Power Cost in Yarn Texturising Units, and Where Solar Fits

Texturising unit power consumption depends on the machine, yarn specification, operating speed, heater configuration, utilisation and support systems.

Texturising unit power consumption depends on the machine, yarn specification, operating speed, heater configuration, utilisation and support systems. A single “units per kilogram” number cannot describe every Surat plant. The useful starting figure is your own net electricity used per kilogram of acceptable finished yarn, checked against shifts and machine-level loads. Rooftop solar can supply part of the daytime electrical demand, but it does not directly cover night production or replace a heat source that is not electrical.

If you are planning a plant proposal, get a load-based proposal for my plant through this article’s business enquiry form or share your bills with the industrial solar team. Bring the unit’s shift schedule and utility bill to that discussion. You can also send the bills on WhatsApp.

Start with a meter boundary, not a machine brochure

The phrase “power cost per kg of yarn” can mean at least three things. It may mean the texturing machine’s electrical consumption divided by machine output. It may mean the entire unit’s grid electricity divided by finished saleable yarn. Or it may mean the full electricity bill, including demand charges and other items, divided by kilograms dispatched. These quantities answer different management questions. The first helps compare a machine or process change. The second reveals how factory-wide electrical use moves with throughput. The third shows the actual bill burden, but can shift even when machine efficiency is unchanged.

Choose the boundary before calculating. For a factory-wide measure, record imported electricity, on-site generation used inside the plant, any generator contribution and the reporting period. If solar is installed, grid import alone is no longer total electrical consumption. If a diesel generator runs during an outage, its energy should be included for a process-energy calculation, while its fuel cost belongs in a separate cost line. Then count saleable output over the same dates. Rejects, rework and inventory timing can distort a per-kg value if the production denominator is taken from another period.

The Bureau of Energy Efficiency’s textile monitoring and verification guidance uses production-normalised specific energy consumption and requires transparent conversion between textile products. That principle matters here: a change from one yarn specification to another can change energy per kilogram even if operators do nothing wrong. An energy target should be set for a comparable product mix and process boundary, not copied from a spinning mill or a wet-processing house.

Where electricity goes inside a texturising unit

Draw-texturing equipment is more than one motor. Feed and delivery systems move filament through the machine, heaters apply process heat where the model uses electrical heating, cooling and friction/twist units shape the yarn, and winders build packages. The plant also has compressed air, ventilation, lighting, control panels, transformers and sometimes cooling equipment. These support loads may run even when some texturing positions are idle.

The Oerlikon Barmag DTY machine material shows how heater, cooling, friction and drive configurations vary by product and machine option. It is an OEM description, not a measure of a local factory’s consumption. It helps explain why a nameplate or installed kW total does not equal actual hourly demand. A heater’s draw can depend on process temperature, operating speed, insulation condition and warm-up state; drive loads vary with speed and machine utilisation. The specific machine manual and a measured load record should settle the plant’s actual values.

TFO twisting units have a different process and should not be merged blindly into a DTY benchmark. If a business operates both, separate their submetering or operating hours before comparing energy per kilogram. The BEE reporting method distinguishes textile sub-processes precisely because the same kilogram of yarn can pass through different energy steps. A unit with a large rewinding or air-compressor load may have a different whole-factory result from a similar machine room with centralized utilities outside the metered boundary.

Load or processWhy it matters to the billData to request
Texturing machine drives and friction unitsElectrical demand follows production mode and speedModel, rated powers, measured operating kW, shift log
Electrical heatersMay be a significant process load where fittedHeater specification, setpoints, measured duty cycle
Winders and package handlingCan remain active while main process changesConnected power and running hours
Compressors and coolingShared utility use can inflate factory SECCompressor log, pressure, submeter or temporary measurement
Ventilation and lightingBackground load may persist between shiftsSchedule and submeter data
Transformer and distribution lossesIncrease site import relative to machine terminalsMeter boundary and electrical diagram

This is a measurement plan, not a ranked table of “largest consumers.” Which load dominates can be established only on site. The table tells an owner where to attach a logger or collect operator records before debating solar size.

Calculate your own units per kilogram

For a defined period, calculate specific electrical consumption as total electricity used inside the chosen boundary in kWh divided by kilograms of acceptable yarn produced inside the same boundary. If the unit has only a grid meter and no on-site generation, its imported kWh may be a workable first numerator. If rooftop solar is present, add self-consumed PV output to imports to estimate total plant use; do not add exported solar as though the machines consumed it. If generator energy is material, include it in the energy numerator and disclose it separately.

Consider a deliberately illustrative month with 18,000 kWh of metered plant electricity and 12,000 kg of accepted yarn output. The arithmetic gives 18,000 ÷ 12,000 = 1.5 kWh/kg. That is not an industry benchmark or a claim about Heaven Green clients. If 2,000 kg were still in work-in-progress and excluded from output while their processing electricity was included, the apparent SEC would rise. If the plant changed denier, speed or product mix, comparing the number with another month without normalisation would be weak analysis.

Now consider cost. A simple kWh × energy rate estimate can be useful for a narrow energy-charge comparison, but the bill can also contain demand, time-of-use, power-factor, duty, taxes and other amounts. For a production-cost figure, divide the appropriate total electricity cost by the same saleable kilograms and list the bill components included. The GERC tariff schedule shows separate current schedules for DGVCL and Torrent Power as well as different categories. Check your connection’s actual tariff before using a rupee figure in a production model.

MeasureFormulaUseCommon mistake
Machine electrical SECMachine kWh ÷ accepted kg from that machineCompare process settings or machine conditionDividing by total factory output
Site electrical SECGrid import + self-used solar + generator kWh, divided by site accepted kgTrack whole-unit efficiencyTreating grid import after solar as total process energy
Electricity cost per kgIncluded bill/fuel electricity cost ÷ accepted kgProduct costingMixing periods or omitting demand charges
Daytime load available for solarMetered grid import by daylight interval, adjusted for process and future changesPreliminary PV sizingUsing monthly kWh ÷ hours as every-hour demand

The formula table should be accompanied by the boundary and reporting dates whenever it is used. It is better to show a qualified number than a precise-looking but incomparable one.

Why the shift pattern matters more to solar than the monthly total

Solar production follows daylight and weather. A texturising unit that runs around the clock may have a stable daytime load and also a large night-time load. Grid-connected rooftop solar can serve the former directly while available. It does not deliver ordinary PV energy through the night without an approved storage or other arrangement. A 24-hour operating schedule may make the plant attractive for self-consumption, but the percentage of total annual consumption offset cannot be inferred from “runs 24/7” alone.

Build an interval load curve from the actual meter if available. Plot import in kW or kVA at the interval used by the utility, with separate weekday, Sunday and shutdown views. Add the expected PV generation curve from a dated model using local weather, roof orientation, shade, system losses and chosen equipment. Then compare each period. If PV output is below load, the plant can usually consume it on site, subject to electrical and regulatory design. If PV output exceeds load, the current Gujarat arrangement determines whether export is possible or whether output must be curtailed. The GERC 2026 distributed-renewable regulation is the current starting point for a new grid-connected project, not an old 2016-rule blog.

This interval method also exposes the difference between energy and demand. Solar may reduce daytime imported kWh while a short night peak still determines maximum demand. A monthly bill alone can show the energy trend but rarely reveals the precise time of the demand peak. An accurate proposal should state what it assumes about those intervals and avoid converting annual solar kWh into an automatic demand-charge saving.

A shift-based example without a fabricated payoff

Picture a unit with three operating periods: a full production day shift, a reduced Sunday shift and a planned maintenance shutdown. On the full day, machines may draw steadily while PV output rises and falls. On Sunday, fewer active positions may leave some available PV unused or exported, depending on the approved arrangement. During maintenance, the only loads may be ventilation, lighting and selected utilities. One annual PV production number could conceal all three different self-consumption outcomes.

For a preliminary analysis, create a table of representative intervals. Record actual import, running machine positions, compressor status, production quantity and the reason for unusual events. Put the proposed PV output in a separate column. Calculate potential on-site use as the smaller of load and available PV only as an initial energy-balance screen; actual inverter control, losses, meter position and grid rules need engineering review. The unserved portion of the load remains grid import; the unused PV becomes export or curtailed output only under the chosen connection design.

No hypothetical rupee saving belongs in this example. We lack a plant-specific interval record, tariff, roof layout, generation model, equipment quote and tax assumptions. A generic “solar covers X%” statement would be more memorable than useful, especially for a unit with product-mix changes. The right output of the first meeting is a list of measurements needed for an honest model.

How to separate an efficiency project from a solar project

If an older machine or utility is wasting electricity, lowering that demand may be a good operational project. Solar does not make the waste disappear; it changes which source supplies some of the energy. Conversely, a genuine machine-efficiency improvement changes the load curve and can change the optimal PV size. Plan both together so that a solar proposal does not oversize the plant against an obsolete consumption baseline.

For example, evaluate the compressed-air system before assuming every compressor kWh will continue for years. Review leaks, pressure setpoints, idle running and whether multiple machines share the same compressor. Use actual measurements and approved equipment changes, not a generic percentage-saving table. For a texturing machine, heater and drive options are model-specific. The Oerlikon Barmag machine description points to heater and drive design as energy-relevant variables, but does not establish what a retrofit would save in a Surat unit.

The Bureau of Energy Efficiency’s Surat textile cluster manual documents process and utility audit methods for textile units. Its wet-processing equipment examples must not be transplanted as texturising-machine benchmarks. The transferable lesson is to measure equipment and production together, then evaluate a specific change against a baseline. Keep separate business cases for machine efficiency and solar, and recompute the PV case if the efficiency measure is likely to be installed first.

Tariff and power-factor issues can hide inside “power cost”

An owner may see the monthly amount rise even while kWh per kilogram stays flat. Demand charges, time-of-use terms, power-factor adjustment, fuel cost or a tariff change can explain part of the movement. Likewise, a production slowdown can raise electricity cost per kilogram because fixed demand-related charges are spread over fewer saleable kilograms. A solar proposal should identify which bill lines it is expected to affect and which it is not. It should use the current tariff for the actual licensee and category.

Do not average the whole bill into one ₹/kWh value and assume every solar unit avoids that amount. The marginal value of self-consumed solar depends on time, tariff structure and connection arrangement. Some charges may remain even if grid import falls. The GERC tariff register provides the official licensee schedules; the actual bill and connection documents identify which one applies. A site-specific financial model should show its source date and isolate energy charges, demand charges and taxes rather than displaying only a headline payback period.

The same care applies to capacity. A roof may fit an array whose midday generation exceeds the unit’s lowest daytime load. The no-export alternative may curtail it; an approved export arrangement may value surplus differently. Gujarat’s 2026 Statement of Reasons says a grid-connected system does not avoid DISCOM approval simply because its design intends no injection. This is one reason to decide the metering and control route before finalising PV capacity.

The roof and production schedule are part of the power model

Texturising plants may operate below metal sheds, RCC roofs or mixed buildings. The available solar area is not gross roof area. Skylights, ventilation, gutters, plant maintenance routes, shade and structural limits all reduce it. A structural engineer needs the actual load path, roof condition and wind assumptions before the array is accepted. The process schedule matters because access and electrical tie-in work may have to be planned around production. No proposal should promise uninterrupted production from an unseen site.

The CEA electrical-safety regulation register lists the 2023 base regulation and a 2026 amendment; a designer should check the requirements in force on the project date. Roof access, safe isolation and anti-islanding require a site-specific engineering and approval review.

For a proposal, ask the EPC to put the energy model and roof assessment together. If a structurally sound roof zone is smaller than the modelled ideal array, the economics need to be recalculated. If the plant runs mostly at night, a larger roof does not create a larger daytime load. This is why a load-based proposal should be built from bills, interval data and roof drawings, rather than from a single “available square feet” estimate.

What to give an EPC before asking for a number

Provide a year of electricity bills, the tariff category and account connection details, any downloadable interval data, machine list, number of running positions by shift, production by product type, compressor and major utility details, planned equipment changes, roof drawings and roof-repair history. If data are missing, say so. A responsible EPC can state what remains provisional. An invented baseline is more dangerous than a clearly incomplete one.

Ask the bidder to return five things in writing: a defined measurement boundary, a current load and production profile, a roof and interconnection assumption, an hourly or interval PV generation model with losses, and a bill-component calculation using the current tariff. The model should show at least a normal day, a low-production day and a shutdown or holiday case. It should distinguish generated, self-consumed, exported and curtailed energy. It should also state whether the proposed plant changes maximum demand in the interval record or only imported kWh.

If two bids reach very different system sizes from the same roof, compare their low-load assumptions and export treatment before comparing price. If one bid silently assumes a saleable output denominator or tariff that does not match the unit, its payback can look precise while being wrong. A good proposal makes disagreement visible.

Questions plant heads usually ask

Can a 24-hour texturising unit use all its solar power? It may consume much of the daytime output if machines run through daylight, but that requires interval proof. Night demand remains separate without storage or another approved arrangement. Sundays and shutdowns can reduce self-consumption.

Can I calculate kWh per kg from one monthly bill? You can get a rough site value if the bill period and saleable output period match, but it will not isolate machines and may miss generator or self-used solar energy. Product mix and work-in-progress need explanation.

Does solar reduce maximum-demand charges? Only if it reduces the meter’s maximum-demand interval. A later night or cloudy peak may leave the charge unchanged. Compare interval demand, not annual kWh alone.

Is a spinning-mill benchmark suitable for my texturising unit? No. The processes and meter boundaries differ. A spinning-mill article may give broader textile context, but it cannot supply a substitute SEC value for this unit.

What is the first useful data request? Ask for twelve bills and, if available, an interval load export. Then align them with production logs. Those records determine whether a solar-size model has a defensible starting point.

The yarn texturising solar page shows how to present shifts, machine load and roof facts for a plant proposal.

Get a load-based proposal for my plant. Use the business enquiry form attached to this article or the industrial solar page, and send bills and your production schedule. A site-specific model can then identify what is measured, what is assumed and what needs a roof or electrical review.

Written by
Heaven Green Energy

Founded in Surat in 2017. Head office at Utran, Surat. Heaven Green files PM Surya Ghar and DISCOM paperwork for its customers.

About Heaven Green Energy
Ready to Go Solar?

Plan solar around your factory

Share recent electricity bills, the load profile and roof details so the proposal can address your site.

Call WhatsApp