PM Suryaghar Adani Electricity Mumbai Process 2026

Complete PM Suryaghar Adani Electricity Mumbai process 2026. Step-by-step application, documents, ₹78,000 subsidy, and net metering for AEML consumers in

Heaven Green Energy
Solar Energy Expert
PM Suryaghar Adani Electricity Mumbai Process 2026

Adani Electricity Mumbai Limited (AEML) is the DISCOM serving Mumbai’s western and northern suburbs — covering Andheri, Bandra, Versova, Borivali, Malad, Goregaon, Kandivali, Mira Road, and Bhayander, among others. In 2026, AEML residential consumers can apply for PM Suryaghar subsidy of ₹78,000 on 3 kW+ rooftop solar systems. AEML’s feasibility process takes 10–18 days — faster than MSEDCL but slower than Gujarat’s UGVCL. With Mumbai’s tiered tariffs and PM Suryaghar’s subsidy, payback on a 3 kW system is typically 4.5–6 years.

Key takeaway. PM Suryaghar through Adani Electricity Mumbai (AEML) provides ₹78,000 subsidy on 3 kW+ residential rooftop solar. AEML feasibility approval takes 10–18 days and inspection 8–15 days. After subsidy, a 3 kW system costs ₹1,30,000–₹1,65,000. Heaven Green Energy is MNRE-empanelled for AEML and handles complete PM Suryaghar applications for Mumbai western suburb homeowners.

AEML (formerly Reliance Energy) has progressively invested in customer service infrastructure, and its solar application process benefits from a dedicated consumer portal. However, the Mumbai apartment living context — housing societies, shared terraces, and multi-storey buildings — creates unique challenges that don’t exist in Gujarat or Rajasthan. This guide covers every step of the AEML process and the apartment-specific considerations.

AEML Coverage: Western and Northern Mumbai Suburbs

AEML covers the following Mumbai areas (verify from your electricity bill header):

AreaApproximate Coverage
Andheri (East and West)Full coverage
Bandra (East and West)Full coverage
Versova, Juhu, JVPDAEML zone
Borivali (East and West)Full coverage
Malad (East and West)Full coverage
Goregaon (East and West)Full coverage
Kandivali (East and West)Full coverage
Mira Road and BhayanderAEML zone
DahisarAEML zone
JogeshwariAEML zone

Not AEML: Dharavi, Ghatkopar, Mulund, Kurla, and Eastern suburbs are typically Tata Power. Thane, Navi Mumbai, and outer suburbs are MSEDCL. Confirm your DISCOM from your bill header.

10–18 days
AEML feasibility time
For residential applications — AEML, 2026
8–15 days
AEML inspection time
Post-installation — AEML, 2026
₹78,000
Max PM Suryaghar subsidy
For 3 kW+ residential systems — MNRE, 2026
4.5–6 yrs
Payback in AEML zone
Post-subsidy — Heaven Green Energy data, 2026

PM Suryaghar Subsidy for AEML Consumers

The PM Suryaghar subsidy rates are set nationally and apply equally to AEML consumers as to any other Indian DISCOM:

System SizeSubsidyAfter-Subsidy Cost (Mumbai)
1 kW₹30,000₹72,000–₹92,000
2 kW₹60,000₹1,05,000–₹1,38,000
3 kW₹78,000₹1,30,000–₹1,65,000
5 kW₹78,000₹1,95,000–₹2,43,000
10 kW₹78,000₹3,50,000–₹4,40,000

Mumbai system costs are higher than the national average due to higher labour rates, building access logistics, and in many cases the need for specialised apartment coordination. Marine-grade mounting materials (stainless steel fasteners, marine aluminium frames) add ₹8,000–₹12,000 but are recommended for Mumbai’s coastal environment.

For the full Mumbai solar context, see our PM Suryaghar Mumbai guide.

The AEML PM Suryaghar Application Process

Step 1: Verify Your AEML Consumer Number

Your AEML consumer number is on your monthly electricity bill. AEML consumer numbers are typically 8–10 digits. The bill header will clearly show “Adani Electricity Mumbai Limited” or “AEML.” Your consumer number is labelled “Consumer A/C No.” or “Account Number.”

Step 2: Housing Society Assessment (Do This First)

Before starting the PM Suryaghar portal application, assess your housing situation:

  • Independent bungalow or row house with private roof: Proceed directly to portal application.
  • Low-rise society (4 floors and below) with terrace access: Get written NOC from your CHS (Cooperative Housing Society) General Body first.
  • High-rise apartment (5+ floors): Society installation or individual assessment required — consult an experienced installer first.

Society NOC should state: “The society permits [name] of Flat No. [X] to install a solar system of [Y] kW on the [roof/terrace area], subject to the condition that [any society-specific requirements].”

Step 3: Register on PM Suryaghar Portal

  1. Visit pmsuryaghar.gov.in and register with your mobile number.
  2. Select State: Maharashtra; DISCOM: Adani Electricity (AEML / Adani Electricity Mumbai Ltd.).
  3. Enter your AEML consumer number.
  4. Confirm your name and address auto-populate from AEML’s database.
  5. Choose your MNRE-empanelled vendor.
  6. Enter proposed system capacity — for AEML zone, typically 2–5 kW for residential.

Step 4: Document Upload

DocumentRequired ForNote
AEML electricity bill (latest)All applicantsMust clearly show AEML consumer number
Aadhaar card (account holder)All applicantsMust match the name on AEML bill
Property proofAll applicantsSale deed / registered rent agreement / society allotment letter
Housing Society NOCApartment dwellersWritten NOC from CHS authorised signatories
Bank passbook front pageAll applicantsAccount holder name must match AEML account holder
Passport photoAll applicantsClear, recent

⚠️ Watch out

AEML's net metering regulations are governed by MERC (Maharashtra Electricity Regulatory Commission), not a separate Adani framework. However, AEML has its own consumer portal at adanielectricity.com that you can use to track application status separately from the PM Suryaghar national portal. Both portals should be checked during the process.

Step 5: AEML Feasibility Approval (10–18 Days)

AEML’s technical team reviews:

  • Transformer capacity at your feeder
  • Sanctioned load vs. proposed solar size
  • Physical suitability (based on submitted photos or field visit for larger systems)

For most Borivali, Andheri, and Malad consumers with 2–5 kW systems, feasibility is desk-reviewed without a physical visit. For Mira Road and Bhayander properties, a field visit may be required if the technical team needs physical confirmation of transformer capacity.

Step 6: Installation and Inspection (8–15 Days Post-Installation)

After feasibility approval, your MNRE-empanelled vendor installs the system. AEML inspectors check:

  1. Panel BIS certification numbers (each panel batch label)
  2. Inverter BIS certificate and model number
  3. Anti-islanding test result
  4. Earthing and SPD presence
  5. Meter box accessibility

AEML inspection is typically completed in 8–15 days — faster than MSEDCL. After successful inspection, AEML installs the bidirectional net meter within 5–8 days.

Step 7: Subsidy DBT

PM Suryaghar subsidy (₹78,000 for 3 kW+) is transferred to your bank account within 30 days of commissioning. Track on the national portal at pmsuryaghar.gov.in.

The AEML Mumbai Apartment Solar Navigator

The AEML Mumbai Apartment Solar Navigator is Heaven Green Energy’s proprietary framework for identifying the best solar installation path for AEML-zone Mumbai apartment dwellers — a unique challenge where the building type determines your entire approach.

Path A — Individual system (dedicated terrace): Ideal for: Independent bungalows, row houses, ground-floor flats with exclusive terrace rights. Process: Standard PM Suryaghar application. System connects to individual meter. Timeline: 65–85 days to subsidy.

Path B — Individual system (shared terrace with Society NOC): Ideal for: Low-rise societies (2–4 floors) where an individual flat owner has a dedicated terrace portion. Process: Get Society NOC first (2–6 weeks), then standard PM Suryaghar. Timeline: 80–100 days to subsidy (including Society approval).

Path C — Society common system: Ideal for: High-rise societies wanting to reduce common area electricity bills (lifts, corridors, pumps). Process: Society (or its authorised managing committee) applies as the consumer. Different structure from individual PM Suryaghar. Timeline: 90–120 days (longer due to Society decision-making process).

Path D — Not feasible: Applies to: High-rise apartments above 10 floors with fully shaded terraces, SRA buildings with construction restrictions, or heritage properties. Recommendation: Consult with an experienced installer before making any commitment.

Comparing AEML with Other Mumbai DISCOMs for PM Suryaghar

DISCOMCoverageFeasibilityInspectionNet Cost (3 kW)
AEMLWestern/Northern suburbs10–18 days8–15 days₹1,30,000–₹1,65,000
MSEDCLOuter suburbs (Thane, Navi Mumbai)12–20 days10–18 days₹1,20,000–₹1,55,000
Tata PowerEastern suburbs12–20 days10–18 days₹1,30,000–₹1,65,000

AEML’s inspection process is somewhat faster than MSEDCL. System costs are higher in the core western suburbs due to access complexity. The economics are otherwise comparable across the three.

Is PM Suryaghar Worth It in AEML Zone?

Pros
  • ₹78,000 subsidy available across all AEML residential consumers
  • AEML inspection faster than MSEDCL — 8–15 days
  • High AEML tariffs make solar savings very meaningful for heavy users
  • AEML consumer portal provides transparent tracking
Cons
  • Most AEML consumers live in apartments — Society approval is time-consuming
  • Mumbai's monsoon and dense buildings reduce effective solar yield
  • Installation costs higher than non-metro cities
  • Salt air requires marine-grade materials — adds ₹8,000–₹12,000

Check your AEML solar feasibility. Our Mumbai team does free site and shadow assessments for western suburb homeowners. Get your free quote →

How Heaven Green Energy Handles AEML Applications

Heaven Green Energy is MNRE-empanelled for AEML and has completed solar installations across Mumbai’s western suburbs. Our team coordinates Society NOC processes, shadow analyses, and AEML portal applications in a single managed workflow.

Frequently Asked Questions

What is the AEML consumer number format for PM Suryaghar?

AEML consumer numbers are typically 8–10 digits. The number is labelled “Consumer A/C No.” or “Account Number” on your monthly Adani Electricity bill. The bill header will clearly show “Adani Electricity Mumbai Limited” or “AEML.” Use this exact number on the PM Suryaghar national portal.

How do I check if I’m in AEML zone or MSEDCL zone in Mumbai suburbs?

Check your electricity bill header. If it says “Adani Electricity Mumbai Limited” or “AEML,” you’re in the Adani zone. If it says “MSEDCL” or “Maharashtra State Electricity Distribution,” you’re MSEDCL. For Mira Road and Bhayander, check carefully — some pockets are AEML and others are MSEDCL depending on the specific area.

Can I get PM Suryaghar subsidy for a solar system on my Borivali apartment terrace?

Yes, if your housing society approves the installation. For a Borivali apartment, you need: (1) written CHS NOC, (2) clear wiring path from terrace to your flat’s meter board, (3) shadow-free terrace space of at least 20 m² for a 3 kW system. With these in place, the standard PM Suryaghar process applies through AEML.

Does AEML have a separate consumer portal for solar applications?

Yes. AEML has its own consumer portal at adanielectricity.com where you can track your solar connection application status. However, the PM Suryaghar subsidy application must be filed on the national portal at pmsuryaghar.gov.in. Both portals should be monitored during the application process.

What is AEML’s net metering tariff for surplus solar exports?

AEML’s net metering framework is governed by MERC (Maharashtra Electricity Regulatory Commission). Monthly surplus exports are credited at import tariff rates. Annual remaining credits are settled at MERC’s feed-in tariff, which is lower than the import rate. Check merc.gov.in for current rates. The key principle: maximise self-consumption and minimise export for best financial returns.

How do I handle the shading analysis for a Mumbai high-rise building?

Request a shading analysis from your vendor using software tools (like PVsyst or Solargis). The analysis should model: shadows from adjacent buildings, from the elevator shaft/machine room on the terrace, from water tanks, and seasonal sun angle variations. In Mumbai’s dense urban landscape, shading can reduce effective generation by 20–50% — making the analysis critical before system sizing.

Can I install solar on rented property in AEML zone?

You can apply for PM Suryaghar on a rented property if: (1) the AEML electricity connection is in your name (not the landlord’s), or (2) the landlord is the electricity account holder and consents to the application and DBT in their name. In practice, most rented residential connections in Mumbai are in the tenant’s name, making individual applications possible with a registered rent agreement.

Heaven Green Energy

Heaven Green Energy is India's trusted solar EPC company with 10,000+ installations across residential, commercial, and industrial sectors. Our experts help you navigate subsidies, financing, and technology to maximise your solar returns.

Talk to our team
Ready to Go Solar?

Turn this knowledge
into real savings.

Get a free site assessment and custom savings proposal — no cost, no commitment. Our engineers will visit your location within 24 hours.

Call WhatsApp