 of fuel per year across two crop seasons. At the standard 60% subsidy, your investment is ₹25,000 to 30,000 upfront, so payback lands inside the first year. For grid-connected farmers, the calculation is subtler because power is already free: the real gains are schedule reliability (daytime solar on your timetable, not the DISCOM’s roster), protection against any future metering of agricultural supply, and export income under Component C IPS.

✓ Pros
  • ✓ 60% subsidy; farmer share from ₹25,000-30,000 for a 5 HP pump
  • ✓ Payback inside the first year for diesel replacement
  • ✓ Feeder solarisation covers whole feeders with zero farmer cost
  • ✓ Daytime irrigation on your schedule, not the DISCOM roster
  • ✓ 25-year panel life; 20+ years of near-zero running cost
✗ Cons
  • ✗ Component B windows open irregularly in AP
  • ✗ Free existing power reduces urgency for grid-connected farmers
  • ✗ Document discipline required; Meebhoomi and Aadhaar mismatches stall files
  • ✗ Groundwater-notified mandals can face pump capacity caps
  • ✗ Vendor service quality varies after installation

Verdict. If you run a diesel pump in Andhra Pradesh, get your documents clean and register interest with NREDCAP now, because any new Component B window, which now depends on PM-KUSUM 2.0, will favour ready files. If you have a DISCOM connection, first check whether your feeder is on the state’s solarisation list; if it is, wait and pay nothing. If it is not and your supply is erratic, Component C IPS is worth the 120-150 day wait.

The exception worth naming: if your borewell yields poorly, a bigger solar pump does not create water. Fix the water source question first, then size the pump. And if you are a Vijayawada or Guntur homeowner rather than a farmer, KUSUM is not your route; our PM Suryaghar APSPDCL process guide covers the rooftop subsidy instead.

How Heaven Green Energy Helps

Heaven Green Energy is an MNRE-channel-partner solar EPC with 10,000+ installations across India, and our agriculture team handles the parts of the KUSUM Andhra Pradesh application that actually cause delays: document preparation against the Meebhoomi Triple-Match Rule, pump sizing from your borewell depth and crop water need, DISCOM liaison for Component C feasibility and net metering, and installation with Tier-1 BIS-certified equipment. We also work with AP farmers outside the subsidy route when no window is open, because a diesel pump replaced at full price still pays back in under three years for most borewells.

Frequently Asked Questions

What is the subsidy percentage for KUSUM in Andhra Pradesh?

Andhra Pradesh follows the national PM-KUSUM structure: 60% combined subsidy (30% central financial assistance plus 30% state share), with the farmer paying 10% upfront and an optional 30% bank loan, according to MNRE guidelines. On a 5 HP pump system costing ₹2.5 to 3 lakh, that means roughly ₹25,000 to 30,000 out of pocket. AP has not announced a higher state share as of mid-2026, unlike Karnataka’s temporary 80% round.

Who is the nodal agency for PM-KUSUM in Andhra Pradesh?

NREDCAP, the New and Renewable Energy Development Corporation of Andhra Pradesh, is the state nodal agency. It manages farmer registrations, tenders pump and plant work to empannelled vendors, and releases the state subsidy share. The three DISCOMs (APSPDCL, APEPDCL, APCPDCL) verify grid status, run Component C net metering, and execute feeder-level solarisation with NREDCAP.

How do I apply for KUSUM in Andhra Pradesh online?

Register through the NREDCAP portal when a Component B district window opens, or through your DISCOM for Component C individual pump solarisation. You need Aadhaar, a fresh Adangal and 1-B record from Meebhoomi, an Aadhaar-seeded bank account, and pump or borewell details. You receive an application number, then field verification, selection intimation, and a demand note for your farmer share.

What documents are required for the KUSUM AP application?

You need an Aadhaar card with a linked mobile, Adangal and 1-B (Record of Rights) issued within the last 12 months, an Aadhaar-seeded bank account, borewell or water source proof, existing pump details, and a caste certificate if applying under a priority category. Tenant farmers also need a registered tenancy agreement and landowner consent. Names must match exactly across Meebhoomi records, Aadhaar, and bank records.

How long does KUSUM approval and installation take in AP?

A clean Component B file takes 90 to 120 days in Andhra Pradesh, against 60 to 90 days nationally, because NREDCAP’s process is still ramping up. Component C individual pump solarisation takes 120 to 150 days due to DISCOM feasibility and net metering steps. Document mismatches add 3 to 8 weeks, and applying outside an open window pushes you to the next round entirely.

What is feeder-level solarisation and will it cover my pump?

Feeder-level solarisation (FLS) builds one solar plant to supply an entire 11 kV agricultural feeder, giving every connected pump reliable daytime solar power with no installation at the farm. Andhra Pradesh has a large feeder-level solarisation plan, reported in December 2025 as covering about 1,156 feeders. Ask your DISCOM sub-division office whether your feeder is on the list; if it is, you pay nothing and do not need to apply.

Can tenant farmers apply for KUSUM in Andhra Pradesh?

Yes. Tenant farmers are eligible for Component B with a registered tenancy agreement and the landowner’s written consent. The tenancy document must match the survey number on the Adangal, and the landowner must confirm no other KUSUM application exists for the same plot. Selection priority in most district rounds favours owner-cultivators, so tenants should register interest early.

Why was my KUSUM Andhra Pradesh application rejected?

The most common reasons are a name mismatch between the Meebhoomi record and Aadhaar, an outdated Adangal or pending mutation, an existing agricultural meter on the survey number (invalid for Component B), a non-Aadhaar-seeded bank account, or no open window in your district. You can re-apply in the next window after fixing the stated reason; a first rejection does not blacklist you.

Written by
Akash Hirpara

Co-Founder of Heaven Green Energy. Runs finance, procurement, and channel-partner programs — including CAPEX/OPEX/RESCO models and MNRE subsidy processing.

Ready to Go Solar?

Turn this knowledge
into real savings.

Get a free site assessment and custom savings proposal, no cost, no commitment. Our engineers will visit your location within 24 hours.

Call WhatsApp