Solar panel installation in Mumbai.

Heaven Green Energy is an authorised channel partner of Adani and a PM Surya Ghar empanelled vendor. Mumbai has three distribution licensees, so the first thing we do is read your bill and confirm whether Adani Electricity, Tata Power or BEST supplies you. Then we size, install, file net metering and claim your subsidy.

Authorised Adani Solar distributor₹78,000 subsidy handled end-to-endAdani, Tata Power or BEST net metering filed for youHousing society paperwork supported

Get your free Mumbai solar quote

Send us your bill and pin code. An engineer calls back with your licensee, system size, cost after subsidy and payback, usually within 2 working hours.

Free site survey. No advance payment.

Prefer to talk? +91 63904 05060

Distribution licensee
Adani Electricity, Tata Power or BEST
Three licensees in one city. Your bill names yours
Regulator
MERC
One net-metering framework across all three
Solar resource
About 4.8 peak sun hours
Coastal, softened by a long monsoon
Generation
3.8 to 4.2 units per kW daily
Annual average across wet and dry months
Central subsidy
Up to ₹78,000
Residential, 3 kW and above
Typical payback
3.5 to 5 years
Residential on-grid

The short answer

Rooftop solar in Mumbai costs about ₹2.00 lakh to ₹2.50 lakh for 3 kW before subsidy, falling to ₹1.22 lakh to ₹1.72 lakh after the ₹78,000 PM Surya Ghar subsidy. Each kW generates 3.8 to 4.2 units a day on this coast. Net metering is filed with Adani Electricity, Tata Power or BEST, whichever bills you. Payback runs three and a half to five years.

Last reviewed 18 September 2026 · Heaven Green Energy engineering team

Price, size and savings

Find your bill. Read across.

Most Mumbai solar pages quote a national average and hide the rest behind a form. This table answers the question outright. Find your monthly bill in the left column, then read across for system size, monthly generation, shadow-free roof area and what it costs after subsidy. The bands are wide because a fourteenth-floor terrace genuinely costs more to build on than a bungalow roof in Vile Parle.

Indicative Mumbai market ranges, 2026
Your monthly bill System Generates Roof needed Cost after subsidy Payback
Up to ₹1,800 2 kW 1–2 BHK, one AC used sparingly 225–250units/month ~200 sq ft ₹80,000 – ₹1.15 lakh ₹1.40 lakh–₹1.75 lakh before ₹60,000 subsidy 3.5–4.5 years
₹2,000–₹3,500 3 kW Best value The largest system that still earns the full ₹78,000 340–375units/month ~300 sq ft ₹1.22 lakh – ₹1.72 lakh ₹2.00 lakh–₹2.50 lakh before ₹78,000 subsidy 3.5–4.5 years
₹3,500–₹6,000 5 kW 3 BHK running two ACs through summer 565–625units/month ~500 sq ft ₹2.32 lakh – ₹3.02 lakh ₹3.10 lakh–₹3.80 lakh before ₹78,000 subsidy 4–5 years
₹6,000–₹13,000 10 kW Bungalows, clinics, shops, coaching institutes 1,130–1,250units/month 700–1,000 sq ft ₹4.87 lakh – ₹6.12 lakh ₹5.65 lakh–₹6.90 lakh before ₹78,000 subsidy 4–5 years
Above ₹13,000 25 kW+ Commercial connections, on accelerated depreciation 2,825–3,125units/month Site-specific ₹11.50 lakh – ₹14.50 lakh ₹11.50 lakh–₹14.50 lakh, no subsidy 3–4.5 years

Indicative Mumbai market ranges for 2026, covering Tier-1 modules, a branded inverter, galvanised structure, protection and installation. These are not a Heaven Green quotation. Subsidy amounts are the central PM Surya Ghar figures published on pmsuryaghar.gov.in. Generation assumes a shadow-free, roughly south-facing roof.

The 3 kW cliff decides most Mumbai orders. PM Surya Ghar pays ₹30,000 per kW for the first two kilowatts and ₹18,000 for the third, then nothing. So the subsidy wipes out roughly a third of a 3 kW system and closer to a tenth of a 10 kW one. If your bill sits on the boundary, 3 kW returns more rupees per rupee spent. Above that you are buying units, not subsidy. Size on your consumption first, then check what the subsidy does to the net figure.

A cheap Mumbai quote is cheap in the structure and the access plan, not the panels. Galvanising thickness, cable gauge, earthing and surge protection separate the bottom of each band from the top. On a Mumbai terrace the cost that vendors quietly delete is the one you cannot see from the ground. That means material hoisting to the eleventh floor, wind-load design, and a corrosion specification that survives salt air. Ask for a written Bill of Materials with make, model and quantity.

City-specific warning: check the sanctioned load before you agree a size. Older Mumbai flats often carry a sanctioned load of one or two kilowatts, and no licensee will approve a system larger than that load. If a vendor sells you 5 kW without mentioning a load enhancement application, your system will fail feasibility after you have paid. Load enhancement is a routine application, but it is an application, and it happens before installation rather than after.

Why there is no rupee saving in that table

You will notice there is no rupee saving in that table. Mumbai tariffs are slab-based and differ between Adani Electricity, Tata Power and BEST. So the rupee value of one solar unit is not the same for two neighbours in the same lane. Guessing it here would be dishonest. Bring your last bill to the free survey and we work the number out in front of you, slab by slab. We use the units you actually consumed over the past twelve months, not a round figure picked to make the payback look short. Prefer to work it out yourself first? Put your bill into our solar savings calculator. No phone number required.

This is what we actually build.

Heaven Green Energy installations across India. Not stock photography, and not renders. Your Mumbai system is built to the same specification.

Rooftop solar array photographed against a city skyline at sunset
Residential rooftop
Long row of solar modules on a commercial building rooftop photographed at sunrise
Commercial rooftop
Elevated solar canopy structure mounted above a terrace, leaving the floor below usable
Elevated structure
Wall of dozens of string inverters mounted in neat rows at a large solar installation
Electricals

PM Surya Ghar Muft Bijli Yojana

₹78,000

Maximum central subsidy for a residential rooftop system.

  • ₹30,000 per kW for the first 2 kW
  • ₹18,000 for the 3rd kW
  • Nothing paid above 3 kW
  • Credited directly to your bank account
  • We file the entire claim for you
How the subsidy works

Five steps, and we run four of them.

PM Surya Ghar is a central scheme, so nobody in Mumbai gets a bigger subsidy than anybody else. Anyone advertising a special Mumbai rate is selling you something that does not exist. What changes locally is which licensee processes your file, and Mumbai has three of them. Pick the wrong one on the portal and the application simply sits there.

1

Register on the National Portal

You register at pmsuryaghar.gov.in with your consumer number, mobile, Aadhaar and address, and you select your discom from the list. Choosing the wrong licensee here is the single commonest reason a Mumbai application stalls, so we sit with you and match it to the bill.

2

Apply for feasibility, then pick your vendor

Your licensee checks the application against your sanctioned load. You then select an empanelled vendor. Heaven Green Energy is empanelled, so we map straight to your application without a second registration.

3

Clear the society, then install

Flat owners need the housing society's written consent for terrace use before work starts. We supply Adani modules with traceable serial numbers, and hand you a Bill of Materials and warranty schedule on completion.

4

Inspection and net meter

Adani Electricity, Tata Power or BEST inspects the installation and fits the bidirectional meter, which generates the commissioning certificate on the portal. Our engineer attends the inspection.

5

Claim and credit

We file the claim once the certificate issues, and government credits the subsidy directly to your bank account. It never passes through us. Treat any vendor who offers to collect the subsidy on your behalf as a warning sign.

If you are a business, this section does not apply

PM Surya Ghar covers residential consumers only. A Mumbai shop, office, clinic or commercial tower cannot claim it. Businesses claim accelerated depreciation on the asset instead, which for a taxpaying company often returns more than the residential subsidy would have paid.

AEML / Tata Power-D / BEST

Net metering: who you actually file with.

This is where nearly every competing Mumbai page fails. Get the licensee wrong and your application goes to a utility that does not supply you.

Mumbai is the only Indian city with three distribution licensees inside one municipal boundary. Brihanmumbai Electric Supply & Transport (BEST), run by the municipal corporation, supplies most of the island city from Colaba up to Mahim and Sion. Adani Electricity Mumbai Limited (AEML), formerly Reliance Infrastructure's distribution business, holds the licence across most of the suburbs. That covers, broadly, Bandra to Dahisar on the western side and the eastern suburbs up to Vikhroli, plus Mira-Bhayander beyond the city limit. The Tata Power Company Limited is a parallel licensee. In the suburbs many consumers switched over from the incumbent network, and Tata Power now bills them at the same address. Mulund and Bhandup, at the north-eastern edge, are supplied by MSEDCL rather than by any of the three.

That is why the only reliable answer to "who is my discom in Mumbai" is printed on your own bill. Two flats in one building can sit with different licensees because one household exercised changeover and the other did not. We check the bill before we file anything.

The commercial terms are common to all of them. They come from the Maharashtra Electricity Regulatory Commission (MERC), not from the utility and not from us. Under the MERC framework your system is capped at your sanctioned load, every consumer category may apply, and surplus units you export are credited against units you draw later.

1

Application

Consumer details, sanctioned load, system rating, single-line diagram and equipment datasheets go to Adani Electricity, Tata Power or BEST, whichever your bill names.

Filed by us
2

Technical feasibility

The utility tests whether your sanctioned load and the local distribution transformer carry the proposed capacity. Oversized systems are rejected here, which is why we size against sanctioned load on the first visit.

Your licensee
3

Installation and inspection

We install. The licensee inspects earthing, protection, isolation and metering compliance before anything is energised.

Us, then your licensee
4

Bidirectional meter

Your existing meter is replaced with a bidirectional net meter and the commissioning certificate issues. Export credits begin from this date, not from the day panels went up.

Your licensee
Solar panels installed flush on a corrugated metal factory roof with industrial buildings behind
Not a home?

Solar for Mumbai's businesses.

Running a shop, office, tower or factory rather than a home? The economics work differently and this page is written for householders.

Commercial consumers in Nariman Point, Bandra Kurla Complex, Lower Parel, the Andheri MIDC and SEEPZ belt, Saki Naka, Powai and Vikhroli get no PM Surya Ghar subsidy. They claim accelerated depreciation on the asset instead, which for a taxpaying business often beats the residential subsidy outright. They can also avoid capital outlay altogether through OPEX or RESCO models.

Mumbai commercial tariffs are among the highest in India, so a roof that generates through the working day pays back faster here than the same roof inland. Office towers and retail have the useful property of consuming most of their power between ten and six, exactly when the array produces. Self-consumption is therefore high, and less depends on export credits. We deliver turnkey commercial and industrial EPC across the city, with structural design to coastal wind-load standards, licensee registration and long-term operations and maintenance.

Registered housing societies sit in between. The common-area connection behind lifts, pumps and lobby lighting is a residential load. So a society system is usually the highest-return solar project in the building, and it lowers the maintenance charge every flat pays.

Why us

Why Mumbai customers choose Heaven Green Energy

We have built solar since 2017 and delivered more than 10,000 installations across India, from single flats and society terraces to industrial plants in the hundreds of kilowatts. Four things separate us from a cheap Mumbai quote.

Authorised Adani Solar distributorGenuine Adani modules, traceable serial numbers and the full manufacturer warranty. No grey-market stock, and no unknown brand that disappears in year eight when a claim actually matters.
We build our own invertersQbits is our in-house inverter brand. Service on the component most likely to need it runs through us rather than through an importer's ticket queue.
We identify your licensee firstAdani Electricity, Tata Power and BEST each process applications their own way. We read the bill, confirm the licensee and file with the right one, which is the step most Mumbai vendors guess at.
Nothing to pay for the surveySurvey and proposal cost nothing and commit you to nothing. You keep the Bill of Materials, generation estimate and payback figure, and you are free to price them against any rival in the city.

Where we are based

Heaven Green Energy is headquartered at Mota Varachha, Surat. We have no Mumbai office and no Mumbai phone number, and we would rather say so here than after you sign. We serve Mumbai and the wider Konkan region through our channel partner network and field engineering team. They run the surveys, supervise installation and handle coordination with Adani Electricity, Tata Power or BEST on the ground.

How we work

From first call to a spinning net meter.

Four steps to a spinning net meter, including the parts that belong to your licensee rather than to us.

01

Free site survey

We measure shadow-free terrace area, check the slab and parapet, and read your sanctioned load and twelve months of consumption. We also log shading from tanks, lift rooms and neighbouring towers, and confirm the licensee.

Day 1–3
02

Written proposal

System size, layout, Bill of Materials with makes and models, generation estimate at Mumbai irradiance, your subsidy and payback. For societies we supply a version the committee can circulate.

Day 3–6
03

Applications and installation

We file with the national portal and your licensee, then install once feasibility clears. A typical flat or bungalow roof takes two to four days; a society terrace takes longer.

Day 6–20
04

Inspection, meter, subsidy

The utility inspects, fits the bidirectional meter and issues the commissioning certificate. We file your claim and government pays the subsidy into your account.

Set by your licensee

What Mumbai weather does to a solar system

A system specified for a dry inland plateau is the wrong system for a roof five kilometres from the Arabian Sea. Three local conditions change the engineering here, and the vendor who ignores them quotes you less and delivers less.

Salt mist and corrosion

Sea air carries chloride inland across the whole city, and it attacks the cheap parts of an array first: fasteners, clamps, thin galvanising and any exposed cut edge. Mumbai roofs want hot-dip galvanised or aluminium mounting, stainless fixings and properly sealed junctions. Skimp on the structure here and you are replacing it long before the panels reach their warranty.

A long, heavy monsoon

Mumbai takes around two thousand millimetres of rain between June and September, most of it in a handful of weeks. Output drops through those months, which is precisely why net metering matters more here than batteries: the surplus you bank from October to May pays for the monsoon dip. Cable entries, conduit sealing and inverter siting decide whether the system rides the rain out or trips.

High-rise wind and humidity

Terraces twelve floors up see wind speeds that a ground-floor bungalow never does, and a Konkan pre-monsoon squall tests every fastener. Wind-load design, ballast or anchoring and fastener grade are not optional at that height. Humidity adds the second problem, because damp holds grime on the glass instead of letting it blow off.

Service area

Areas of Mumbai we install in.

We install across the island city, both suburban belts and the commercial districts. The licensee notes below are the general pattern, not a guarantee for your address, because changeover cuts across localities. An area missing from this list is not one we refuse, so call and ask.

Island city (mostly BEST) Pin 400001, 400005, 400013, 400014, 400018, 400025, 400028

Colaba · Fort · Churchgate · Marine Lines · Girgaon · Malabar Hill · Tardeo · Byculla · Parel · Lower Parel · Worli · Prabhadevi · Dadar · Mahim

Western suburbs (Adani Electricity or Tata Power) Pin 400050, 400052, 400054, 400056, 400058, 400062, 400064, 400067, 400092, 400068

Bandra · Khar · Santacruz · Vile Parle · Andheri West · Jogeshwari · Goregaon · Malad · Kandivali · Borivali · Dahisar · Juhu · Versova · Lokhandwala

Eastern suburbs and harbour belt Pin 400022, 400070, 400071, 400074, 400076, 400077, 400079, 400080, 400088

Sion · Wadala · Kurla · Chembur · Ghatkopar · Vikhroli · Powai · Chandivali · Bhandup · Mulund · Govandi · Mankhurd · Antop Hill · Deonar

Commercial and industrial districts Pin 400021, 400051, 400013, 400059, 400072, 400093, 400076

Nariman Point · Bandra Kurla Complex · Lower Parel mills district · Worli business district · Andheri East MIDC · SEEPZ · Marol · Saki Naka · Powai business park · Kanjurmarg · Goregaon Nesco belt

Customers

Real customers, real cities.

Verified Heaven Green Energy customers, each shown with the city their system was actually installed in. We do not re-label customers to match the page you happen to be reading.

★★★★★
My electricity bill dropped from ₹7,800 to less than ₹400 in two months. PM Suryaghar paperwork, DISCOM approval, net meter, they handled everything.
Rameshbhai Patel
Residential · Surat · 5 kW
★★★★★
Our showroom AC bills used to be ₹38k/month. After 25 kW solar, it's ₹3,500. 25-year warranty paperwork was registered same day. Smooth experience.
Vipul Modi
Commercial · Ahmedabad · 25 kW
★★★★★
80 kW on our hospital rooftop. Diesel backup running time cut by 60%. Heaven Green's structural design cleared all wind-load checks first time.
Nilesh Bhatt
Commercial · Anand · 80 kW
Before you sign

Six things to check on any Mumbai quote.

Including ours. Take this list to every vendor you speak to.

Questions

Solar in Mumbai: every question answered.

17 questions Mumbai buyers actually search for, including the ones competing pages leave out. Grouped so you can skip to what you need.

Cost & subsidy

What is the cost of solar panel installation in Mumbai in 2026?
Roughly ₹2.00 to ₹2.50 lakh for 3 kW, ₹3.10 to ₹3.80 lakh for 5 kW and ₹5.65 to ₹6.90 lakh for 10 kW, all before subsidy. Mumbai sits at the upper end of Maharashtra because access, material hoisting and society compliance cost real money on a high-rise site.
What is the price of a 3 kW solar system in Mumbai with subsidy?
Between ₹1.22 lakh and ₹1.72 lakh net, from ₹2.00 to ₹2.50 lakh less the ₹78,000 subsidy. A 3 kW system generates 340 to 375 units a month here, which covers a household using around 350 units. It is the smallest system that earns the full subsidy.
How much solar subsidy do I get in Mumbai?
Up to ₹78,000, exactly as anywhere else in India. Per pmsuryaghar.gov.in, PM Surya Ghar pays ₹30,000 per kW for the first 2 kW and ₹18,000 for the third, nothing above that. So 2 kW earns ₹60,000 and 3 kW or larger earns ₹78,000, credited straight to your bank account.
Can a Mumbai housing society claim the subsidy for common-area solar?
Yes, for the residential common load. Group housing societies are covered by PM Surya Ghar for lifts, pumps, lobby lighting and parking, under a separate per-kW rate from the individual flat slabs. We work out the society's eligible capacity from the common-area meter, not from the number of flats.

Net metering & DISCOM

Which DISCOM serves Mumbai for rooftop solar?
It depends on your address, and sometimes on your flat. BEST supplies most of the island city, Adani Electricity Mumbai Limited holds the suburban licence, and Tata Power is a parallel licensee many suburban consumers switched to. Mulund and Bhandup sit with MSEDCL. Your bill names yours.
How do I know whether Adani Electricity or Tata Power supplies my flat?
Read the header of your electricity bill and the consumer number format. Because Mumbai allows changeover between parallel licensees, two flats on the same floor can be billed by different companies. Never assume from the building or the locality, and never let a vendor assume it either.
Is net metering available in Mumbai, and what happens to surplus units?
Yes, under the MERC framework, and it applies identically across Adani Electricity, Tata Power and BEST. Your system may be sized up to your sanctioned load. The home consumes solar first by day, and surplus is exported as credit against units drawn at night or through the monsoon.
How long does net metering take in Mumbai?
Several weeks from application to installed bidirectional meter, covering feasibility, post-installation inspection and the meter swap. Installation itself is only days of that. The licensee-controlled steps set the pace and no installer can compress them, so treat a guaranteed one-week net meter as a red flag.

Sizing & performance

How many units does 1 kW of solar generate per day in Mumbai?
About 3.8 to 4.2 units daily, averaged across the year. Mumbai gets roughly 4.8 peak sun hours, a little below inland Maharashtra because the monsoon runs long and heavy here. Output runs well above that average from November to May and drops sharply through July and August.
What size solar system does a 2 BHK or 3 BHK Mumbai flat need?
A 2 BHK usually needs 2 to 3 kW and a 3 BHK 3 to 5 kW, but size against consumption and sanctioned load, not floor plan. Take the units from twelve months of bills. In a flat, available terrace share often decides the answer before consumption does.
How much roof area do I need for solar in Mumbai?
Around 100 sq ft of genuinely shadow-free area per kW, so roughly 300 sq ft for 3 kW and 500 sq ft for 5 kW. Shadow-free is the operative word in a city of towers: a neighbouring building or your own lift room shading the array two hours a day costs real output.
Will solar work through the Mumbai monsoon?
Yes, at reduced output, because modules generate from diffuse light. This is exactly why net metering beats batteries here. The surplus exported from October to May offsets the June to September shortfall as bill credits, so the system is sized on annual generation rather than on the worst fortnight.

Installation & service

Can I install solar on a Mumbai housing society terrace?
Yes, and it is the commonest residential format in the city. The society is the terrace owner, so you need general body or committee consent in writing before the application. Societies also install common-area systems that cut the maintenance bill every flat pays into.
How long does solar installation take in Mumbai?
Two to four days on a typical flat or bungalow roof, longer on a society terrace where material has to be hoisted and work coordinated with residents. The whole process through portal registration, licensee feasibility, inspection and net meter runs several weeks. We name which steps are ours at proposal stage.
What maintenance do solar panels need in Mumbai?
Cleaning, plus corrosion checks. Coastal humidity holds grime on the glass instead of letting it blow off, so cleaning every two to three weeks through the dry months is realistic. Twice a year the fasteners, clamps and earthing need inspection for salt corrosion. Our AMC covers both.

About Heaven Green

Does Heaven Green Energy have an office in Mumbai?
No. Our headquarters is in Mota Varachha, Surat, and we have no Mumbai branch or local number. We serve the city through our channel partner network and field engineering team, who run surveys, supervise installation and handle licensee coordination locally. We would rather you knew that before signing.
Why should I choose Heaven Green Energy over a local Mumbai installer?
We have built solar since 2017 across more than 10,000 installations, and we are an authorised channel partner of Adani. We also manufacture our own Qbits inverters, so service on the failure-prone component stays in house. Price us against any local quote using the Bill of Materials we give you.
Nearby

We also install around Mumbai.

Every city we cover is listed in the solar by location directory.

Free Mumbai site survey No advance payment, no obligation Get my quote
Call WhatsApp