Circular Knitting Machines: Load, Shifts and Solar

The electrical load of a circular-knitting unit is a measured operating pattern, not a number you can read from the count of machines on the floor.

The electrical load of a circular-knitting unit is a measured operating pattern, not a number you can read from the count of machines on the floor. Machine type, diameter, feeds, speed, yarn, fabric, stop time and support systems all change the pattern. A rooftop solar proposal then has a second question: how much of that load occurs while the array produces power? A unit can use substantial electricity over a month yet have a low daytime base load on Sundays or during changeovers.

This article gives a way for a Gujarat knitting-unit owner to build a load record from machine and utility data, then compare it with a solar generation model. It is a measurement worksheet, not a published “kWh per machine” benchmark. Heaven Green Energy can use the completed record in a site-specific proposal. Get a load-based proposal for my plant through the article’s business enquiry form and industrial solar page, or send your bill and machine schedule on WhatsApp.

Sources checked: 23 November 2026. Terrot’s circular-knitting product range demonstrates variations in machine configuration. Its SL4 model sheet lists a 5.5 kW frequency-controlled drive for that specific model. That figure is not total site consumption, an average operating draw, or a universal rating for circular-knitting machines. The model and actual operating state must be known before using any nameplate value.

Start with the right measurement boundary

“Power consumption of a circular-knitting machine” can mean the motor’s nameplate, the machine’s measured electrical kW while running, its kWh over a shift, or the factory’s kWh divided by fabric output. These are different metrics. A motor nameplate is equipment information. kW at an instant is demand. kWh over a period is energy. kWh per kilogram or metre is a production-normalised measure whose value depends on what output is counted and what support loads are included.

Choose a boundary that matches the decision. To compare machine settings, meter one machine and count the accepted fabric it produced during the same period. To size solar, meter the whole connection where PV will be installed, including machines, compressed air, fans, lighting, pumps and other loads that run simultaneously. A machine-only figure will understate the plant’s daylight demand if shared utilities are substantial; a whole-factory bill cannot isolate the machine’s efficiency. Keep both views if the business wants both answers.

QuestionBoundary and unitRecord needed
What does this machine draw while making this fabric?Machine input kW at operating speedLogger reading, model and fabric setup
What energy did it use this shift?Machine kWh over actual running timeMeter and start/stop log
How energy-intensive was the output?kWh per kg or metre of accepted fabricMatched production quantity and rejects
What load can rooftop solar serve?Whole-connection daylight kW/kVA by intervalUtility interval data and shift schedule
What is the electricity cost of fabric?Applicable bill items per accepted outputBill components, output and accounting period

Do not divide one month’s grid-import kWh by a machine count and call the answer “machine consumption.” The result includes common loads and perhaps production outside those machines. After solar is installed, grid import is also no longer the same as total plant electrical use; on-site PV energy consumed by the plant must be counted for an efficiency metric.

Machine configuration explains why a fixed figure fails

Circular-knitting machines are not a single product. Single-jersey, double-jersey and interlock models differ in construction and fabric task; diameters, feeders, gauges and drive designs vary. Terrot’s product documentation makes that variation visible. A shop with a mix of machines should list the actual make, model, age and working configuration instead of assigning one kW figure to every frame.

The operating state matters as much as the model. The drive can run at different speeds, stop for yarn breaks, idle during fabric take-down, or remain powered during a changeover. A machine may have separate fans, feeders, lubrication or controls whose use differs from the main drive’s rated power. If fabric specification requires slower operation or more stops, energy per accepted kilogram can rise even though the machine’s rated power is unchanged. Conversely, a high-output shift can spread the background load over more saleable fabric.

The Terrot SL4 sheet names a frequency-controlled 5.5 kW drive. It is tempting to multiply 5.5 by the number of frames and hours. That calculation would assume every installed machine is that model, all drives operate at rated electrical input continuously, no machines stop, and no other load exists. Those assumptions are usually too strong for a solar proposal. Use nameplates to build an equipment inventory; use meters to learn demand.

Build a shift record that operations can trust

A useful one-week sample should include normal production days, a lighter day, and a planned or unplanned stop if those occur. At the main meter, collect interval kW and kVA data at the finest reliable resolution available. At the machine or feeder level, record the number of machines running, product type, speed band and major pauses. If a permanent submeter exists, export its readings; otherwise use a qualified temporary logger under the plant electrician’s supervision. Do not have an untrained writer open live panels to obtain a number.

The record needs a production denominator. Count accepted fabric output over the same dates as the energy data. Distinguish fabric still in process, rejected rolls and rework. If one machine makes several products, compare like products or explain the mix. A kWh/kg value can move because output changed, not because electrical efficiency changed. A reliable worksheet therefore has columns for quantity, product, operating hours and reason for idle time alongside kWh.

Time blockMachines runningOutput and productWhole-site kW/kVAShared utilitiesNote
Morning shiftEnter measured countEnter accepted outputMeter interval valuesCompressor/fan stateStart-up or normal run
Midday shiftEnter measured countEnter accepted outputMeter interval valuesCompressor/fan stateSolar-overlap period
Evening shiftEnter measured countEnter accepted outputMeter interval valuesCompressor/fan statePeak-demand check
Night shiftEnter measured countEnter accepted outputMeter interval valuesCompressor/fan stateNo direct PV output
Weekly closureEnter actual statusUsually limited outputMeter interval valuesEssential loadsExport or curtailment check

The table is intentionally blank of invented numbers. The owner can fill it from the actual meter and shift register. If the business has separate floors or tenants, repeat it by consumer connection. Solar connected to one meter cannot automatically offset a different tenant’s bill.

Calculate energy per unit of output carefully

For a defined product and period, specific electrical consumption = electrical kWh within the chosen boundary ÷ accepted output. State whether the output is kilograms, metres or pieces, and use the same unit each month. State whether electricity is machine-only or whole-factory. A benchmark with no boundary is almost useless.

For illustration only, a metered machine using 240 kWh while producing 160 kg of accepted fabric yields 240 ÷ 160 = 1.5 kWh/kg. The arithmetic is simple; its interpretation is not. If another 20 kg is rejected after the energy was consumed, dividing by 180 kg of gross production would understate energy per saleable kg. If the machine was idle half the shift while the hall fan remained on, a whole-site kWh/kg figure will differ. 1.5 kWh/kg here is a hypothetical teaching value, not a Gujarat average or a Heaven customer result.

For cost per kg, the tariff matters. A bill may separate energy, demand, time-of-use, power-factor and other charges. A simple energy-rate multiplication may be appropriate for a narrow marginal-energy question but not for total production costing. Use the tariff category and actual bill; the GERC tariff portal links current orders by licensee. Keep any rupee result in the private plant worksheet until the inputs are verified.

If the unit installs solar, measure total plant electricity as imported grid energy plus PV energy actually consumed on site, adjusted for other generation and exports at the defined boundary. If someone calculates “efficiency improved” because grid import fell while production held constant, they may simply be measuring an energy-source change. Solar can reduce purchased energy; it does not make the knitting machine mechanically more efficient.

Turn the shift record into a solar load match

Solar production rises and falls through daylight and weather. A unit with morning and afternoon shifts may overlap well; a primarily evening or night unit may not. A 24-hour unit can have a solid daytime base load, but its night production remains a grid or approved storage question. Compare interval demand at the connection with a conservative PV-output model using site weather, roof orientation, shade, equipment and losses. Do not compare monthly kWh totals alone.

For each interval, the initial screen can identify direct use as the smaller of available PV output and eligible plant load. Then show remaining import and possible export or curtailment separately, subject to the approved electrical and metering design. The GERC Grid Interactive Distributed Renewable Energy Sources Regulations, 2026 are the current Gujarat starting point for qualifying new projects. The exact export treatment depends on the selected metering arrangement and connection approval. An old 2016 net-metering rule should not be pasted into a 2026 proposal.

The weekly closure deserves its own row. If most machines stop on Sunday but the array continues generating, self-consumption can fall and export can rise. A monthly average conceals that. Product changeovers and annual shutdowns matter for the same reason. A solar model that uses a single “typical day” should state how many days of each type occur, then test how sensitive the result is to that assumption.

ScenarioMain questionWhat to show in the proposal
Full production daylightDoes load absorb proposed PV output?Interval direct-use estimate
Partial shift or changeoverDoes the array outpace the connection load?Potential export/curtailment
Weekly closureHow often is daytime load low?Calendar-weighted energy balance
Cloudy production dayWhat grid import returns?Import and demand sensitivity
Inverter unavailableCan plant operate normally on grid?Connection and process resilience

Solar sizing should follow the measured load and feasible roof. A plant with a large shed but small daytime demand may need a different system size or metering decision. A plant with stable daytime demand but a fragile roof may need structural work or another building. The industrial solar page covers these broader constraints.

Keep maximum demand separate from energy

A rooftop array can cut imported kWh without reducing the month’s highest kVA demand. A knitting unit’s peak may arise when many machines, a compressor and ventilation run together in the evening. If it occurs outside solar hours, the PV array may have little effect on demand charges. Even a midday peak can recur on a cloudy day. The billing-demand rule differs by tariff category, so use the actual licensee order and meter timestamps before claiming demand savings.

The APFC panel also belongs in the review. Solar can change imported real power while reactive demand remains, potentially changing the power factor seen by the meter. That is an electrical engineering question, not a reason to change settings blindly. The site electrician should supply before-and-after kW, kVA and kvar data, plus the single-line diagram, if a power-factor adjustment appears. Do not include a promised penalty saving in the solar proposal without that evidence.

Roof rights and service access can be the limiting factor

Many knitting units operate in buildings with several businesses, but this article makes no claim about how many are tenants in Surat. If the buyer does not own the roof, identify the bill holder, roof holder and proposed solar-system owner. Obtain written rights for installation, electrical routing, maintenance access and future removal. The GERC 2026 regulation addresses lawful rights to the site in the application framework; the actual landlord and utility arrangement still needs documentation.

An older textile shed also needs a structural assessment. Module loading, mounting and wind uplift cannot be approved from a photograph. Ask for drawings, roof condition, penetrations, vents, drainage and safe cleaning paths. Fibre and lint near ventilation outlets can increase cleaning work; the cleaning and access method must be planned before installation. A roof layout that covers extraction equipment or leaves no worker path is not a usable layout even if its square-metre arithmetic works.

Questions from knitting-unit owners

How many units does one circular-knitting machine consume per hour?

There is no single reliable value across models and operating states. An OEM sheet can state a drive rating for one model, but measured kWh over a real hour depends on running speed, stops and accessories. Log the specific machine during representative production and state the fabric task. Do not turn a motor nameplate into an hourly consumption promise.

Can solar cover a two-shift knitting unit?

It can supply part of the load during daylight when the array generates and the plant uses power at the same connection. The fraction depends on the hourly schedule, roof and system size. Evening consumption remains grid import unless an approved storage or other arrangement is designed. A proposal should show daylight and night separately.

Will a larger machine count justify a larger rooftop array?

Only if the machines actually run during solar hours, the connection can accept the design and the roof is suitable. Count running positions and read the meter. A large installed inventory with low utilisation can produce a smaller daytime load than a smaller, heavily used shop.

What should we share for a first proposal?

The knitting unit solar page organizes machine hours, demand and rooftop constraints for a proposal.

Share twelve recent bills where available, the consumer and tariff details, machine list with models, shift and weekly closure schedule, any interval or submeter data, roof plan and ownership documents. If the unit is rented, add the landlord’s written roof-rights position. Get a load-based proposal for my plant through the business enquiry form and industrial solar page, or send records on WhatsApp.

Written by
Heaven Green Energy

Founded in Surat in 2017. Head office at Utran, Surat. Heaven Green files PM Surya Ghar and DISCOM paperwork for its customers.

About Heaven Green Energy
Ready to Go Solar?

Plan solar around your factory

Share recent electricity bills, the load profile and roof details so the proposal can address your site.

Call WhatsApp