PM Surya Ghar Madhya Pradesh: MPPKVVCL, MPMKVVCL & MPPoKVVCL

PM Surya Ghar in Madhya Pradesh, ₹78,000 subsidy, three DISCOM application process (MPPKVVCL Indore, MPMKVVCL Bhopal, MPPoKVVCL Jabalpur), timelines. June 2026.

PM Surya Ghar Madhya Pradesh: MPPKVVCL, MPMKVVCL & MPPoKVVCL

Madhya Pradesh is India’s second-largest state by area, with electricity consumers spread across three DISCOM zones. PM Suryaghar offers the same ₹78,000 central subsidy here as anywhere in India, and MP’s solar irradiation, 5.0 to 5.5 kWh/m²/day in central regions, together with upper-slab domestic tariffs above ₹7 per unit, makes rooftop solar financially attractive with a payback period of roughly 3 to 4 years without any state incentive.

This guide covers PM Suryaghar specifically for Madhya Pradesh, the three DISCOM zones, their application processes, and the MP-specific considerations.

Direct answer. PM Suryaghar in Madhya Pradesh pays ₹78,000 central subsidy for 3 kW and above. Three DISCOMs serve MP: MPPKVVCL for western MP including Indore, MPMKVVCL for central MP including Bhopal, and MPPoKVVCL for eastern MP including Jabalpur. Total timeline is typically 80 to 110 days. Budget on the central subsidy alone: we could not confirm any MP state top-up for residential rooftop solar.

Madhya Pradesh’s Three DISCOM Zones

Madhya Pradesh DISCOM zones and their main cities
DISCOMFull nameMajor cities
MPPKVVCLMadhya Pradesh Paschim Kshetra Vidyut Vitaran Company LimitedIndore, Ujjain, Khandwa, Burhanpur, Dhar, Ratlam, Neemuch, Mandsaur, Dewas, Shajapur
MPMKVVCLMadhya Pradesh Madhya Kshetra Vidyut Vitaran Company LimitedBhopal, Gwalior, Shivpuri, Guna, Vidisha, Raisen, Sehore, Hoshangabad, Betul, Datia
MPPoKVVCLMadhya Pradesh Poorv Kshetra Vidyut Vitaran Company LimitedJabalpur, Rewa, Sagar, Satna, Katni, Chhindwara, Seoni, Balaghat, Damoh, Panna, Tikamgarh

Your electricity bill shows the DISCOM logo and name. Entering your consumer number at pmsuryaghar.gov.in also auto-identifies your DISCOM.

Subsidy and Economics for MP Consumers

₹78,000
Central subsidy (3 kW+)
[MNRE](/glossary/mnre), 2026
5.0 to 5.5
kWh/m²/day (central MP)
Annual average, central MP
3 to 4
Year payback period
At MP upper-slab domestic tariff

Application Process for MPPKVVCL (Indore)

  1. Visit pmsuryaghar.gov.in, select Madhya Pradesh → MPPKVVCL.
  2. Enter your MPPKVVCL consumer number exactly as printed on your bill.
  3. Complete OTP verification with your mobile number.
  4. Select a vendor registered on the PM Suryaghar national portal (filter by district).
  5. MPPKVVCL feasibility approval: 12 to 20 working days where a feasibility check is still carried out (under the Electricity (Rights of Consumers) Rules as amended in February 2024, systems up to 10 kW are deemed technically feasible without a study).
  6. Installation after feasibility approval.
  7. MPPKVVCL inspection after commissioning report upload: 12 to 22 working days.
  8. Net meter installation and DISCOM approval on the portal, then the subsidy DBT, processed within 15 days of approval once you redeem the e-token.

Total timeline for MPPKVVCL: approximately 80 to 105 days.

Application Process for MPMKVVCL (Bhopal, Gwalior)

  1. Select Madhya Pradesh → MPMKVVCL at pmsuryaghar.gov.in.
  2. Enter your MPMKVVCL consumer account number.
  3. MPMKVVCL feasibility: 12 to 22 working days.
  4. MPMKVVCL inspection: 15 to 25 working days (Bhopal city tends to be faster; Gwalior slightly slower).
  5. Net meter and DISCOM approval, then the subsidy DBT, processed within 15 days of approval once you redeem the e-token.

Total timeline for MPMKVVCL: approximately 82 to 112 days.

Application Process for MPPoKVVCL (Jabalpur)

  1. Select Madhya Pradesh → MPPoKVVCL at pmsuryaghar.gov.in.
  2. Enter your MPPoKVVCL consumer number.
  3. MPPoKVVCL feasibility: 15 to 25 working days (eastern MP has rural-heavy territory; inspectors cover longer distances).
  4. MPPoKVVCL inspection: 15 to 28 working days.
  5. Net meter and DISCOM approval, then the subsidy DBT, processed within 15 days of approval once you redeem the e-token.

Total timeline for MPPoKVVCL: approximately 90 to 118 days.

State Subsidy in MP

We could not confirm any Madhya Pradesh state top-up for residential rooftop solar under PM Suryaghar, including for BPL (Below Poverty Line) households. Budget on the central subsidy alone, and ask your DISCOM’s solar cell to confirm any state scheme in writing before you count on it.

Documents Required in Madhya Pradesh

Documents for a Madhya Pradesh application
DocumentMP-specific note
Aadhaar cardExact name match with electricity bill
Electricity bill (MPPKVVCL/MPMKVVCL/MPPoKVVCL)“Domestic” consumer category
Property proofKhasra/Khatoni (rural) or registered sale deed (urban)
Bank account (cancelled cheque or passbook)Must be in the applicant’s name; subsidy goes to the loan account first if financed
Passport photoStandard

Rural MP: Khasra/Khatoni land records from the Patwari are the standard property proof. Urban consumers use registered sale deed or municipal house tax receipt.

System Sizing for Madhya Pradesh

CityPeak sun hours/dayRecommended kW = monthly kWh ÷
Indore5.2 to 5.5124
Bhopal5.0 to 5.3119
Gwalior5.3 to 5.6126
Jabalpur4.8 to 5.1114
Rewa5.2 to 5.5124

The divisor is the monthly output of 1 kW: mid-range peak sun hours × 30 days × a 77% performance ratio for system losses.

How Heaven Green Energy Helps MP Customers

Frequently Asked Questions

Which DISCOM serves Indore for PM Suryaghar?

Indore falls under MPPKVVCL (Madhya Pradesh Paschim Kshetra Vidyut Vitaran Company). Select MP → MPPKVVCL on the PM Suryaghar portal.

Does MP offer any additional solar subsidy?

We could not confirm any Madhya Pradesh state top-up for residential rooftop solar, so budget on the central PM Suryaghar subsidy alone (up to ₹78,000) and ask your DISCOM’s solar cell to confirm any state scheme in writing.

How long does PM Suryaghar take in Madhya Pradesh?

MPPKVVCL (Indore) takes 80 to 105 days. MPMKVVCL (Bhopal) takes 82 to 112 days. MPPoKVVCL (Jabalpur) takes 90 to 118 days. Rural areas within each zone can take longer due to inspector travel time.

What is the electricity tariff in MP for domestic consumers?

MPERC’s retail supply tariff order for FY 2026-27 sets one domestic (LV-1.2) schedule for all three DISCOMs: ₹4.71 per unit up to 50 units, ₹5.67 for 51 to 150 units, ₹7.05 for 151 to 300 units and ₹7.24 above 300 units, plus a monthly fixed charge. Check your bill for any government subsidy applied to low-consumption households.

Written by
Nirav Dhanani

Co-Founder & CEO of Heaven Green Energy. Leads strategy, growth, and customer outcomes across 10,000+ residential, commercial, and industrial solar installations in India.

Ready to Go Solar?

Turn this knowledge
into real savings.

Get a free site assessment and custom savings proposal, no cost, no commitment. Our engineers will visit your location within 24 hours.

Call WhatsApp