Quick answer. An excess demand charge applies when the billing demand exceeds the consumer’s contracted demand under a tariff that has such a provision. For HTP-I customers on the Gujarat state-owned DISCOM FY 2026–27 schedule, billing demand is the highest of actual monthly maximum demand, 85% of contract demand and 100 kVA. Demand within the contract is charged in its published slabs; the portion above contract demand is charged at ₹555 per kVA per month under section 11.1.2. LTMD uses different units and rates. Read the exact tariff code and bill before calculating a charge. GERC DGVCL FY 2026–27 tariff schedule, sections 5 and 11.
This explanation uses the state-owned DISCOM schedule effective 1 April 2026, which says its rates apply to DGVCL, MGVCL, PGVCL and UGVCL. A customer of another licensee must consult its own tariff order. The article explains the bill mechanic, not a promise that rooftop solar will remove an excess-demand line. A factory considering solar can use the industrial solar overview to examine its actual demand profile, load and connection.
Four numbers that should not be mixed
Contract demand is the kW or kVA level for which the supplier undertakes to provide facilities under the supply agreement. It is a contractual capacity figure, not the energy used in a month. Maximum demand is the largest measured average demand over the relevant meter integration period, not necessarily an instantaneous spike on an instrument. Billing demand is the tariff-defined number used to calculate demand charges. Energy consumption is kWh over time. A plant can have high monthly energy but no excess demand, or one short high-demand interval and modest monthly energy.
For HTP-I, the current schedule defines billing demand as the highest of actual maximum demand in the month, 85% of contract demand, or 100 kVA. It defines maximum demand as an average over the specified consecutive 30/15-minute period, or an opted three-minute period for a parallel-operation case with suitable metering. That measurement window matters: a momentary motor-starting transient is not automatically identical to the recorded maximum-demand value. The meter and tariff determine what the bill uses. GERC tariff schedule, HTP-I sections 11.4 and 11.7.
For LTMD, billing demand uses the highest of 85% of contract demand, actual monthly maximum demand and 6 kW. The units are kW rather than HTP-I’s kVA. Do not put a kVA number into an LTMD formula or compare a ₹/kW rate with a ₹/kVA rate without understanding power factor. LTMD demand charges and the excess band are stated separately in section 5. GERC tariff schedule, LTMD sections 5.1 and 5.6.
| Tariff category in state-owned DISCOM FY 2026–27 schedule | Billing-demand floor or test | Excess-demand rate |
|---|---|---|
| HTP-I regular HT, section 11 | Highest of actual monthly maximum, 85% of contract, 100 kVA | ₹555 per kVA per month above contract demand |
| LTMD, section 5 | Highest of actual monthly maximum, 85% of contract, 6 kW | ₹265 per kW above contract demand |
| Non-RGP, section 4 | Fixed charges based on connected load; different structure | Do not apply HTP-I/LTMD excess rate to a Non-RGP bill |
Source: GERC DGVCL tariff order, effective 1 April 2026. The table is category-specific. Other tariff classes have their own terms.
Worked HTP-I example with the published rate
Take a hypothetical HTP-I factory with a 500 kVA contract demand and an actual maximum demand of 540 kVA in one month. The three billing-demand candidates are 540 kVA actual, 425 kVA as 85% of contract, and 100 kVA minimum. The highest is 540 kVA. The portion within contract is 500 kVA; the portion above contract is 40 kVA. The published HTP-I rate for the first 500 kVA within contract is ₹150/kVA/month, giving a base demand component of 500 × ₹150 = ₹75,000. The excess component is 40 × ₹555 = ₹22,200. Together those two demand components are ₹97,200 before energy, time-of-use, power-factor adjustments, taxes, duties or other bill items. GERC tariff schedule, HTP-I section 11.1.
The example intentionally uses a 500 kVA contract so the within-contract slab is straightforward. If contract demand is above 500 kVA, the next 500 kVA of billing demand has a different published rate, and above 1,000 kVA another rate. Do not multiply all within-contract kVA by the first slab rate. The excess rate applies to the excess portion, not necessarily to the entire monthly demand. A bill may also have taxes or adjustments not included in this two-line demonstration. The example is a formula check, not a quotation for any real factory.
Now take the same contract demand with actual maximum demand of only 350 kVA. The billing demand is still 425 kVA because 85% of contract demand is higher. There is no excess over the 500 kVA contract, but demand charges do not fall to zero. This floor explains why a rooftop solar system that reduces monthly grid energy may leave a substantial demand-charge line. It can also explain why a factory that uses far less capacity than contracted may wish to review its contract demand with the utility as a separate planning question.
Worked LTMD example, without borrowing HT rates
Consider a hypothetical LTMD consumer with 50 kW contract demand and a recorded maximum of 55 kW. The floor at 85% is 42.5 kW, and the minimum is 6 kW, so billing demand is 55 kW. The first 40 kW within contract is charged at ₹90/kW/month and the next 10 kW within contract at ₹130/kW/month. That within-contract portion is 40 × ₹90 + 10 × ₹130 = ₹4,900. The excess 5 kW is charged at ₹265/kW, or ₹1,325. The two demand components total ₹6,225, before energy and other applicable items. GERC tariff schedule, LTMD section 5.1.
This example illustrates why the bill’s unit must be recorded. A kW figure refers to active power; a kVA figure refers to apparent power. Power factor connects them, but a bill calculation must follow the regulator’s specific category and measurement, not a rough conversion. If a plant’s bill has a reactive-energy or power-factor adjustment, treat that as its own line. It is possible for demand and power-factor charges to change independently.
Why an excess line can appear even after solar
Solar output varies with sunlight and weather. Maximum demand can occur in the early morning, evening, at night, during a cloudy period, or when several machines restart together. If the meter’s peak interval occurs when PV output is low, rooftop solar will have little effect on the recorded maximum. Even when solar covers some daytime load, the tariff’s 85% contract-demand floor can keep the billing demand high. Therefore, annual PV generation cannot be used to predict a demand-charge reduction. The model needs timestamped demand data and an estimate of PV output in the same intervals.
Consider a factory that produces mainly during daylight but has a large compressor start at 18:30. Solar may lower energy imports during the day and still leave the evening maximum untouched. Another factory might have its peak at 13:00 on a clear day; solar could lower grid demand in that interval, yet a cloudy day later in the month might set a new peak. An EPC should model several representative days and show the maximum-demand risk, not guarantee a percentage reduction from a single noon load reading.
The plant can often attack excess demand through operations as well as generation. Stagger motor starts, review simultaneous heating or cooling cycles, audit demand-controller settings and compare the contract demand with the production plan. Such actions need plant-engineer approval; an ill-timed demand cap could interrupt critical process or safety loads. If the recurring peak is structural, a contract-demand revision may be worth discussing with the utility. If it is a rare event, the trade-off may be different. A solar proposal should be honest about which problem it can address.
A bill-reading procedure
First, find the tariff category and licensee on the bill. Second, locate contract demand and the recorded actual maximum demand for the billing period, including their units. Third, apply the category’s billing-demand test from the current schedule. Fourth, separate the within-contract demand portion from the excess portion. Fifth, use the appropriate rates and slabs for each. Sixth, reconcile the calculated demand line with any billing-period adjustment, taxes or special terms. If it does not match, obtain a detailed bill explanation before putting the number into a solar savings model.
Keep the demand history for at least a year. Mark planned shutdowns, seasonal production and new equipment. A single excess-demand month can be a genuine production change, a meter or billing issue, or a short operating event. The answer differs in each case. Ask the plant’s electrical team to compare the meter log with production events before changing a contract or buying equipment to solve a charge.
The schedule can change by financial year. If a project is evaluated in January 2027, the April 2026 order is the relevant published baseline at the date of this research, but the tariff must be rechecked before a later contract or commissioning forecast. A model should record the tariff order, date, category and exact sections used. That allows another reviewer to reproduce the calculation when rates or contract demand change.
What rooftop solar can and cannot change on the bill
A grid-connected solar plant can lower imported electrical energy while it operates and the factory uses that power behind the meter. Depending on the approved mechanism, some surplus may be exported or valued differently. Gujarat’s current distributed renewable energy regulation says non-residential net-metering exports can be adjusted against up to 30% of imported energy in the billing period, subject to applicable banking charges, with excess exports beyond the cap lapsed. It also says other fixed or demand charges remain payable. GERC Notification 11/2026, Regulations 9.1.5 and 9.1.9.
This is why a proposed “solar saving” needs at least two models: one for energy imports and exports, another for demand charges. The energy model can often be based on hourly or interval use and a solar production estimate. The demand model must test the highest net-import interval in each month under plausible weather and operating conditions, plus the tariff floor. It should show uncertainty. A spreadsheet that subtracts average solar kW from every maximum-demand reading will probably overstate reliability.
A battery or demand-management controller may be able to address some peaks, but that is a separate design and cost. It needs control rules, safety assessment, cycle and capacity modelling, and a clear statement of which loads may be curtailed. Do not quietly include a battery benefit in a rooftop PV-only quote. Likewise, power-factor correction is a separate bill issue even if it appears near demand charges. The finance team should see each mechanism and investment independently.
Questions to ask before changing contract demand
Does the current contract reflect planned production growth? How often has actual maximum demand exceeded it, and by how much? Is the excess driven by one process, one time of day or a meter event? What is the 85% floor if the contract remains the same? What would a higher contract do to the minimum billing demand and security deposit or network requirements? What application and notice does the utility require to change the contract? These are utility and operations questions; the cheapest-looking tariff calculation for one quiet month may not be right for the factory’s next year.
Ask the EPC to show a scenario with no solar, with solar alone, and with any separate operational change it proposes. Keep the same production assumptions across scenarios. Report imported kWh, maximum demand, billing demand, excess portion and all charge lines. If one scenario assumes a shutdown or changed shift, label it. That turns a vague savings promise into a decision the factory can test against its actual production plan.
Common questions
Is excess demand the same as high electricity consumption? No. Demand measures power during a defined interval; consumption is energy accumulated over time. A short peak can produce an excess-demand line even when monthly kWh is ordinary.
Does the excess rate apply to all kVA? Under HTP-I section 11.1.2, the published excess rate applies to billing demand above the contract demand. Within-contract demand follows its own slabs. Check the exact category for your bill.
Can solar remove the line automatically? No. The peak may happen without sunshine, and the 85% contract-demand floor remains. Use timestamped data before estimating any demand-charge effect.
Why does my LTMD bill use kW rather than kVA? That is how the cited LTMD schedule states its demand rates. Do not reuse an HTP-I kVA rate for an LTMD calculation.
Where can I check the current rule? The GERC tariff order for FY 2026–27 contains the state-owned DISCOM schedule. Verify your licensee and category first, then check for later orders before acting.
To check a specific demand-charge example, enter the bill values in the maximum-demand penalty calculator.
Get a load-based proposal for my plant. Share twelve bills, interval demand data if available, the contract-demand letter, SLD and production calendar through the business enquiry form on industrial solar, or call +91 63904 05060. Heaven Green Energy is a Surat solar company founded in 2017. The useful first analysis is to separate energy imports from the recorded demand peak and the tariff’s billing floor.