PM Surya Ghar Gujarat: UGVCL, DGVCL, PGVCL & MGVCL Guide

PM Surya Ghar in Gujarat, subsidy amounts, DISCOM-wise process for UGVCL, DGVCL, PGVCL, MGVCL, timeline, and how to apply. Updated June 2026.

PM Surya Ghar Gujarat: UGVCL, DGVCL, PGVCL & MGVCL Guide

Gujarat is one of the best states in India to go solar under PM Suryaghar. In our experience the four state DISCOMs (UGVCL, DGVCL, PGVCL, MGVCL) process applications quickly, Gujarat gets 5.0 to 5.5 kWh/m²/day of solar irradiation (among the highest in India), and GERC’s net-metering rules allow residential rooftop systems irrespective of sanctioned load. The central subsidy of up to ₹78,000 applies identically here as everywhere else, but the execution in Gujarat is simply faster.

This guide covers PM Suryaghar specifically for Gujarat, DISCOM selection, the exact application process for each DISCOM, where the SURYA Gujarat portal fits, and the typical timelines you can expect.

Direct answer. In Gujarat, PM Suryaghar applications go through your local DISCOM: UGVCL for North Gujarat (including the outskirts of Ahmedabad), DGVCL for South Gujarat including Surat, PGVCL for Saurashtra and Kutch, and MGVCL for Central Gujarat. Ahmedabad city, Gandhinagar city and parts of Surat city are served by the private licensee Torrent Power. Central subsidy is ₹78,000 maximum. In our installations, the end-to-end timeline from application to subsidy in bank is typically 60 to 75 days under the MNRE scheme.

Gujarat’s Four DISCOMs, Which One Are You Under?

Gujarat has one of India’s most organised DISCOM structures. Gujarat Urja Vikas Nigam Limited (GUVNL) is the holding company; four subsidiary DISCOMs handle consumer connections by geography, and the private licensee Torrent Power serves Ahmedabad city, Gandhinagar city and parts of Surat city.

Gujarat DISCOMs and the areas they serve
DISCOMFull nameCoverage area
UGVCLUttar Gujarat Vij Company LimitedAhmedabad and Gandhinagar districts outside Torrent Power’s city areas (for example Chandkheda, Motera, Sanand, Bavla, Dholka), Mehsana, Patan, Banaskantha, Sabarkantha, Aravalli
DGVCLDakshin Gujarat Vij Company LimitedSurat, Bharuch, Tapi, Navsari, Valsad, Narmada, Dang
PGVCLPaschim Gujarat Vij Company LimitedRajkot, Jamnagar, Junagadh, Porbandar, Amreli, Bhavnagar, Morbi, Kutch, Surendranagar, Gir Somnath
MGVCLMadhya Gujarat Vij Company LimitedVadodara, Anand, Kheda, Panchmahal, Dahod, Mahisagar
Torrent PowerTorrent Power Limited (private licensee)Ahmedabad city, Gandhinagar city, parts of Surat city

Not sure which DISCOM serves your area? Your electricity bill shows the DISCOM name and logo at the top. Alternatively, enter your consumer number at pmsuryaghar.gov.in, the portal auto-identifies your DISCOM.

💡 Fast tip

Heaven Green Energy is empanelled under all four Gujarat DISCOMs. If you are in Ahmedabad, Surat, Rajkot, Vadodara, or anywhere in Gujarat, you can use a single installer for the entire subsidy process, no need to find separate vendors for different DISCOMs.

PM Suryaghar Subsidy in Gujarat, What You Receive

The central government subsidy is the same everywhere. Gujarat does not currently stack an additional state subsidy on top for standard residential consumers (as of June 2026), but check your DISCOM portal for any active state scheme notifications.

₹30,000
1 kW system
Central subsidy, MNRE 2026
₹60,000
2 kW system
Central subsidy, MNRE 2026
₹78,000
3 kW and above
Maximum cap, MNRE 2026

The SURYA Gujarat portal: GUVNL’s SURYA Gujarat site (suryagujarat.guvnl.in) is the single-window rooftop portal used for the state’s earlier, tender-based residential rooftop programme; its latest notice announced an application window that closed on 8 December 2023. PM Suryaghar applications, inspections and the subsidy all run through the national portal.

Step-by-Step PM Suryaghar Application in Gujarat

The process is the same across all four Gujarat DISCOMs, the national portal (pmsuryaghar.gov.in) is the single entry point.

Gujarat PM Suryaghar Timeline (Realistic)

Based on Heaven Green Energy’s installations across UGVCL, DGVCL, PGVCL, and MGVCL in 2025 to 26:

StageUGVCL (north Gujarat)DGVCL (south Gujarat)PGVCL (Saurashtra, Kutch)MGVCL (central Gujarat)
Registration to feasibility8 to 12 days7 to 10 days10 to 15 days10 to 14 days
Installation2 to 4 days2 to 3 days2 to 4 days2 to 4 days
Commissioning to inspection6 to 8 days5 to 8 days7 to 12 days7 to 10 days
Inspection to net meter5 to 10 days5 to 8 days8 to 14 days7 to 12 days
Net meter to subsidy in bank (observed)30 to 45 days30 to 40 days30 to 45 days30 to 45 days
Total (typical)55 to 75 days50 to 65 days60 to 85 days58 to 80 days

MNRE’s guidelines require the subsidy to be processed within 15 days of DISCOM approval on the portal, released when you redeem the e-token; the table shows what our customers have actually seen from net meter installation to money in the bank. DGVCL (Surat) has been the fastest of the four in our installations. PGVCL (Saurashtra/Kutch) covers a large geographic area so inspector travel times can extend the inspection stage. UGVCL (north Gujarat) and MGVCL (Vadodara) each have their own dedicated process guides.

Gujarat-Specific Documents Checklist

Documents for a Gujarat PM Suryaghar application
DocumentPurposeNote
Aadhaar cardIdentity + DBTName must match bill exactly
Latest electricity bill (UGVCL/DGVCL/PGVCL/MGVCL/Torrent Power)Consumer number + categoryResidential category required (RGP or RGP Rural on GUVNL bills)
Property documentsOwnership proofSale deed, index-2, or property tax receipt
Bank passbook/cancelled chequeDBT account detailsMust be in the applicant’s name
Passport photoPortal registrationStandard size
Mobile numberOTPUsed for portal OTP verification

The PM Suryaghar Document Checklist PDF has a printable version with DISCOM-specific notes for all four Gujarat DISCOMs.

Solar System Size Recommendations for Gujarat

Gujarat’s 5.0 to 5.5 peak sun hours per day means your system generates more per kW than most of India. Use the sizing formula: kW = monthly consumption (kWh) ÷ 120 for Gujarat: at 5.0 to 5.5 peak sun hours, each kW yields roughly 120 kWh a month after system losses (higher than the national average because of better irradiation).

Monthly bill (Gujarat tariff)Approx consumptionRecommended sizeExpected generation
₹500–₹1,50050 to 150 kWh1 kWabout 120 kWh/month
₹1,500–₹3,000150 to 300 kWh2 to 2.5 kW240 to 300 kWh/month
₹3,000–₹5,000300 to 500 kWh3 kWabout 360 kWh/month
₹5,000–₹8,000500 to 800 kWh4 to 5 kW480 to 600 kWh/month
₹8,000+800+ kWh5 to 10 kW600 to 1,200 kWh/month

Most Gujarat households get a 3 kW system (maximum central subsidy at ₹78,000) unless consumption justifies larger capacity.

Net Metering in Gujarat, How Surplus Solar Is Handled

Gujarat has a well-established net metering framework under the Gujarat Electricity Regulatory Commission (GERC). Under net metering, see this UGVCL net metering guide for the shared GERC technical process:

  • Surplus units exported to the grid are set off against the units you import.
  • For residential consumers, the set-off is done within each billing cycle, and your bill charges only the net consumption.
  • If you export more than you import in a billing cycle, the DISCOM buys the surplus at ₹2.25 per unit for the first 5 years from commissioning (then at 75% of the average GUVNL solar bid tariff of the preceding six months), a fixed feed-in tariff for your surplus.
  • Surplus is paid for, not carried forward to later bills (GERC Net Metering Regulations, Third Amendment 2022).

For a full explanation of how net metering works in practice, see Net Metering in India Explained.

💰 Real numbers

A 3 kW system in Ahmedabad generates roughly 360 kWh per month averaged over the year. A household using 300 to 400 kWh per month will see its bill fall close to the fixed charges in most months; any surplus left after set-off in a billing cycle is bought by the DISCOM at ₹2.25 per unit.

Why Gujarat Leads India in Rooftop Solar

Gujarat’s rooftop solar penetration is among the highest in India for several reasons:

Why Gujarat works well
  • Among the highest solar irradiation in India
  • Quick DISCOM processing in our experience
  • Residential systems allowed irrespective of sanctioned load
  • Strong net metering framework (GERC)
  • Large base of portal-registered vendors
Watch out for
  • Fly-by-night installers, especially post-summer demand surge
  • Non-DCR or non-ALMM panels substituted by local dealers (no subsidy)
  • PGVCL rural areas can have longer inspection queues
  • High summer temperatures, mounting structure quality matters

How Heaven Green Energy Helps Gujarat Customers

Heaven Green Energy is headquartered in Surat, Gujarat, and has completed 10,000+ installations. We are empanelled under all four Gujarat DISCOMs.

Get a free site visit. A solar advisor responds within 2 hours on business days, and our Gujarat team visits your site and sends a custom proposal with the exact subsidy calculation. Get your free quote →

Frequently Asked Questions

Which DISCOM do I use for PM Suryaghar in Ahmedabad?

Most of Ahmedabad city is served by Torrent Power, not UGVCL. Areas on the outskirts and in the rest of Ahmedabad district (for example Chandkheda, Motera, Sanand, Bavla and Dholka) are served by UGVCL (Uttar Gujarat Vij Company Limited). Check the name on your electricity bill, then select Gujarat as state and that DISCOM when registering on pmsuryaghar.gov.in.

Is there additional state subsidy for solar in Gujarat?

As of June 2026, Gujarat does not stack a universal additional state subsidy on top of the central ₹78,000 for standard residential PM Suryaghar applications. SURYA Gujarat was the state’s earlier, tender-based rooftop programme and does not add a subsidy to PM Suryaghar. Check your DISCOM portal for any active seasonal or pilot programmes.

How many registered vendors are available in Gujarat for PM Suryaghar?

Gujarat has a large pool of vendors registered on the PM Suryaghar national portal. You can view, filter and compare them, with their portal ratings, on pmsuryaghar.gov.in. Always verify the vendor’s current registration before engaging them.

Can I install more than 10 kW under PM Suryaghar in Gujarat?

Yes. The PM Suryaghar central subsidy caps at ₹78,000, reached at 3 kW, but you can install a larger system: GERC allows residential rooftop systems irrespective of sanctioned load, within the limits for your supply connection. Systems up to 10 kW are deemed technically feasible without a study; above 10 kW the DISCOM must complete a feasibility study, within 15 days under the Electricity (Rights of Consumers) Rules as amended in 2024.

How does SURYA Gujarat relate to PM Suryaghar?

SURYA Gujarat (suryagujarat.guvnl.in) is GUVNL’s single-window portal for the state’s earlier, tender-based residential rooftop programme; its latest notice announced an application window that closed on 8 December 2023. PM Suryaghar applications, inspections and subsidy tracking all run through the national portal, pmsuryaghar.gov.in.

What is the electricity tariff in Gujarat for residential consumers in 2026?

For the four GUVNL DISCOMs, GERC’s FY 2026-27 residential (RGP) energy charge is ₹3.05 per unit for the first 50 units, ₹3.50 for the next 50, ₹4.15 for the next 150 and ₹5.20 above 250 units, plus a small fixed charge, the fuel and power purchase price adjustment surcharge (FPPAS) and electricity duty, so the effective rate is higher. Torrent Power areas have their own tariff. Check the GERC website for the latest tariff order.

Written by
Keyur Rakholiya

Co-Founder of Heaven Green Energy. Oversees engineering, product, and the Qbits inverter line — from cell-to-module design to on-site commissioning of MW-scale plants.