Madhya Pradesh is India’s second-largest state by area, with over 1.8 crore electricity consumers spread across three DISCOM zones. PM Suryaghar offers the same ₹78,000 central subsidy here as anywhere in India, and MP’s solar irradiation — 5.0–5.5 kWh/m²/day in central regions — makes rooftop solar financially attractive with a payback period of 3–4 years even without additional state incentives.
This guide covers PM Suryaghar specifically for Madhya Pradesh — the three DISCOM zones, their application processes, and the MP-specific considerations.
Direct answer. PM Suryaghar in Madhya Pradesh pays ₹78,000 central subsidy for 3 kW and above. Three DISCOMs serve MP: MPPKVVCL for western MP including Indore, MPMKVVCL for central MP including Bhopal, and MPPoKVVCL for eastern MP including Jabalpur. Total timeline is 80–110 days. MP offers additional state subsidy for BPL (Below Poverty Line) households.
Madhya Pradesh’s Three DISCOM Zones
| DISCOM | Full name | Major cities |
|---|---|---|
| MPPKVVCL | Madhya Pradesh Paschim Kshetra Vidyut Vitaran Company Limited | Indore, Ujjain, Khandwa, Burhanpur, Dhar, Ratlam, Neemuch, Mandsaur, Dewas, Shajapur |
| MPMKVVCL | Madhya Pradesh Madhya Kshetra Vidyut Vitaran Company Limited | Bhopal, Gwalior, Shivpuri, Guna, Vidisha, Raisen, Sehore, Hoshangabad, Betul, Datia |
| MPPoKVVCL | Madhya Pradesh Poorv Kshetra Vidyut Vitaran Company Limited | Jabalpur, Rewa, Sagar, Satna, Katni, Chhindwara, Seoni, Balaghat, Damoh, Panna, Tikamgarh |
Your electricity bill shows the DISCOM logo and name. Entering your consumer number at pmsuryaghar.gov.in also auto-identifies your DISCOM.
Subsidy and Economics for MP Consumers
Application Process for MPPKVVCL (Indore)
- Visit pmsuryaghar.gov.in, select Madhya Pradesh → MPPKVVCL.
- Enter your MPPKVVCL consumer number (on bill — typically 13 digits for urban, 11 for rural consumers).
- Complete OTP with your DISCOM-registered mobile number.
- Select an empanelled installer from the portal list (filter by district).
- MPPKVVCL feasibility approval: 12–20 working days.
- Installation after feasibility approval.
- MPPKVVCL inspection after commissioning report upload: 12–22 working days.
- Net meter installation and subsidy DBT: 35–50 days.
Total timeline for MPPKVVCL: approximately 80–105 days.
Application Process for MPMKVVCL (Bhopal, Gwalior)
- Select Madhya Pradesh → MPMKVVCL at pmsuryaghar.gov.in.
- Enter your MPMKVVCL consumer account number.
- MPMKVVCL feasibility: 12–22 working days.
- MPMKVVCL inspection: 15–25 working days (Bhopal city tends to be faster; Gwalior slightly slower).
- Net meter and DBT: 35–50 days.
Total timeline for MPMKVVCL: approximately 82–112 days.
Application Process for MPPoKVVCL (Jabalpur)
- Select Madhya Pradesh → MPPoKVVCL at pmsuryaghar.gov.in.
- Enter your MPPoKVVCL consumer number.
- MPPoKVVCL feasibility: 15–25 working days (eastern MP has rural-heavy territory; inspectors cover longer distances).
- MPPoKVVCL inspection: 15–28 working days.
- Net meter and DBT: 35–50 days.
Total timeline for MPPoKVVCL: approximately 90–118 days.
MP BPL Additional Subsidy
The Madhya Pradesh Renewable Energy Agency (MPRA) provides an additional state subsidy for BPL (Below Poverty Line) households applying for PM Suryaghar. The amount and eligibility criteria change periodically — check the MPRA website or your DISCOM’s solar cell for current details. This is the only state-level financial benefit currently running in MP for rooftop solar.
Documents Required in Madhya Pradesh
| Document | MP-specific note |
|---|---|
| Aadhaar card | Exact name match with electricity bill |
| Electricity bill (MPPKVVCL/MPMKVVCL/MPPoKVVCL) | “Domestic” consumer category |
| Property proof | Khasra/Khatoni (rural) or registered sale deed (urban) |
| Bank account (Aadhaar-seeded) | Verify via NPCI portal or bank |
| Passport photo | Standard |
Rural MP: Khasra/Khatoni land records from the Patwari are the standard property proof. Urban consumers use registered sale deed or municipal house tax receipt.
System Sizing for Madhya Pradesh
| City | Peak sun hours/day | Recommended kW = monthly kWh ÷ |
|---|---|---|
| Indore | 5.2–5.5 | 155 |
| Bhopal | 5.0–5.3 | 150 |
| Gwalior | 5.3–5.6 | 158 |
| Jabalpur | 4.8–5.1 | 143 |
| Rewa | 5.2–5.5 | 155 |
💡 Fast tip
Gwalior and Rewa get the best solar resource in MP. Jabalpur and the Mahakaushal region get slightly less due to higher monsoon cloud cover. Size your system based on annual average, not just summer peak.
How Heaven Green Energy Helps MP Customers
- Residential Solar — complete PM Suryaghar handling from document audit to DBT follow-up.
- PM Suryaghar Complete Guide — full national scheme overview.
- Solar Payback Period Explained — ROI calculations for various states.
- Contact us — talk to our MP-experienced solar team.
Frequently Asked Questions
Which DISCOM serves Indore for PM Suryaghar?
Indore falls under MPPKVVCL (Madhya Pradesh Paschim Kshetra Vidyut Vitaran Company). Select MP → MPPKVVCL on the PM Suryaghar portal.
Does MP offer any additional solar subsidy?
The MP government offers an additional subsidy for BPL households through MPRA. For non-BPL residential consumers, only the central ₹78,000 subsidy applies as of June 2026.
How long does PM Suryaghar take in Madhya Pradesh?
MPPKVVCL (Indore) takes 80–105 days. MPMKVVCL (Bhopal) takes 82–112 days. MPPoKVVCL (Jabalpur) takes 90–118 days. Rural areas within each zone can take longer due to inspector travel time.
What is the electricity tariff in MP for domestic consumers?
MP domestic tariff varies by DISCOM and consumption slab. The range is approximately ₹4.50–₹6.50 per kWh for LT-domestic consumers in the 100–500 kWh/month range. Check your DISCOM’s tariff schedule for the current rates.