An HT electricity bill is easier to read when you separate capacity, energy, timing, and other charges. Capacity appears as contract demand, measured maximum demand and billing demand, usually in kVA. Energy appears as units imported, usually in kWh, and sometimes kVAh. Time-of-use adjustments depend on when those units were used. Duties, surcharges, previous balance and payments are separate again. Adding these numbers into one “rate per unit” hides the part rooftop solar can affect and the part it may leave untouched.
This walkthrough uses the GERC tariff order for DGVCL, FY 2026-27, dated 25 March 2026, as a worked Gujarat example. DGVCL is not the only licensee in Gujarat. A Torrent Power, UGVCL, MGVCL or PGVCL bill needs its own applicable order. Even within DGVCL, a plant on HTP-II, a night-use option, or a seasonal tariff has conditions that differ from the standard HTP-I schedule. Identify the tariff category printed on the first page of your actual bill before using any rate here.
Rules checked: 23 November 2026. This is a guide to understanding bill lines, not a replacement bill or a promise of savings. Use the current tariff order and your actual bill before making an investment or contract-demand decision.
Start with the account details, not the amount due
Find the consumer number, licensee, billing period, tariff category, supply voltage and contract demand. A factory group may have several meters: the production building, a warehouse, a residential colony or an additional feeder may each have a different connection. A solar proposal must name the account it intends to offset. Otherwise the system could be sized against the wrong units, or a claimed credit could be assigned to a meter that is not part of the approved arrangement.
Read the dates carefully. A bill issued in November may cover consumption in October; a payment received after the bill closes may appear on the next statement. Compare a solar model with energy and demand in the same billing period, not a calendar month from an operations report and a bill from a different cycle. If your plant uses two shifts and has an annual shutdown, one bill is a poor representation of its normal load. Save at least 12 consecutive bills before using the figures to size a system or consider a demand change.
| Bill label | What it tells you | What to copy into a review sheet |
|---|---|---|
| Licensee and tariff | Which approved rate schedule applies | Exact printed name and category, not “HT factory” |
| Consumer number | The connection being billed | Full number, held privately |
| Billing dates | Period covered by meter readings | Start and end dates, number of days |
| Supply voltage | How the connection is served | Printed voltage, such as 11 kV if shown |
| Contract demand | Capacity reserved in the agreement | Number and unit, normally kVA for HTP-I |
| Previous and present readings | Basis for billed energy and demand | Meter readings and multiplier, if displayed |
The table is a reading checklist, not a sample DGVCL invoice. Bill layouts can change, and the exact label used on your statement may differ. If a field is missing, use the signed supply agreement or ask the utility for the record instead of guessing from your transformer nameplate.
Contract demand, maximum demand and billing demand
Contract demand is the maximum kW or kVA for which the supplier undertakes to provide facilities under the supply agreement. It is not the energy used that month. Actual maximum demand is the highest qualifying average demand recorded by the meter over the tariff’s measurement interval. The DGVCL HTP-I schedule describes an average over consecutive 30 or 15 minutes, with a specific three-minute option for parallel grid operation. A short motor starting current and the month’s billed maximum demand are therefore not automatically the same number. DGVCL HTP-I §§11.7–11.8.
Billing demand is the number used for demand charges. Under DGVCL HTP-I for FY 2026-27, it is the highest of actual maximum demand in the month, 85% of contract demand, or 100 kVA. A quiet month does not necessarily remove the demand charge because the 85% floor may be higher than the measured peak. A month with demand above contract is treated differently again. DGVCL HTP-I §11.4.
Suppose an illustrative bill has 600 kVA contract demand and 560 kVA actual maximum demand. The 85% floor is 510 kVA. Compare 560, 510 and 100; 560 kVA is the billing demand. The rate for that demand is tiered: the first 500 kVA at ₹150/kVA/month and the next 60 kVA at ₹260/kVA/month. The demand-charge component is ₹75,000 + ₹15,600 = ₹90,600. This example is calculated from DGVCL HTP-I §§11.1 and 11.4; the inputs are deliberately illustrative, not a Heaven customer bill.
| Demand line in example | Formula | Result |
|---|---|---|
| Contract-demand floor | 600 × 85% | 510 kVA |
| Billing demand | max(560 actual, 510 floor, 100 minimum) | 560 kVA |
| Demand charge, first slab | 500 × ₹150 | ₹75,000 |
| Demand charge, next slab | 60 × ₹260 | ₹15,600 |
| Demand charge before other bill items | ₹75,000 + ₹15,600 | ₹90,600 |
If actual maximum demand rises to 650 kVA under the same 600 kVA contract, the 50 kVA above contract is billed under the order’s separate ₹555/kVA/month excess-demand rate. The demand charge is then ₹75,000 for the first 500 kVA, ₹26,000 for the next 100 kVA within contract, plus ₹27,750 for the excess 50 kVA: ₹128,750 in this illustration. Do not treat the entire 650 kVA as “excess”; only the portion above contract takes that excess rate. DGVCL HTP-I §11.1.2.
The demand charge is the first place to separate a solar energy case from a capacity-contract case. Rooftop solar may lower imported energy. It might lower a measured daytime peak if production and solar generation coincide, but it does not automatically amend the supply agreement or erase the 85% billing floor. A plant whose monthly peak occurs at 7 pm can import fewer units over the month and still have much the same maximum-demand reading. Use interval data if you want to claim a demand effect.
The imported energy line: kWh is different from kVA
The familiar “units” line generally measures electrical energy in kWh over the billing period. This is not contract demand. A factory can use 150,000 kWh in a month while holding 600 kVA contract demand; one is accumulated energy and the other is a capacity term. The energy rate in DGVCL’s FY 2026-27 HTP-I order depends on billing-demand band. For an HTP-I billing demand above 500 and up to 2,500 kVA, the schedule lists 420 paise per kWh, or ₹4.20/kWh, before the other tariff adjustments. DGVCL HTP-I §11.2.
Continue the illustrative 560 kVA bill. If the factory imported 150,000 kWh from the grid, its base HTP-I energy-charge line under that band is 150,000 × ₹4.20 = ₹630,000. That amount is separate from the ₹90,600 demand charge. It is not the final bill because time-of-use charges, discounts, power-factor treatment, duties, surcharges and any arrears may still apply. The number of solar-generated kWh that would replace grid import cannot be inferred from this one total; you need the load shape, proposed generation profile and connection/metering arrangement.
Some HT bills also display kVAh, a measure of apparent energy. It is related to kWh and power factor, but it should not be silently substituted for the kWh quantity used in a particular tariff clause. The calculation depends on how the meter and tariff record active energy, apparent energy and reactive energy. If your bill has both, read each printed line and the applicable order. A glossary can define the relationship; a bill review must still identify which measured quantity the utility actually used for each charge.
Time-of-use: when the units were imported matters
The DGVCL HTP-I order adds a time-of-use charge for units imported in two peak periods: 07:00–11:00 and 18:00–22:00. For billing demand above 500 kVA, the stated additional charge is 85 paise/kWh on those peak-period units. The same schedule lists a 60 paise/kWh concession for consumption during 11:00–17:00. DGVCL HTP-I §§11.3 and 11.10. Confirm your meter’s time-of-day registers and bill period before reproducing a time-of-use amount.
Using illustrative figures again, if 20,000 kWh of the month’s grid import falls in the two peak windows, the additional charge at 85 paise is ₹17,000. If 30,000 kWh falls in the 11:00–17:00 discount window, the concession at 60 paise is ₹18,000. The combined effect of those two example lines is minus ₹1,000 relative to the base energy charge, before any other line. The quantities are assumed for teaching the bill; they do not describe a real plant.
| Illustrative HTP-I item | Input or rate | Amount |
|---|---|---|
| Base imported energy | 150,000 kWh × ₹4.20 | ₹630,000 |
| Peak-period addition | 20,000 kWh × ₹0.85 | +₹17,000 |
| Midday concession | 30,000 kWh × ₹0.60 | −₹18,000 |
| Demand charge from prior example | 560 kVA billing demand | +₹90,600 |
| Partial subtotal only | Excludes several bill lines below | ₹719,600 |
This partial subtotal is not a forecast of the amount payable. It omits power-factor adjustments, any voltage rebate, fuel or purchase-cost adjustment, electricity duty, taxes where applicable, arrears and other bill-specific items. An HT bill cannot be verified by adding only the two large numbers on the front page. The purpose of the table is to show why the tariff has separate lines for demand, imported energy and timing.
For solar sizing, the midday concession also means a grid unit displaced at noon does not necessarily have the same bill value as a grid unit displaced in an evening peak window. A solar array does not produce equally in all time blocks, and it cannot offset night imports directly without an applicable storage or settlement route. A proposal that multiplies every projected solar kWh by one flat tariff can therefore misstate the result. Ask for a time-of-day model if those adjustments materially affect your bill.
Power factor, reactive energy and other adjustments
Power factor compares active power with apparent power. An HT bill may show a monthly power-factor value and a penalty or rebate. Under DGVCL HTP-I, the FY 2026-27 schedule describes a penalty when average power factor falls below 90%, with a higher increment below 85%, and a rebate when it exceeds 95%. The adjustment is based on the energy-charge amount specified in the tariff clause, not on the total amount due. DGVCL HTP-I §11.6. Do not estimate it from a single motor’s nameplate power factor; use the monthly meter reading and actual tariff method.
A rooftop solar plant can alter the power-flow pattern seen by the meter while motors and other reactive loads remain in operation. That is why the plant electrical team should check APFC settings and actual post-commissioning readings rather than assuming the existing capacitor steps will remain ideal. A power-factor penalty or rebate is not a generic “solar saving” line. It needs its own measured basis. If your proposal mentions APFC changes, ask who measures, adjusts and signs them off.
The order also contains a rebate on energy charges for supply at certain high or extra-high voltages. The percentage depends on the stated supply voltage, and other adjustments can be conditional. A separate fuel and power purchase price adjustment, often abbreviated FPPPA or shown under another bill label, may vary by period. Electricity duty is a government levy, not an energy unit rate created by your EPC. Some bills include previous balance, late payment charge, deposit adjustment or a credit from an earlier period. Read the bill’s actual line descriptions and governing notice before assigning a rate.
The practical test is to ask: What quantity and rule produced this line? Demand charge uses billing demand and its slabs. Energy charge uses imported units and the applicable band. Time-of-use uses units in specified hours. Power factor uses the measured monthly result and the tariff’s adjustment method. Duty or surcharge has its own legal basis. Payments and arrears refer to account history. Once each line has a unit, date and source, a bill that looked like one large rupee amount becomes a list you can check.
Solar, export and the HT bill
For a new Gujarat distributed renewable system commissioned after the GERC 2026 DRES notification, the chosen metering arrangement determines how generated and exported units appear on the bill. Net metering, net billing, gross metering, group net metering and virtual net metering are different mechanisms. Do not assume that a “net meter” is a universal name for every rooftop connection. The system’s commissioning date and executed agreement matter, especially for an existing plant under older rules.
For non-residential net metering, the 2026 rule allows exported units to be adjusted against grid import in the same billing cycle only up to 30% of the energy drawn from the licensee, subject to applicable banking charges; export beyond that permitted adjustment lapses under the provision. Time-of-day restrictions also apply to the adjustment. Exported kWh do not pay fixed or demand charges or government levies. GERC DRES 2026, Regulation 9.1.5–9.1.9. That is why you must keep direct self-consumption, metered export, and grid import as three separate quantities in a solar savings model.
After commissioning, compare the first bill with the expected meter arrangement. Look for the generation meter reading, export reading, import reading and the billed adjustment. The 2026 rule says a net-meter bill should show generation, export, import, direct consumption and net billed or surplus information. If a field does not appear, ask DGVCL for the meter-reading and bill calculation rather than guessing that it is embedded in another line. GERC DRES 2026, Regulation 9.1.4.
A five-minute check before accepting a solar savings table
- Confirm the licensee and tariff category. Use the bill, not the factory’s city, to select the order.
- List 12 months of kWh and maximum demand. Mark shutdown months and peak production months. Do not size from the latest bill alone.
- Separate the bill. Create columns for demand charge, base energy charge, time-of-use, power factor, duty, surcharges, taxes, arrears and adjustments. A proposed saving must say which line changes.
- Ask for interval data where the peak matters. If the salesperson claims solar will reduce contract-demand costs, ask which billed demand interval is expected to shift and whether the 85% contract floor still dominates.
- Ask which metering rule applies. A newly commissioned plant’s export value is not the same as on-site consumption. Check the current GERC rule, the licensee procedure and the actual agreement.
- Keep the calculations dated. A tariff order applies to a defined period. A 2027 proposal should not quietly use an FY 2026-27 rate after a newer order takes effect.
The worked arithmetic above lets you check the demand-charge component. For a factory installation, industrial solar explains how the bill, roof and operating hours inform a load-based proposal. For a shop, office or other business site, commercial solar is the more relevant service page.
Compare the bill’s apparent-energy line with the kVAh billing calculator once you have the matching kWh and average power factor.
If your bill has a charge you cannot explain, bring the complete statement and, if possible, the previous 12 months to a plant electrical or tariff review. Heaven Green Energy can use those records to frame a rooftop solar proposal around your actual load and DGVCL connection. Get a load-based proposal for my plant through the business enquiry form, or send the site’s bill period and operating hours to WhatsApp. Keep the full consumer number in a private enquiry, not a public review.