Quick answer. Non-RGP is a low-tension tariff category in the Gujarat state-owned distribution companies’ FY 2026–27 schedule for premises not covered by another category and with aggregate load up to and including 40 kW. The bill has fixed charges based on connected load, energy charges on all monthly units, and sometimes time-of-use additions or discounts. It is not the household RGP slab tariff. A shop or office considering rooftop solar must first read its own category, sanctioned load, meter type and actual business hours. GERC DGVCL FY 2026–27 tariff schedule, section 4.
This guide uses the state-owned DISCOM schedule effective 1 April 2026, accessed 23 November 2026. The schedule states its figures apply to DGVCL, MGVCL, PGVCL and UGVCL. A business served by Torrent Power or another licensee must use that licensee’s current order instead. Likewise, a bill marked LTMD, HTP or another category should not be forced into this Non-RGP explanation. For a load-based proposal, see commercial rooftop solar.
First read the category printed on your bill
Look for the tariff code or category near the consumer number. If it says Non-RGP, the schedule’s section 4 is the starting point. If it says RGP, that is a residential category; a business using electricity at a commercial premise should not assume the home slab chart applies. If it says LTMD, the billing method includes demand-related items under a different schedule. The state-owned DISCOM schedule says Non-RGP applies to services not covered in other categories with aggregate load up to 40 kW inclusive; consumers in this category may opt to be charged under LTMD. It says LTMD generally applies above 40 kW for premises not otherwise classified. GERC tariff schedule, sections 4 and 5.
That wording has two consequences. First, “shop” or “small factory” is not enough to decide the code; the sanctioned aggregate load and any special category matter. Second, an owner who adds air conditioning, refrigeration or machinery may need a sanctioned-load review, and that may change the relevant tariff. Do not change the category in a solar spreadsheet just because the premises seems small. Use the exact current bill, and ask the distribution company if the classification appears wrong.
An electricity bill contains more than one charge. Fixed charges depend on connected load; energy charges depend on units; time-of-use can add or discount charges for specified hours and eligible meter conditions; taxes, duties or fuel adjustments may appear separately. Solar can reduce imported units during sunny business hours, but it does not simply erase every line. The correct forecast starts with the entire bill and the current solar settlement rule, not a headline paise-per-unit figure alone.
Fixed charges: the part tied to load
For Non-RGP under the FY 2026–27 state-owned DISCOM schedule, fixed charges are ₹50 per kW per month for the first 10 kW of connected load and ₹85 per kW per month for the next 30 kW. That is a tiered connected-load calculation, not an energy-consumption slab. If a premises has 15 kW of connected load, an illustrative base fixed-charge calculation is 10 × ₹50 + 5 × ₹85 = ₹925 per month before other applicable items. The formula uses the published schedule but the 15 kW is hypothetical; a real bill may have adjustments and billing-period differences. GERC tariff schedule, section 4.1.
A rooftop PV plant usually does not change the sanctioned or connected load merely by producing electricity. Therefore, do not assume those fixed charges vanish after installation. The business can review connected load independently with the utility if it is no longer appropriate, but that is a separate application and not a solar saving to promise in a standard proposal. GERC’s 2026 rooftop settlement regulation also says fixed, demand and other applicable charges remain under net metering. GERC Notification 11/2026, Regulation 9.1.9.
If an invoice shows a fixed-charge value different from a quick hand calculation, check the billing period, connection details, tax and other adjustments rather than assuming an error. The tariff schedule states charges on a monthly basis and allows the licensee to adjust for the billing period. A shop that has changed its sanctioned load mid-period may need a dated utility explanation. Keep the latest sanctioned-load letter with the bill when requesting a solar quote.
Energy charges: one rate for all monthly units in this category
The section 4.2 Non-RGP schedule lists post-paid energy charges of 435 paise per unit when contracted load is up to and including 10 kW, and 465 paise per unit when contracted load exceeds 10 kW. The respective pre-paid figures are 422 and 451 paise per unit. Each rate is for the entire consumption during the month within that load condition; it is not a residential-style staircase where early units are charged at one rate and later units at another. GERC tariff schedule, section 4.2.
A hypothetical post-paid 15 kW shop importing 1,000 units would have a section 4.2 base energy component of 1,000 × ₹4.65 = ₹4,650 before time-of-use, fuel adjustment, electricity duty, taxes and any other applicable items. This is a worked tariff method, not a complete bill or a saving forecast. If solar reduces its grid imports by 300 kWh in a billing month, the relationship with the final bill also depends on the time of those imports, whether energy was exported, and the approved settlement mechanism. The plant’s direct use is more valuable to model than a single annual generation figure.
The tariff order itself says its base rates exclude electricity duty, taxes and other government or competent-authority charges. Do not treat ₹4.65 as the all-in unit cost, and do not multiply every solar kWh by that figure to claim a return. A proposal should reconcile each line of an actual bill and explicitly show which charge is expected to change. If a site has a different tariff category or utility, the example is not transferable.
| Bill or schedule item | FY 2026–27 Non-RGP state-owned DISCOM rule | Solar relevance |
|---|---|---|
| Category ceiling | Up to and including 40 kW aggregate load, where no other category applies | Check actual bill and sanctioned load first |
| Fixed charge | ₹50/kW first 10 kW; ₹85/kW next 30 kW each month | Generally remains unless utility changes load separately |
| Post-paid energy | 435 paise/unit up to 10 kW; 465 paise/unit above 10 kW | Direct daytime solar can lower imported units |
| Pre-paid energy | 422 or 451 paise/unit by same load threshold | Do not apply post-paid rate to a pre-paid bill |
| Peak time addition | 45 paise/unit during specified peaks when contract demand exceeds 10 kW | Solar coincidence depends on the hour |
| Daytime discount | 60 paise/unit 11:00–17:00 for the specified meter and demand conditions | Daytime tariff can change marginal value of solar imports avoided |
Source: GERC DGVCL FY 2026–27 tariff schedule, section 4, effective 1 April 2026. The solar column is a modelling implication, not a project result.
Time-of-use can make two units worth different amounts
For Non-RGP consumers with contract demand above 10 kW, section 4.3 adds 45 paise per unit during two peak periods: 07:00–11:00 and 18:00–22:00. Section 4.4 provides a 60 paise per unit concession during 11:00–17:00 for consumers up to and including 10 kW with a smart meter and those above 10 kW with a meter having time-of-day recording facility or a smart meter. The exact bill treatment depends on meter eligibility and recorded consumption. GERC tariff schedule, sections 4.3–4.4.
A shop open from 10:00 to 20:00 may use much of its power during sunlight but also have evening demand after PV output falls. A cold store or restaurant can have a different profile; the tariff code alone does not tell you the load shape. If the bill has time-of-use readings, request them. If not, a short interval survey can help. The economic value of a solar unit consumed directly around noon may differ from a peak-hour unit avoided early in the morning or evening. Do not assume solar covers the whole peak period just because the tariff table mentions a peak charge.
An air-conditioned office may see high demand in the afternoon, which can match solar production better than a shop that opens mainly after sunset. But even a daytime office has weekends, holidays and seasonal changes. Model those separately. A roof layout and an annual PV output estimate answer how much electricity the system could produce; interval load data answers how much the business can use directly. Both are needed to make a buyer decision.
How rooftop solar appears on a Non-RGP bill
Gujarat’s GERC Notification 11/2026, dated 30 October 2026, sets the current distributed renewable energy settlement framework for newly commissioned systems under its provisions. Net metering, net billing and other mechanisms use different calculations. Under net metering, the licensee records solar generation, grid exports, grid imports, direct consumption and net billed energy or surplus. For a non-residential prosumer, exported units adjusted against imports are limited to 30% of total energy imported in that billing period, subject to applicable banking charges. Excess export beyond the limit lapses. GERC Regulations 9.1.3–9.1.5.
Direct solar use behind the meter and exported solar are different. A café using 20 kWh while PV produces 20 kWh may avoid that amount of grid import during the interval, depending on the electrical boundary. If the café closes early and PV produces while load is near zero, surplus may export under the approved mechanism. The 30% rule concerns the adjustment of non-residential exports against imports under net metering, not a blanket limit on how much solar may be generated or directly used. Keep those categories separate in any savings calculation.
Under net billing, imported energy is valued at the applicable retail tariff and exported energy at the relevant generic renewable tariff, with fixed and other charges in the bill equation. It is not a one-for-one kWh adjustment. The correct option and permitted plant size require a utility application and technical feasibility. Do not let a contractor use an older Gujarat rooftop slide deck without checking the 2026 regulation and the actual distribution licensee’s approved procedure. GERC Regulations 8–9.
Five checks before you accept a solar quote
First, match the consumer number, licensee and tariff category on the quotation to the latest bill. A generic “commercial rate” can hide a wrong Non-RGP versus LTMD assumption. Second, ask for the connected and contracted load used in the fixed-charge calculation. Third, ask for an hourly or interval comparison of business load and solar output, including a closed day. Fourth, ask which GERC metering mechanism the proposal assumes and how export is treated. Fifth, ask for a bill bridge that shows fixed charges, imported-energy charges, time-of-use, taxes and other items separately. A single “monthly savings” number without that bridge is difficult to verify.
The roof must also be checked. A small business may rent its premises, have limited roof rights, or share a roof with other occupants. Permission to install, meter ownership and structural capacity are separate questions. A large visible roof does not automatically belong to the account paying the electricity bill. Ask the EPC to identify the electrical and property boundary before quoting an exact plant size. If the site is in a market building or commercial complex, multiple meters can complicate the design.
Financing and tax treatment are also separate from tariff arithmetic. The bill calculation can be described without promising a payback period, a financing rate or a tax deduction for every buyer. A business owner should ask their accountant about eligibility and timing if depreciation or GST input credit affects a purchase decision. Those items require their own current rule and business facts; they should not be silently added to a solar proposal’s “savings” line.
Questions business owners ask
Does Non-RGP mean residential? No. The FY 2026–27 state-owned DISCOM schedule gives it a separate low-tension category for qualifying premises up to 40 kW aggregate load. The RGP home tariff has different rules. Read the code on your bill.
Is every shop automatically Non-RGP? No. Category, load and any special use govern classification. A shop with a different sanctioned load or supply arrangement may be on LTMD or another category. The utility bill and tariff order settle the starting point.
Will solar eliminate fixed charges? Normally no. The published Non-RGP fixed charge is tied to connected load, and GERC’s net-metering rule keeps applicable fixed and other charges payable. A separate load revision requires utility action.
Can I use the post-paid rate in a pre-paid model? No. The schedule lists distinct rates. Use the bill’s payment mode and meter status, then recheck the current tariff when signing.
What if my business is in Surat but my bill is not DGVCL? Use the actual named distribution licensee’s order. Geography alone does not prove a consumer is on the state-owned DISCOM schedule.
Get a load-based proposal for my business. Share the latest bills, opening hours, roof photos and meter details through the enquiry form on commercial solar, or call +91 63904 05060. Heaven Green Energy is a Surat solar company founded in 2017. The proposal should use your tariff code and daily load rather than a household slab or a generic commercial-rate estimate.