LTMD means a low-tension connection billed with a maximum-demand component. For a small factory, the key bill questions are: Which tariff category is printed on the account? What is the contracted load or demand in kW? What maximum demand did the meter record? And how many kWh were imported in each time period? The LTMD bill is not one flat “price per unit.” It combines demand charges, energy charges, time-of-use adjustments and other applicable items. The 2026 DGVCL tariff below gives a concrete South Gujarat example. A factory supplied by another utility must use that utility’s current schedule.
Under the GERC DGVCL tariff order for FY 2026-27, the LTMD rate applies to premises not covered by another tariff category with aggregate load above 40 kW. It also applies to a Non-RGP consumer that opts for LTMD in place of the Non-RGP tariff. That wording matters: a factory’s use alone does not establish its category, and a 40 kW number in an equipment list does not prove which tariff DGVCL is billing. Read the actual bill and supply agreement before using any amount in this guide. DGVCL tariff, Rate LTMD §5, p.161.
Rules checked: 23 November 2026. The rates shown are from the order dated 25 March 2026 for FY 2026-27. They are not a price quotation from Heaven Green Energy or a prediction for a later billing period. Recheck the current GERC order and your tariff category before deciding on a connection, load change or solar investment.
Why a small factory should identify LTMD first
A factory can have a three-phase LT supply, an HT connection, or more than one meter. Its roof area, machinery nameplates and GIDC address do not tell you which tariff is applied. The bill’s tariff code does. LTMD uses kW for billing demand in the cited DGVCL schedule. HTP-I, by contrast, uses kVA for an HT connection. An online calculator that treats 80 kW LTMD as 80 kVA HTP-I will use the wrong minimum, slabs and excess rate.
Start by collecting the latest bill, the previous 12 monthly bills and any interval-demand download. Write down the bill period, account number, tariff category, contracted demand or load, actual maximum demand and energy units. If the meter has time-of-day registers, copy each register rather than only the total kWh. Put annual shutdown, maintenance and peak-production months on the same sheet. That simple record is more useful than multiplying the largest bill by a generic solar-saving percentage.
| What you see on the LTMD bill | What it means for the review | Mistake to avoid |
|---|---|---|
| Tariff code LTMD | Use the LTMD schedule for this licensee and period | Assuming all low-tension businesses have the same rate |
| Contract demand in kW | Capacity agreed for the connection | Calling it monthly energy consumption |
| Maximum demand in kW | Highest qualifying recorded demand in the month | Using the connected-load sum as if it were metered demand |
| Billing demand in kW | Number on which demand charges are calculated | Ignoring the 85% contract floor |
| Imported kWh | Energy drawn from the grid | Using rupees paid as a substitute for units |
| Time-of-use registers | Which units fell in peak or discount hours | Valuing all units at one blended number |
The table is a reading aid, not a reproduction of DGVCL’s current invoice layout. When a field name differs, ask the licensee or your plant electrical team which meter register and tariff clause produced the line.
The demand charge: three numbers decide the billed kW
For DGVCL LTMD in FY 2026-27, billing demand is the highest of: actual maximum demand registered during the month; 85% of contract demand; or 6 kW. The demand charge is payable every month based on that billing demand. DGVCL Rate LTMD §§5.6–5.7. In other words, a low-production month may still be billed at the 85% floor. Turning machinery off for a week does not rewrite the contract figure.
The 2026-27 in-contract slabs are ₹90 per kW per month for the first 40 kW of billing demand, ₹130 for the next 20 kW and ₹195 for billing demand above 60 kW. Billing demand above the contract has a separate ₹265-per-kW rate. The within-contract and excess portions must be calculated separately. These numbers come from Rate LTMD §5.1; they are not interchangeable with another licensee or tariff category’s rates.
Suppose a small factory has 80 kW contract demand and a recorded 70 kW maximum demand in one month. The 85% floor is 68 kW, and the tariff minimum is 6 kW. The highest value is 70 kW, so that is the billing demand. The demand charge is 40 × ₹90 + 20 × ₹130 + 10 × ₹195 = ₹8,150. The figure is an illustrative demand-charge component, not a sample client bill and not the total amount due.
| Step for illustrative 80 kW contract | Calculation | Result |
|---|---|---|
| 85% floor | 80 kW × 0.85 | 68 kW |
| Billing demand | max(70 actual, 68 floor, 6 minimum) | 70 kW |
| First slab | 40 kW × ₹90 | ₹3,600 |
| Second slab | 20 kW × ₹130 | ₹2,600 |
| Third slab | 10 kW × ₹195 | ₹1,950 |
| Demand charge only | ₹3,600 + ₹2,600 + ₹1,950 | ₹8,150 |
Now suppose a later month reaches 90 kW maximum demand while the factory keeps the 80 kW contract. Billing demand becomes 90 kW. The first 80 kW, still within contract, costs ₹3,600 + ₹2,600 + ₹3,900 = ₹10,100. The 10 kW excess adds ₹2,650 at ₹265/kW. The demand-charge result is ₹12,750. This example shows why a motor or chiller overlap that creates a genuine high-demand interval can matter even when the month’s total kWh is ordinary. DGVCL Rate LTMD §5.1.
The opposite is also important. If the 80 kW contract stays in place but the recorded maximum falls to 50 kW, the billing demand is not 50 kW; the 85% floor of 68 kW wins. A solar system that lowers a sunny-day peak but leaves the contract unchanged may therefore produce no change in this component when the floor is binding. That does not mean the solar energy has no value. It means energy savings and demand charges are different calculations.
The energy charge: read imported units and payment type
The same DGVCL schedule lists an LTMD post-paid energy charge of 460 paise per unit and a pre-paid energy charge of 446 paise per unit for the entire monthly consumption. One unit means one kWh. Your bill or payment arrangement determines which applies; do not use the pre-paid number merely because the business pays early. DGVCL Rate LTMD §5.2.
For an illustrative 20,000 kWh imported under the post-paid LTMD rate, the base energy charge is 20,000 × ₹4.60 = ₹92,000. If the 70 kW demand example applies to the same period, adding its ₹8,150 demand charge gives ₹100,150 before time-of-use, reactive-energy and other bill items. It is not a complete bill. The point is to keep the 20,000 kWh energy line and 70 kW billing-demand line in separate units and separate boxes. A factory can change one without changing the other in the same proportion.
An LTMD customer with a solar plant will see lower grid import when the plant is producing and its power is consumed on site. A surplus may be exported under the applicable arrangement, but export settlement is a separate rule. Do not treat every generated kWh as a grid unit avoided at ₹4.60. Daytime self-consumption, imported energy and exported energy need separate lines in the project model. The current GERC 2026 distributed renewable energy regulations govern new installations within their scope and distinguish net metering, net billing and other arrangements.
Peak charges, midday concession and reactive energy
Under the cited LTMD schedule, imported energy during the two peak periods, 07:00–11:00 and 18:00–22:00, attracts an additional 45 paise per unit. The schedule also provides a 60 paise per unit concession for consumption from 11:00–17:00 for consumers with a meter having time-of-day recording facility or a smart meter. DGVCL Rate LTMD §§5.3 and 5.5. Check how those periods appear on your bill and whether the meter records them. An average monthly kWh total alone cannot reproduce a time-of-use line.
For example, of the illustrative 20,000 kWh, assume 4,000 kWh is recorded in the peak windows and 6,000 kWh is eligible for the midday concession. The peak addition is 4,000 × ₹0.45 = ₹1,800; the midday concession is 6,000 × ₹0.60 = ₹3,600. The net effect of these two lines in this simplified example is minus ₹1,800 against the base energy charge. It does not prove a factory will receive that discount. The actual time-of-day registers and tariff conditions decide.
The LTMD schedule also has a reactive-energy charge of 10 paise per kVARh for the month’s reactive units. DGVCL Rate LTMD §5.4. This is another measured quantity, not a percentage of the energy charge. A factory with motor loads and an APFC panel should compare the kVARh line before and after operational changes or solar commissioning. Do not assume the capacitor panel’s settings remain appropriate simply because the active-energy line falls.
| Illustrative LTMD bill component | Calculation | Amount |
|---|---|---|
| Demand charge | 70 kW billing demand in the prior example | ₹8,150 |
| Base post-paid energy charge | 20,000 kWh × ₹4.60 | ₹92,000 |
| Peak-period addition | 4,000 kWh × ₹0.45 | +₹1,800 |
| Midday concession | 6,000 kWh × ₹0.60 | −₹3,600 |
| Partial subtotal | Before reactive energy and other charges | ₹98,350 |
The subtotal is only a transparent teaching example. It omits the measured kVARh line, government levies, any fuel or power-purchase adjustment, arrears, security-deposit treatment and other account-specific items. The numbers were selected to show how the tariff works; they are not a quoted factory, a tariff forecast or a solar-return calculation.
Seasonal LTMD is a separate decision
The DGVCL schedule contains a seasonal consumer option for specific types of business, including listed operations such as ginning and pressing, rice mills and cold storage. It has a different annual-minimum mechanism and a defined off-season procedure. It is not a general rule that any small factory may turn its LTMD bill off for several months. A consumer seeking the seasonal treatment must meet the tariff’s eligibility and notice conditions. DGVCL Rate LTMD §5.8.
This matters for a solar proposal. A processing unit that shuts down for a long off-season may export more solar energy during those months. The owner needs to evaluate that export under the applicable metering rules and the seasonal tariff terms together. A simple annual-energy total can conceal the mismatch between when the roof generates and when the plant consumes. The seasonal exception is why the standard demand examples above should not be copied to every cold store or ginning unit without checking the account’s elected tariff treatment.
Where rooftop solar fits in an LTMD bill
The first solar question is not “How many panels fit?” It is “How much of our daytime grid import can the roof reasonably replace?” A small factory operating one shift may have good overlap around midday but little load after staff leave. A two-shift plant may have more daytime demand, but its highest maximum-demand interval could still occur at a start-up or in the evening. Look at a real load profile and the roof survey before selecting system size. The system’s AC capacity, grid-connection conditions and export route also matter.
Under GERC’s DRES Regulations, 2026, a non-residential net-metering consumer’s eligible export adjustment is limited to 30% of the electricity drawn from the licensee during the relevant billing period, subject to applicable banking charges; export beyond the permitted adjustment lapses under that provision. The same regulation says fixed or demand charges and government levies continue where applicable. A solar quotation that treats all generated units as equal to purchased units at the retail rate can therefore overstate its effect. This statement applies to new systems within the 2026 regulation’s scope; an existing plant’s agreement and commissioning date need separate review. GERC 2026, Regulations 4.1 and 9.1.5–9.1.9.
Solar also does not change an 80 kW contract demand merely by being installed. If a buyer wants to consider lowering the contracted figure after observing new load data, the highest non-solar months, production plans, tariff floor and utility process all need review. A lower contract can create an excess-demand charge in a peak month. If a proposed solar capacity exceeds contract demand for a consumer above the relevant threshold, the 2026 renewable-energy rule can add a battery condition. That is another reason to keep a contract-demand change separate from the EPC sales case. GERC 2026, Regulation 4.9.
A practical LTMD review before asking for a solar quote
- Read the licensee and tariff code. If the bill is not DGVCL LTMD, use the correct current order.
- Copy twelve months of kWh, maximum demand and demand charges. Mark the 85% floor in months where it dominates.
- Keep units straight. LTMD demand is in kW in the cited schedule; energy is in kWh and reactive energy in kVARh. Do not mix those into one number.
- Collect time-of-day readings. Midday consumption and peak-period consumption have different adjustments in the cited year.
- Explain seasonal months. Check whether a formal seasonal option applies before treating the off-season as zero-load months.
- Map the roof and plant hours. A shaded or repair-prone shed, a landlord’s roof, and a shutdown constraint all affect what can be built.
- Name the export route. Ask for direct consumption and export shown separately with the applicable GERC and DISCOM rules.
- Itemise the proposal. It should distinguish energy savings assumptions, continuing demand charges, approvals, metering and any unpriced utility estimate.
For the general factory project route, see industrial rooftop solar. The proposed small-factory service page will add roof and load details for LT connections when it is live; this article keeps its focus on the tariff and bill, not a duplicate service pitch.
If you are collecting bills for a smaller plant, the MSME factory solar page shows which operating and roof records to prepare for a proposal.
Heaven Green Energy can use your bills, operating hours and roof details to frame a load-based proposal for a small factory. Share the latest bill and the previous months privately through the business enquiry form, or send the site details on WhatsApp. Ask the proposal to show exactly which LTMD lines are expected to change and which continue. Get a load-based proposal for my plant is the next step after the bill is understood, not a substitute for understanding it.