Find the sector question that matches your site
An industry category helps us ask better questions. It does not determine a fixed system size or a guaranteed saving. The sector links below lead to detailed planning questions for each facility.
| Sector | First decision to settle | What to bring to a proposal review |
|---|---|---|
| Textile processing: dyeing, printing and finishing | How do process loads, steam/soot and roof condition interact? | Bills, shift schedule, roof and utility drawings |
| Yarn texturising and twisting | How much demand persists in daylight and at night? | Interval demand, machine count, production shifts |
| Circular knitting | Who controls the roof and electricity connection? | Lease/roof rights, bills, sanctioned load |
| Garment manufacturing | Do sewing, pressing, HVAC and production hours line up with solar? | Work schedule, roof plan, energy bills |
| Chemical plants | Which roof zones, corrosion exposures and site safety rules apply? | EHS restrictions, roof survey, electrical SLD |
| Dyes and intermediates | How do fumes, pipe racks and mixed roof types limit usable area? | Process-zone map, roof drawings, maintenance access |
| Nursing homes and clinics | Which loads are daytime, and what is the separate backup plan? | Bills, critical-load list, roof ownership |
| Diagnostic centres | How do imaging/air-conditioning loads and UPS arrangements affect the electrical design? | Equipment list, UPS/SLD, interval data |
The table is a navigation and data checklist, not a claim that Heaven Green has completed projects in each sector. Do not infer a sector's consumption or roof suitability from its name. The four questions that recur across sectors are: when is electricity used, where can panels safely sit, how will the plant connect, and who will maintain it? The sections below show what changes when those questions are applied to different facilities.
Textile processing: the roof and process both matter
Dyeing, printing and finishing houses can use electricity in drives, pumps, blowers, water handling and ancillary utilities while also using thermal energy in process equipment. Rooftop solar produces electricity; it does not directly replace fuel or steam. An energy proposal should distinguish electrical kWh from thermal consumption and avoid adding them together as though they were one bill line. The Bureau of Energy Efficiency's Surat textile cluster manual treats machinery and utility loads separately, a useful approach for a processing-house survey.
Processing roofs may face dust, lint, soot or nearby exhaust streams depending on the plant. Those exposures affect cleaning access and potentially component selection, but their severity cannot be stated from the industry label alone. A roof survey should mark stacks, vents, drainage, walkways and repair areas. An electrical survey should show which drives and pumps run during solar hours. If production cannot stop, plan roof work and the eventual electrical tie-in around an agreed safe window rather than promising no interruption.
Yarn texturising and twisting: a 24-hour schedule is not a solar percentage
Texturising and twisting units often care about electricity cost per kilogram of saleable yarn, but their process and machine mix matter. Texturing machines can include electrical heaters, drives, friction units and winders. Oerlikon Barmag's machine literature shows how configurations differ. It does not give the consumption of a specific Surat plant. Measure actual demand and output within a consistent boundary before using a kWh/kg number in a business case.
A unit operating through the night can have a substantial daytime load for solar to serve, but the same solar array cannot serve the night directly without a separate approved storage or supply arrangement. The useful test is an interval load curve over working days, Sundays and shutdowns. Compare that curve with an hourly PV estimate, then test self-consumption and possible surplus under the current connection rules. A stable monthly bill can conceal very different afternoon and evening demand patterns.
Circular knitting: roof rights may decide the project first
A knitting unit can operate in a rented building, on an upper floor, or under a metal shed. Before discussing panel capacity, establish whether the business controls the roof, can grant safe access and can install and operate equipment through the remaining lease term. The electricity connection may be held by the tenant or building owner; that affects the application route and the commercial arrangement. The 2026 GERC distributed-renewable rules require the system owner to own, lease, lawfully possess or otherwise hold valid authority to use the installation location.
Machine-level load should be measured rather than guessed from the number of knitting machines. Include air handling, lighting and other shared services, then match the bill period to production. A small available roof may be constrained by the sanctioned connection or by the building's structural condition. Where roof and connection belong to different parties, put consent, operation, maintenance, removal and damage responsibilities in writing before an EPC price is treated as final.
Garment manufacturing: use the production calendar
Garment facilities can have different mixes of sewing, cutting, pressing, ventilation and air conditioning. A shift that begins early or finishes late is not the same as a 24-hour plant, and a seasonal order cycle can make a single month's bill misleading. Ask for twelve bills and a production calendar before sizing solar. Daytime work can align with PV generation, but the share of use supplied by solar depends on actual interval demand, roof area, shading and approved export treatment.
Some buyers request energy information as part of a supply-chain audit. A solar proposal can help document the intended system and, after commissioning, the measured generation. It should not turn forecast output into a verified emission reduction without a clear accounting method. Keep equipment specifications, meter records and maintenance evidence together if the facility expects audit questions. For a garment unit, record the electricity and emissions documents a buyer actually requests.
Chemical plants: safety zones precede array layout
For a chemical facility, the available roof is not simply the area visible in an aerial image. Exhausts, pipe racks, maintenance routes, corrosive exposure and the site's hazardous-area classification may rule out some zones or require a different design. The plant's EHS and electrical teams should supply the current zoning and roof-access rules. No website can classify a process area from the word “chemical,” and an EPC should not draw panels across a restricted roof before that review.
The building structure and roof material need the same load-path and wind review as any factory, with extra attention to known corrosion and maintenance needs. An electrical design should identify the point of connection, isolation and protection required by current CEA and DISCOM rules. The CEA safety-regulation register lists the 2023 regulations and a BESS-focused 2026 amendment that takes effect on 1 April 2027. Use the requirements in force on the project date. Any GPCB or fire-related decision requires the plant’s actual permit conditions and current authority requirements.
Dyes and intermediates: separate electricity from process heat
Dyes and intermediate manufacturing can include motors, pumps, treatment systems, cooling and process equipment that uses other fuels. The electricity bill is only part of the plant's energy story. A rooftop PV model should use the electrical load that the selected connection actually serves. It should not divide a total fuel-plus-electricity cost by solar kWh or assume solar directly covers process heat. A plant that operates in batches can have large differences between running and idle intervals, so a monthly average alone may overstate daytime absorption.
Roof choice also matters. One site may have RCC buildings, metal sheds, old extensions and a roof near aggressive process exhaust. Mark each roof zone separately and document the material and condition. The chemical facility's own corrosion and access policies, plus the structural engineer's findings, should shape the equipment and maintenance plan. Verified plant inputs should drive the layout; a generic manufacturer photo is not proof of local experience.
Nursing homes and clinics: solar and backup solve different tasks
A clinic or nursing home may have daytime air conditioning, sterilisation, lighting and other load, but continuity of critical equipment during a power cut is a separate safety task. Ordinary grid-connected rooftop PV does not automatically supply the premises during a grid outage. The CEA rooftop safety guidance describes anti-islanding and why grid-tied systems disconnect. If the facility needs backup, a qualified electrical designer must specify the UPS, generator, battery and transfer arrangements for the actual critical loads.
Building ownership can add another gate. A small facility in a mixed-use building may not control the full terrace, meter or electrical riser. Establish who can sign the roof agreement, who receives the electricity benefit and who maintains safe access. Do not sell solar as a medical-grade uninterrupted supply or as a substitute for a backup system.
Diagnostic centres: map electrical interfaces carefully
Diagnostic facilities may combine imaging equipment, analysers, cooling and UPS systems. The exact load and power-quality requirements come from the equipment vendors and the facility's electrical drawings, not from a category label. A proposed solar inverter connects to the site's distribution system; it should be reviewed alongside existing UPS, generator and protective devices. A site-specific electrical engineer must decide where it can connect and what testing is required. This hub does not imply that a solar array will back up an MRI, CT or laboratory analyser during an outage.
The roof may also be shared with HVAC equipment and access routes needed by maintenance staff. Removing those routes to fit more panels creates a long-term operating problem. Ask for the facility's single-line diagram, equipment schedule, bills and rooftop plan before a capacity estimate. The electrical engineer should include these interfaces in the facility design review.
The same four inputs, different decisions
Across all eight sectors, a defensible proposal begins with electricity use, roof capacity, connection rules and operating constraints. First, record when power is used, not only annual units. Second, map where an engineered array may fit after shade, maintenance and safety exclusions. Third, confirm the utility, tariff category and current metering arrangement. Fourth, agree how installation and ongoing access fit the plant's work. None of these steps gives a guaranteed bill reduction by itself; together they give a basis for a model the buyer can inspect.
| Input | What a useful proposal should show | What it cannot infer |
|---|---|---|
| Twelve bills and interval data | Seasonal consumption, demand and representative load curve | Exact future production schedule |
| Roof drawings and condition survey | Accepted zones, structural questions, access routes | Safety from roof area alone |
| Electricity account and SLD | DISCOM, connection, protection and application basis | Automatic approval |
| Production and shutdown calendar | Daytime self-use, low-load periods, tie-in windows | Identical load in every month |
| Equipment and quote schedule | Exact component models, scope and maintenance assumptions | Unverified lifetime or savings guarantee |
The GERC renewable-regulation register identifies the 30 October 2026 rule governing new distributed renewable proposals in Gujarat. A project proposal must use the current operative text and the correct DISCOM procedure. A generation estimate can use a documented model such as NREL PVWatts with location, roof orientation and losses disclosed. Its output is an estimate, not an invoice or performance promise.
Compare a sector-specific proposal with a generic quote
Suppose two EPCs quote for the same factory. One uses roof area to select a plant and a standard savings percentage. The other lists the accepted roof bays, load curve by shift, the applicable utility rule and the points still awaiting engineering review. The second may be less dramatic, but it gives the buyer a way to test the size and scope. Ask each bidder what happens if a roof bay fails structural review, if the factory runs fewer shifts, or if a different metering arrangement is approved. Those are real cost and timing questions.
Sector knowledge should appear in the proposal's assumptions, not in a banner saying “we understand your industry.” For a texturising unit, that may mean separating day and night load. For a chemical plant, it may mean showing restricted roof zones and corrosion review. For a clinic, it may mean a clear boundary between solar and backup. An EPC can address a sector without claiming unverified projects in it. The industrial solar and commercial solar pages cover the broader buyer paths.
What happens next
Choose the closest sector, then send the bills and roof information that are available. If your operation spans several categories, describe the real processes instead of forcing it into one card. The proposal should identify what is known, what remains to be measured, and which source governs each regulatory statement. A factory with a complex load or leased roof may need an additional survey or consent before capacity can be settled.
Get a load-based proposal for my plant. Share your bills, schedule and roof details through the enquiry form on this page.