Gujarat is the best state in India to go solar under PM Suryaghar — and it is not particularly close. The four Gujarat DISCOMs (UGVCL, DGVCL, PGVCL, MGVCL) have the fastest processing timelines in the country, Gujarat gets 5.0–5.5 kWh/m²/day of solar irradiation (among the highest in India), and the state operates the supplementary SURYA Gujarat portal that further streamlines approvals. The central subsidy of up to ₹78,000 applies identically here as everywhere else, but the execution in Gujarat is simply faster.
This guide covers PM Suryaghar specifically for Gujarat — DISCOM selection, the exact application process for each DISCOM, the Gujarat-specific SURYA portal, and the typical timelines you can expect.
Direct answer. In Gujarat, PM Suryaghar applications go through your local DISCOM — UGVCL for North Gujarat including Ahmedabad, DGVCL for South Gujarat including Surat, PGVCL for Saurashtra and Kutch, and MGVCL for Central Gujarat. Central subsidy is ₹78,000 maximum. Gujarat’s average end-to-end timeline from application to subsidy in bank is 60–75 days — the fastest in India for MNRE schemes.
Gujarat’s Four DISCOMs — Which One Are You Under?
Gujarat has one of India’s most organised DISCOM structures. Gujarat Urja Vikas Nigam Limited (GUVNL) is the holding company; four subsidiary DISCOMs handle consumer connections by geography.
| DISCOM | Full name | Coverage area |
|---|---|---|
| UGVCL | Uttar Gujarat Vij Company Limited | Ahmedabad, Gandhinagar, Mehsana, Patan, Banaskantha, Sabarkantha, Aravalli |
| DGVCL | Dakshin Gujarat Vij Company Limited | Surat, Bharuch, Tapi, Navsari, Valsad, Narmada, Dang |
| PGVCL | Paschim Gujarat Vij Company Limited | Rajkot, Jamnagar, Junagadh, Porbandar, Amreli, Bhavnagar, Morbi, Kutch, Surendranagar, Gir Somnath |
| MGVCL | Madhya Gujarat Vij Company Limited | Vadodara, Anand, Kheda, Panchmahal, Dahod, Mahisagar |
Not sure which DISCOM serves your area? Your electricity bill shows the DISCOM name and logo at the top. Alternatively, enter your consumer number at pmsuryaghar.gov.in — the portal auto-identifies your DISCOM.
💡 Fast tip
Heaven Green Energy is empanelled under all four Gujarat DISCOMs. If you are in Ahmedabad, Surat, Rajkot, Vadodara, or anywhere in Gujarat, you can use a single installer for the entire subsidy process — no need to find separate vendors for different DISCOMs.
PM Suryaghar Subsidy in Gujarat — What You Receive
The central government subsidy is the same everywhere. Gujarat does not currently stack an additional state subsidy on top for standard residential consumers (as of June 2026), but check your DISCOM portal for any active state scheme notifications.
The SURYA Gujarat scheme: Gujarat also operates the SURYA (Sustainable, Urban, Rural Youth & Agriculture) rooftop solar scheme through suryagujarat.guvnl.com. This is the state-level portal that integrates with PM Suryaghar. For consumers in Gujarat, the SURYA portal provides an additional progress-tracking interface — but the subsidy and inspection process still flows through the national portal.
Step-by-Step PM Suryaghar Application in Gujarat
The process is the same across all four Gujarat DISCOMs — the national portal (pmsuryaghar.gov.in) is the single entry point.
-
Register on the national portal — enter your DISCOM (select UGVCL/DGVCL/PGVCL/MGVCL), consumer number, and Aadhaar-linked mobile number. Complete OTP verification.
-
Check the empanelled vendor list — the portal shows active empanelled installers for your specific DISCOM. In Gujarat, there are typically 200–400 empanelled vendors per DISCOM. Filter by city for convenience.
-
Submit application with documents — upload Aadhaar, latest electricity bill, property ownership proof, and bank account details. The name on Aadhaar must match the name on the electricity bill exactly.
-
Receive DISCOM feasibility approval — the DISCOM checks your sanctioned load, pending dues, and technical feasibility of connecting solar to your transformer. In Gujarat, this takes 7–15 working days — faster than the national average.
-
Installation begins — your empanelled vendor installs the system after feasibility approval. A standard 3 kW residential system in Gujarat takes 2–3 days to install.
-
Submit commissioning report — your vendor uploads the commissioning report with site photographs and equipment serial numbers to the portal.
-
DISCOM physical inspection — the DISCOM inspector visits to verify installation quality, panel specifications, and net meter connectivity. In Gujarat, this is scheduled within 5–10 working days of commissioning report submission.
-
Net meter installation and subsidy DBT — after inspection approval, a bidirectional net meter replaces or supplements your existing meter. Subsidy DBT reaches your Aadhaar-linked bank account in 30–45 days.
Gujarat PM Suryaghar Timeline (Realistic)
Based on Heaven Green Energy’s installations across UGVCL, DGVCL, PGVCL, and MGVCL in 2025–26:
| Stage | UGVCL (Ahmedabad) | DGVCL (Surat) | PGVCL (Rajkot) | MGVCL (Vadodara) |
|---|---|---|---|---|
| Registration to feasibility | 8–12 days | 7–10 days | 10–15 days | 10–14 days |
| Installation | 2–4 days | 2–3 days | 2–4 days | 2–4 days |
| Commissioning to inspection | 6–8 days | 5–8 days | 7–12 days | 7–10 days |
| Inspection to net meter | 5–10 days | 5–8 days | 8–14 days | 7–12 days |
| Net meter to DBT | 30–45 days | 30–40 days | 30–45 days | 30–45 days |
| Total (typical) | 55–75 days | 50–65 days | 60–85 days | 58–80 days |
DGVCL (Surat) has been among the fastest DISCOMs in India for the last two years. PGVCL (Saurashtra/Kutch) covers a large geographic area so inspector travel times can extend the inspection stage.
Gujarat-Specific Documents Checklist
| Document | Purpose | Note |
|---|---|---|
| Aadhaar card | Identity + DBT | Name must match bill exactly |
| Latest electricity bill (UGVCL/DGVCL/PGVCL/MGVCL) | Consumer number + category | ”Domestic” or “LT-1” category required |
| Property documents | Ownership proof | Sale deed, index-2, or property tax receipt |
| Bank passbook/cancelled cheque | DBT account details | Must be Aadhaar-seeded |
| Passport photo | Portal registration | Standard size |
| Mobile number | OTP | Must be registered with your DISCOM |
The PM Suryaghar Document Checklist PDF has a printable version with DISCOM-specific notes for all four Gujarat DISCOMs.
Solar System Size Recommendations for Gujarat
Gujarat’s 5.0–5.5 peak sun hours per day means your system generates more per kW than most of India. Use the sizing formula: kW = monthly consumption (kWh) ÷ 150 for Gujarat (higher than the national average because of better irradiation).
| Monthly bill (Gujarat tariff) | Approx consumption | Recommended size | Expected generation |
|---|---|---|---|
| ₹500–₹1,500 | 50–150 kWh | 1 kW | 150 kWh/month |
| ₹1,500–₹3,000 | 150–300 kWh | 2–2.5 kW | 300–375 kWh/month |
| ₹3,000–₹5,000 | 300–500 kWh | 3 kW | 450 kWh/month |
| ₹5,000–₹8,000 | 500–800 kWh | 4–5 kW | 600–750 kWh/month |
| ₹8,000+ | 800+ kWh | 5–10 kW | 750–1,500 kWh/month |
Most Gujarat households get a 3 kW system (maximum central subsidy at ₹78,000) unless consumption justifies larger capacity.
Net Metering in Gujarat — How Surplus Solar Is Handled
Gujarat has a well-established net metering framework under the Gujarat Electricity Regulatory Commission (GERC). Under net metering:
- Surplus units exported to the grid are credited to your account.
- Your electricity bill charges only the net consumption (units consumed minus units exported).
- Excess credits can be carried forward monthly and adjusted against future bills.
- At year end, if your exported units exceed imported units, the DISCOM pays you for the surplus at the prevailing feed-in tariff.
For a full explanation of how net metering works in practice, see Net Metering in India Explained.
💰 Real numbers
A 3 kW system in Ahmedabad generates roughly 450 kWh per month. An average LT-Domestic consumer in UGVCL uses 300–400 kWh per month. This means approximately 50–150 kWh of net exports per month, which reduces your bill to near zero or generates a small credit balance.
Why Gujarat Leads India in Rooftop Solar
Gujarat’s rooftop solar penetration is among the highest in India for several reasons:
- Highest solar irradiation in India
- Fastest DISCOM processing times
- SURYA Gujarat portal integration
- Strong net metering framework (GERC)
- Large empanelled vendor base
- Fly-by-night installers, especially post-summer demand surge
- Non-ALMM panels substituted by local dealers
- PGVCL rural areas can have longer inspection queues
- High summer temperatures — mounting structure quality matters
How Heaven Green Energy Helps Gujarat Customers
Heaven Green Energy is headquartered in Gujarat and has completed over 10,000 installations across the state. We are empanelled under all four Gujarat DISCOMs.
- Residential Solar — complete PM Suryaghar handling from document audit to subsidy disbursement.
- Rooftop Solar in Gujarat — our full Gujarat solar market guide.
- Solar Permits Gujarat — permits and approval requirements explained.
- Contact us — speak with a Gujarat-based solar engineer.
Get a free site visit. Our Gujarat team visits your site within 24 hours and sends a custom proposal with exact subsidy calculation in 48 hours. Get your free quote →
Frequently Asked Questions
Which DISCOM do I use for PM Suryaghar in Ahmedabad?
Ahmedabad falls under UGVCL (Uttar Gujarat Vij Company Limited). When registering on pmsuryaghar.gov.in, select Gujarat as state and UGVCL as DISCOM. Your electricity bill will also confirm this — UGVCL logo appears on bills for Ahmedabad consumers.
Is there additional state subsidy for solar in Gujarat?
As of June 2026, Gujarat does not stack a universal additional state subsidy on top of the central ₹78,000 for standard residential PM Suryaghar applications. The SURYA Gujarat scheme is an administrative integration, not a separate financial benefit. Check your DISCOM portal for any active seasonal or pilot programmes.
How many empanelled vendors are available in Gujarat for PM Suryaghar?
As of mid-2026, each Gujarat DISCOM has 200–500+ empanelled vendors. You can view and filter the list on pmsuryaghar.gov.in. Always verify current empanelment status before engaging a vendor.
Can I install more than 10 kW under PM Suryaghar in Gujarat?
The PM Suryaghar central subsidy caps at ₹78,000 for 3 kW and above. You can install up to 10 kW (or your sanctioned load, whichever is lower) under the scheme. Systems above 10 kW require separate DISCOM approvals and fall under different net metering tiers.
How does SURYA Gujarat relate to PM Suryaghar?
SURYA Gujarat (suryagujarat.guvnl.com) is the Gujarat state-level portal that provides supplementary tracking and DISCOM coordination for rooftop solar applications. It integrates with the national PM Suryaghar portal. For Gujarat consumers, monitoring your application on SURYA Gujarat in addition to the national portal can give more granular status updates.
What is the electricity tariff in Gujarat for residential consumers in 2026?
Gujarat residential tariffs vary by DISCOM and slab but are typically ₹4.50–₹6.00 per kWh for LT-Domestic consumers in the 200–500 kWh/month range. Contact your DISCOM for the current tariff schedule or check the GERC website for the latest tariff order.