Top 10 Solar Energy Producing States in India in 2026

The ten states leading India's solar build-out, ranked by MNRE installed capacity as on 31 August 2026, with landmark projects for each.

Top 10 Solar Energy Producing States in India in 2026

Top 10 Solar Energy Producing States in India in 2026

India’s solar revolution is not happening in one place, it is being driven by states from the Thar Desert to the southern coastline, each contributing to the nation’s ambitious target of 500 GW of non-fossil fuel capacity by 2030.

Here is a comprehensive look at the top ten solar energy producing states in India, ranked by total installed solar capacity (ground-mounted, rooftop including PM Surya Ghar, hybrid solar component and off-grid/KUSUM) as published by MNRE in its state-wise installed capacity data as on 31 August 2026. India’s total installed solar capacity on that date was about 168 GW.


1. Rajasthan, India’s Solar Leader

Installed Capacity: ~44.4 GW (44,370 MW, MNRE, 31 Aug 2026)

Rajasthan leads India with the highest solar capacity, driven by abundant sunlight, low land costs, and vast desert terrain ideally suited to large-scale solar farms.

Key highlights:

  • Home to Bhadla Solar Park (2,245 MW) in Jodhpur, one of the world’s largest solar farms
  • Accounts for roughly one-fourth of India’s total solar capacity (about 26%)
  • Near-ideal solar irradiance year-round in the Thar Desert zone

Rajasthan’s combination of scale, geography, and progressive solar policy has made it the benchmark against which all other Indian states are measured.


2. Gujarat, Innovation and Scale

Installed Capacity: ~34.9 GW (34,880 MW, MNRE, 31 Aug 2026)

Gujarat holds second place nationally and is home to some of India’s most ambitious solar projects.

Key highlights:

  • Building a hybrid renewable energy park at Khavda in Kutch with a planned capacity of 30 GW
  • India’s largest rooftop solar base: about 8.1 GW of rooftop capacity, including PM Surya Ghar
  • Strong policy framework and industrial demand drive rapid adoption

Gujarat is also a major hub for solar manufacturing, with companies like Adani Solar and Waaree operating large production facilities in the state. See our complete guide to rooftop solar in Gujarat for the residential and commercial picture.


3. Maharashtra, Sunny and Ambitious

Installed Capacity: ~20.4 GW (20,399 MW, MNRE, 31 Aug 2026)

Maharashtra has strong solar resource across most of its interior and the second-largest rooftop solar base in India (about 6 GW).

Key highlights:

  • Implementing Mukhyamantri Saur Krishi Vahini Yojana for agricultural feeder solarization
  • Developing significant wind and biomass capacity alongside solar
  • Strong rooftop solar adoption in industrial clusters around Pune and Nagpur

4. Tamil Nadu, Southern Solar Powerhouse

Installed Capacity: ~14.4 GW (14,354 MW, MNRE, 31 Aug 2026)

Tamil Nadu experiences high solar insolation, making it one of India’s most productive solar geographies.

Key highlights:

  • Ranks fourth nationally for solar while also holding one of India’s largest wind fleets (about 12.3 GW)
  • Coastal and inland regions both offer strong solar resource

5. Karnataka, The Early Leader

Installed Capacity: ~12.0 GW (12,014 MW, MNRE, 31 Aug 2026)

Karnataka was one of the earliest states to champion utility-scale solar and remains a top performer.

Key highlights:

  • Features Pavagada Solar Park (about 2 GW), one of Asia’s largest solar parks
  • Progressive state energy policy continues to attract private investment

6. Andhra Pradesh, Coastal Solar Hub

Installed Capacity: ~8.4 GW (8,363 MW, MNRE, 31 Aug 2026)

Andhra Pradesh combines strong solar resource with an extensive coastline and wind capacity that add wind-solar hybrid potential.

Key highlights:

  • Large utility-scale solar parks in the Rayalaseema region
  • Strong government push to establish AP as a renewable energy export state

7. Madhya Pradesh, Central India’s Solar Hub

Installed Capacity: ~6.6 GW (6,592 MW, MNRE, 31 Aug 2026)

Madhya Pradesh has built several large solar parks and is pushing solar-led development across its central plateau.

Key highlights:

  • Home to Rewa Ultra Mega Solar Park (750 MW), inaugurated in 2020
  • Central location provides grid connectivity advantages for power trading

8. Uttar Pradesh, The Giant Awakening

Installed Capacity: ~6.5 GW (6,537 MW, MNRE, 31 Aug 2026)

As India’s most populous state, UP has enormous electricity demand, and is now channelling that into solar ambition.

Key highlights:

  • UP Solar Energy Policy 2022 sets a multi-gigawatt solar target, led by utility-scale solar parks
  • India’s third-largest rooftop solar base (about 3 GW)
  • PM Surya Ghar scheme driving rapid rooftop solar adoption in urban and semi-urban areas

9. Telangana, Innovation at Scale

Installed Capacity: ~5.2 GW (5,165 MW, MNRE, 31 Aug 2026)

Telangana has strong, consistent solar resource across the Deccan plateau.

Key highlights:

  • Features NTPC’s 100 MW floating solar plant at Ramagundam, one of India’s largest
  • Innovative project models attracting private investment and technology experimentation

10. Haryana, Decentralized and Growing

Installed Capacity: ~2.9 GW (2,899 MW, MNRE, 31 Aug 2026)

Haryana is focused on distributed rooftop and decentralized solar rather than utility-scale mega projects: rooftop (about 1.4 GW) and off-grid/KUSUM pump solar (about 1.2 GW) make up most of its capacity.

Key highlights:

  • Emphasis on rooftop systems for households, industries, and commercial buildings
  • Strong integration with agricultural solar under KUSUM scheme

India’s Solar Installed Capacity at a Glance

Installed solar capacity of the top 10 statesInstalled solar capacity of the top 10 statesBar chart with 10 categories. Highest value: Rajasthan, 44,370 MW. Lowest value: Haryana, 2,899 MW. The full data is in the table that follows.Rajasthan44,370 MWGujarat34,880 MWMaharashtra20,399 MWTamil Nadu14,354 MWKarnataka12,014 MWAndhra Pradesh8,363 MWMadhya Pradesh6,592 MWUttar Pradesh6,537 MWTelangana5,165 MWHaryana2,899 MW
MNRE state-wise installed capacity as on 31 August 2026, as stated for each state in this article. Source: figures stated in this article.
Data for: Installed solar capacity of the top 10 states
CategoryValue (MW)
Rajasthan44,370 MW
Gujarat34,880 MW
Maharashtra20,399 MW
Tamil Nadu14,354 MW
Karnataka12,014 MW
Andhra Pradesh8,363 MW
Madhya Pradesh6,592 MW
Uttar Pradesh6,537 MW
Telangana5,165 MW
Haryana2,899 MW
RankStateInstalled Solar CapacityKey Project
1Rajasthan~44.4 GWBhadla Solar Park (2,245 MW)
2Gujarat~34.9 GWKhavda Hybrid Park (30 GW planned)
3Maharashtra~20.4 GWSaur Krishi Vahini Yojana
4Tamil Nadu~14.4 GWStrong solar + wind mix
5Karnataka~12.0 GWPavagada Solar Park (~2 GW)
6Andhra Pradesh~8.4 GWRayalaseema solar parks
7Madhya Pradesh~6.6 GWRewa Ultra Mega (750 MW)
8Uttar Pradesh~6.5 GWUP Solar Energy Policy 2022
9Telangana~5.2 GWRamagundam floating solar (100 MW)
10Haryana~2.9 GWRooftop and KUSUM-led growth

Source: MNRE, State-wise (location based) installed capacity of renewable power as on 31.08.2026. Totals include ground-mounted, rooftop (including PM Surya Ghar), hybrid solar component and off-grid/KUSUM Component B.


What Is Driving This Growth?

Across all ten states, several common themes emerge:

  • Natural advantages: strong solar irradiance, vast open land, or dense industrial demand
  • Government policy: state solar policies, DISCOM tenders, KUSUM, PM Surya Ghar
  • Large-scale infrastructure: mega solar parks reducing per-unit costs
  • Industrial integration: C&I adoption in textile, manufacturing, and processing clusters
  • Agricultural solar: pumping and feeder solarization reaching rural areas

India’s solar story is being written state by state, and the momentum is accelerating.


Install Solar Wherever You Are in India

Heaven Green Energy designs and installs rooftop and commercial solar systems across Gujarat and beyond. Whether you are in Surat, Ahmedabad, Vadodara, or another solar-rich region, we bring 200+ MW of project experience to your doorstep. Explore residential solar or commercial solar.

Contact our team: +91 63904 05060

Written by
Nirav Dhanani

Co-Founder & CEO of Heaven Green Energy. Leads strategy, growth, and customer outcomes across 10,000+ residential, commercial, and industrial solar installations in India.

Ready to Go Solar?

Turn this knowledge
into real savings.

Get a free site assessment and custom savings proposal, no cost, no commitment. Our engineers will visit your location within 24 hours.

Call WhatsApp