Solar panel installation in Rewa.

Heaven Green Energy installs rooftop solar in Rewa as an authorised channel partner of Adani and a PM Surya Ghar empanelled vendor. We size your system against your actual MPPoKVVCL bill, install it, file your net-metering application with the East Discom, and claim the ₹78,000 central subsidy for you. You sign. We do the running.

Authorised Adani Solar distributor₹78,000 subsidy handled end-to-endMPPoKVVCL net metering filed for youFree survey, no advance payment

Get your free Rewa solar quote

Send your bill and pin code. An engineer calls back with your system size, cost after subsidy and payback, usually within 2 working hours.

Free site survey. No advance payment.

Prefer to talk? +91 63904 05060

Distribution licensee
MPPoKVVCL (MP East Discom)
Jabalpur-based, not the Indore or Bhopal company
Regulator
MPERC
Sets the net-metering framework
Solar resource
About 5 peak sun hours
Solid Vindhya plateau irradiance
Generation
4 to 4.3 units per kW daily
Year-round average
Central subsidy
Up to ₹78,000
Residential, 3 kW and above
Typical payback
3.5 to 5 years
Residential on-grid

The short answer

Rooftop solar in Rewa costs roughly ₹55,000 to ₹70,000 per kW before subsidy. A 3 kW system runs about ₹1.85 lakh to ₹2.30 lakh, falling to ₹1.07 lakh to ₹1.52 lakh after the ₹78,000 PM Surya Ghar subsidy. Each kW generates 4 to 4.3 units a day here. MPPoKVVCL, the MP East Discom, handles Rewa net metering. Payback lands between three and a half and five years.

Last reviewed 18 September 2026 · Heaven Green Energy engineering team

Price, size and savings

Find your bill. Read across.

Most Rewa solar pages hide the price behind a callback form, or quote a national average that means nothing in a Vindhya district town. One table answers the whole question instead. Find your monthly bill on the left, then read across for system size, monthly generation, roof area needed and cost after subsidy.

Indicative Rewa market ranges, 2026
Your monthly bill System Generates Roof needed Cost after subsidy Payback
Up to ₹1,800 2 kW 1–2 BHK, one AC used sparingly 235–260units/month ~200 sq ft ₹70,000 – ₹1.00 lakh ₹1.30 lakh–₹1.60 lakh before ₹60,000 subsidy 3.5–4.5 years
₹2,000–₹3,500 3 kW Best value The largest system that still earns the full ₹78,000 355–390units/month ~300 sq ft ₹1.07 lakh – ₹1.52 lakh ₹1.85 lakh–₹2.30 lakh before ₹78,000 subsidy 3.5–4.5 years
₹3,500–₹6,000 5 kW 3 BHK running two ACs through summer 590–650units/month ~500 sq ft ₹2.12 lakh – ₹2.72 lakh ₹2.90 lakh–₹3.50 lakh before ₹78,000 subsidy 4–5 years
₹6,000–₹13,000 10 kW Bungalows, clinics, shops, coaching institutes 1,180–1,300units/month 700–1,000 sq ft ₹4.52 lakh – ₹5.62 lakh ₹5.30 lakh–₹6.40 lakh before ₹78,000 subsidy 4–5 years
Above ₹13,000 25 kW+ Commercial connections, on accelerated depreciation 2,950–3,250units/month Site-specific ₹11.00 lakh – ₹13.75 lakh ₹11.00 lakh–₹13.75 lakh, no subsidy 3–4.5 years

Indicative Rewa market ranges for 2026, covering Tier-1 modules, a branded inverter, galvanised structure, protection and installation. These are not a Heaven Green quotation. Subsidy amounts are the central PM Surya Ghar figures published on pmsuryaghar.gov.in. Generation assumes a shadow-free, roughly south-facing roof.

Size against units, not rupees. Read the units figure off your last MPPoKVVCL bill rather than the amount payable, because units are what a solar system actually cancels. The rupee total moves with slab rates and arrears. Shadow-free is the other phrase doing real work in that roof column. An overhead tank, a stair cabin or a neighbour's parapet shading the array for two hours a day costs more output than most buyers expect.

The 3 kW cliff is the single most useful fact on this page. Subsidy covers 34 to 42% of a 3 kW system but only 12 to 15% of a 10 kW one, because nothing at all is paid above the third kilowatt. If your bill sits on the border, 3 kW returns more rupees per rupee spent.

A cheap Rewa quote is cheap in the structure, not the panels. Rewa is a district-headquarters market with a thin pool of local installers, so quotes arrive from Satna, Jabalpur and Allahabad as well. Galvanising thickness, cable gauge, earthing and surge protection separate the bottom of each band from the top, and none of it is visible in a one-line price. Demand a written Bill of Materials with make, model and quantity, or you are not comparing prices at all.

Check who carries the warranty claim. A quote from an installer based two districts away is not automatically worse. Still, ask who physically attends if an inverter fails in year six, how long that takes, and whether the annual maintenance contract is written or verbal. In a market this size, the answer to that question is worth more than the last five thousand rupees of discount.

Why there is no rupee saving in that table

There is no rupee saving column in that table, and that is deliberate. The rupee figure depends on the slab rate you personally pay, which is printed on your own bill and differs between consumers and categories. Guessing it here would flatter the payback. Bring your last bill to the free survey and we will work the exact number out with you, in front of you, using your own tariff rather than an average. Prefer to work it out yourself first? Put your bill into our solar savings calculator. No phone number required.

This is what we actually build.

Heaven Green Energy installations across India. Not stock photography, and not renders. Your Rewa system is built to the same specification.

Rooftop solar array photographed against a city skyline at sunset
Residential rooftop
Long row of solar modules on a commercial building rooftop photographed at sunrise
Commercial rooftop
Elevated solar canopy structure mounted above a terrace, leaving the floor below usable
Elevated structure
Wall of dozens of string inverters mounted in neat rows at a large solar installation
Electricals

PM Surya Ghar Muft Bijli Yojana

₹78,000

Maximum central subsidy for a residential rooftop system.

  • ₹30,000 per kW for the first 2 kW
  • ₹18,000 for the 3rd kW
  • Nothing paid above 3 kW
  • Credited directly to your bank account
  • We file the entire claim for you
How the subsidy works

Five steps, and we run four of them.

Anyone advertising a bigger "Rewa subsidy" is selling something that does not exist. PM Surya Ghar is a central scheme, so the amount is identical in Rewa, Satna and Delhi. What changes by city is who processes your file, how quickly the local office moves, and whether your vendor is empanelled. Here the processing sits with MPPoKVVCL.

1

Register on the National Portal

You register at pmsuryaghar.gov.in with your MPPoKVVCL consumer number, mobile, Aadhaar and address. We sit with you for this step. A consumer number that does not match discom records is the commonest reason a Rewa application stalls for weeks.

2

Apply for feasibility, then pick your vendor

MPPoKVVCL checks the application against your sanctioned load. You then select an empanelled vendor from the portal list. Heaven Green Energy is empanelled, so we map directly to your application without a third party in between.

3

Install only after approval

Installation comes after feasibility clears, never before. We supply Adani modules with traceable serial numbers and hand you a Bill of Materials and a warranty schedule on the day we finish.

4

Inspection and net meter

MPPoKVVCL inspects the installation and fits the bidirectional meter, which generates the commissioning certificate on the portal. Our engineer attends the inspection so queries get answered on the spot rather than by post.

5

Claim and credit

We file the subsidy claim once the certificate issues, and government credits the money straight to your bank account. It never passes through us. Treat any Rewa vendor who offers to collect the subsidy on your behalf as a warning sign.

If you are a business, this section does not apply

PM Surya Ghar covers residential consumers only. A shop on Sirmour Chowk, a cement-belt workshop or a coaching institute in Rewa cannot claim it. Businesses claim accelerated depreciation on the asset instead, which for a taxpaying firm often returns more than the residential subsidy would.

MPPoKVVCL (MP East Discom)

Net metering: who you actually file with.

Net metering is where competing Rewa pages get it wrong, and the error quietly costs you every export credit you were counting on.

Rewa is supplied by Madhya Pradesh Poorv Kshetra Vidyut Vitaran Company Limited (MPPoKVVCL), the East Discom, whose head office is Shakti Bhawan at Rampur in Jabalpur. Madhya Pradesh splits distribution three ways and the acronyms sit close enough to trip up anyone reading quickly. Poorv Kshetra runs the eastern zone from Jabalpur, Paschim Kshetra the west from Indore, and Madhya Kshetra the centre from Bhopal. A page that files your Rewa application with the Indore or Bhopal company has sent it to a different licensee, and it will not be processed.

The Rewa district administration's own public-utility listing points consumers at the mpez.co.in domain, the East Zone portal. It also names the Executive Engineer for the city division at Narendra Nagar, Amaiya Colony. Rewa is the divisional headquarters for the wider Vindhya area, so the circle and divisional offices you will deal with sit in the city rather than in another district.

Commercial terms come from the Madhya Pradesh Electricity Regulatory Commission (MPERC), not from the discom and not from us. Under the MPERC framework your system is capped at your sanctioned load, and every consumer category may apply. Units you export are credited against units you import across the billing cycle.

1

Application

Consumer details, sanctioned load, system rating, single-line diagram and equipment datasheets go to MPPoKVVCL under your connection.

Filed by us
2

Technical feasibility

The discom tests whether your transformer and sanctioned load can carry the proposed capacity. Oversized systems fail here, which is why we size against sanctioned load on the first visit.

MPPoKVVCL
3

Installation and inspection

We install. MPPoKVVCL then inspects earthing, protection, isolation and metering compliance before anything is energised.

Us, then MPPoKVVCL
4

Bidirectional meter

Your meter is swapped for a bidirectional net meter and the commissioning certificate issues. Export credits begin from that date, not from the day panels went up.

MPPoKVVCL
Solar panels installed flush on a corrugated metal factory roof with industrial buildings behind
Not a home?

Solar for Rewa's businesses.

Running a factory, showroom, hospital or coaching institute rather than a home? The economics work differently and this page is written for householders.

Rewa is also an education town, and that matters commercially. Awadhesh Pratap Singh University, Shyam Shah Medical College, Rewa Engineering College, the agriculture college and Sainik School all sit here, and around them cluster hostels, messes, clinics and coaching institutes. Those buildings run heavy daytime load, which is exactly the load profile rooftop solar cancels best.

Businesses in the Chorhata industrial area, along the Rewa bypass and through the limestone and cement belt running towards Satna get no PM Surya Ghar subsidy. They claim accelerated depreciation on the asset instead, which for a taxpaying firm often returns more than the residential subsidy would. They can also avoid capital outlay altogether through OPEX or RESCO models.

We deliver turnkey commercial and industrial EPC across the Vindhya belt, with structural design to wind-load standards, MPPoKVVCL registration and long-term operations and maintenance.

  • Chorhata industrial area and the Rewa bypass corridor
  • Cement, limestone and quarry-linked units towards Satna
  • Cold stores, rice and flour mills on the Bansagar canal command
Why us

Why Rewa customers choose Heaven Green Energy

We have built solar since 2017 and delivered more than 10,000 installations across India, from single rooftops to industrial plants running into hundreds of kilowatts.

Authorised Adani Solar distributorGenuine Adani modules, traceable serial numbers, full manufacturer warranty. No grey-market stock, and no brand that disappears in year eight exactly when you need a claim honoured.
We build our own invertersQbits is our in-house inverter brand, so service on the component most likely to need it runs through us rather than through an importer and a queue.
The paperwork is our jobPortal registration, vendor mapping, MPPoKVVCL feasibility and net metering, inspection and the subsidy claim all sit with our team. You sign forms and attend the survey.
Nothing to pay for the surveySurvey and proposal cost nothing and commit you to nothing. You keep the Bill of Materials, generation estimate and payback figure, and you are free to price them against any rival in Rewa.

Where we are based

Heaven Green Energy is headquartered at Mota Varachha, Surat, and that is our only office. There is no Heaven Green branch, showroom or local number in Rewa. We serve the city and the wider Vindhya region through our channel partner network and field engineering team. They run the surveys, supervise installation and handle MPPoKVVCL coordination on the ground. We say this before you sign rather than after, because plenty of vendors advertise a local presence they do not have.

How we work

From first call to a spinning net meter.

Four steps to a spinning net meter in Rewa, including the parts that belong to MPPoKVVCL rather than to us, so you know who to chase.

01

Free site survey

We measure shadow-free area, check the roof slab and structure, read your sanctioned load and twelve months of MPPoKVVCL consumption, and log shading from tanks and parapets.

Day 1–2
02

Written proposal

System size, layout, Bill of Materials with makes and models, generation estimate at Rewa irradiance, your subsidy figure and payback. No obligation and no advance.

Day 3–5
03

Applications and installation

We file with the national portal and with MPPoKVVCL, then install once feasibility clears. A typical Rewa residential roof takes two to four days.

Day 5–15
04

Inspection, meter, subsidy

MPPoKVVCL inspects and fits the bidirectional meter, the commissioning certificate issues, and we file your claim. Government pays the subsidy into your account.

Set by MPPoKVVCL

What Rewa weather does to a solar system

A system specified for a coastal Gujarat roof is the wrong system for the Vindhya plateau. Three local conditions change the engineering here, and a vendor who ignores them quotes you less and delivers less.

Dust and soiling for most of the year

Rewa's IMD 1991 to 2020 normals record only about 46 rainy days a year, so glass stays dry and dirty for long stretches between showers. Plateau dust, quarry and cement-belt haul traffic and field burning build a soiling film that cuts output with no visible fault. There is no alarm and nothing on the inverter display to warn you. Plan on cleaning every two to three weeks from February to June. Our AMC covers it.

Genuine summer heat derating

May averages a daily maximum of 41.6°C in Rewa, and the record high on the IMD series is 48.2°C. Module output falls as cell temperature climbs, so airflow is the fix: real clearance between module and roof so heat escapes underneath. A structure bolted flush to the terrace to save steel costs you generation every summer for twenty-five years.

A short, heavy monsoon

Rewa takes about 1,037 mm of rain a year on the IMD 1991 to 2020 normals, and roughly 60% of it arrives in July and August alone. That means concentrated downpours and pre-monsoon squalls rather than steady drizzle, so the roof gets loaded hard over a few weeks and then dries out. Galvanising thickness, foundation design and fastener grade keep an array on the roof through them, and earthing with surge protection guards the inverter, the costliest part you will ever replace.

Service area

Areas of Rewa we install in.

We install across Rewa city, the surrounding tehsils and the district's industrial pockets. Areas below are grouped by pin code as India Post records them. An area missing from this list is not an area we refuse, so call and ask.

Rewa city core Pin 486001

Rewa City · Chauhatta · Chirahula · Chirahula Colony · Ghoghar Mohalla · Uprahaty · Venkat Bhawan · Bichhiya Road · Amaiya Colony · Narendra Nagar · Rewa AG College · Rewa Medical College

University and institutional belt Pin 486002, 486003, 486006

Rewa Engineering College · APSU campus area · Ratahara · Sonaura · Ajgarha · Chorahata · Khaira · Nipania · Rausar · Tamarabasi

Outer city, Bansagar and Govindgarh side Pin 486005, 486550

Bansagar Colony · Kanauja · Khaur · Laxmanpur · Lohi · Govindgarh · Mukundpur · Tikar · Supiya · Shukulgawan · Bansa · Amilki

Tehsils and the wider Vindhya belt Pin 486111, 486114, 486117, 486123, 486220, 486223, 486331, 486340, 486441, 486448, 486450, 486553

Gurh · Sirmour · Mangawan · Raipur Karchulion · Manikwar · Semariya · Teonthar · Jawa · Naigarhi · Mauganj · Baikunthpur · Jaypee Nagar · Keoti · Lalgaon

Customers

Real customers, real cities.

Verified Heaven Green Energy customers, each shown with the city their system was actually installed in. We do not re-label customers to match the page you happen to be reading.

★★★★★
Got the full ₹78,000 PM Suryaghar subsidy credited within 30 days of commissioning. Not one extra trip needed, they did all the follow-up.
Ashok Mehta
Residential · Vadodara · 6 kW
★★★★★
10 kW on our farmhouse with battery backup. No more relying on the unreliable rural grid. Their AMC visits are on schedule, panels stay clean.
Hardik Solanki
Residential · Junagadh · 10 kW
★★★★★
250 kW industrial system on our chemical plant. Generation has been 8% above estimate every month. Their O&M team is responsive.
Sanjay Joshi
Industrial · Bharuch · 250 kW
Before you sign

Six things to check on any Rewa quote.

Including ours. Take this list to every vendor you speak to.

Questions

Solar in Rewa: every question answered.

17 questions Rewa buyers actually search for, including the ones competing pages leave out. Grouped so you can skip to what you need.

Cost & subsidy

What is the cost of solar panel installation in Rewa in 2026?
Roughly ₹55,000 to ₹70,000 per kW installed before subsidy. That puts 3 kW at ₹1.85 to ₹2.30 lakh, 5 kW at ₹2.90 to ₹3.50 lakh and 10 kW at ₹5.30 to ₹6.40 lakh. Structure quality, protection specification and roof access drive the spread, not the panel brand.
What is the price of a 3 kW solar system in Rewa with subsidy?
Between ₹1.07 lakh and ₹1.52 lakh net, from ₹1.85 to ₹2.30 lakh less the ₹78,000 subsidy. A 3 kW system generates 355 to 390 units a month in Rewa, which covers a household using 300 to 380 units. It is the smallest system earning the full subsidy, so it sells most.
How much solar subsidy do I get in Rewa?
Up to ₹78,000. Per pmsuryaghar.gov.in, PM Surya Ghar pays ₹30,000 per kW for the first 2 kW and ₹18,000 for the third, and nothing beyond that. So 1 kW earns ₹30,000, 2 kW earns ₹60,000, and 3 kW or larger earns ₹78,000, credited straight to your bank account.
Can I buy solar on EMI or a bank loan in Rewa?
Yes. Residential rooftop solar falls under priority-sector lending, and several banks and NBFCs finance it. Most households finance the pre-subsidy amount, then prepay principal once the subsidy lands. We can introduce financing partners, though pricing them against your own bank in Rewa is the smarter move.

Net metering & DISCOM

Which DISCOM serves Rewa for rooftop solar?
MPPoKVVCL, Madhya Pradesh Poorv Kshetra Vidyut Vitaran Company Limited, the East Discom headquartered at Shakti Bhawan, Rampur, Jabalpur. It is a different company from MPPKVVCL in Indore and MPMKVVCL in Bhopal. Some solar sites list Rewa under the wrong one, and filing there gets you nowhere.
Is net metering available in Rewa, and what happens to my surplus units?
Yes. Under the MPERC framework your system may be sized up to your sanctioned load and all consumer categories qualify. Your home uses solar first by day and exports surplus to MPPoKVVCL as credit against units drawn at night, so a February to June surplus banks against the monsoon dip.
How long does MPPoKVVCL net metering take in Rewa?
A few weeks from application to installed bidirectional meter, covering feasibility, post-installation inspection and the meter swap. Installation itself is only days of that. The discom-controlled steps set the pace and no installer can compress them, so treat a guaranteed one-week net meter as a red flag.
Do I need MPPoKVVCL approval before installing solar in Rewa?
Yes, for any grid-connected system, which is nearly everyone. The order runs application, feasibility approval, installation, then inspection and meter. Installing first is how roofs end up generating with no export credit, and how oversized systems get rejected outright. We file in the correct order for you.

Sizing & performance

How many units does 1 kW of solar generate per day in Rewa?
About 4 to 4.3 units daily, averaged across the year. Rewa gets roughly 5 peak sun hours, a solid resource for the Vindhya plateau. Output beats that average from February to June and drops during the July and August monsoon peak, when most of the year's rain falls.
What size solar system do I need for a 2 BHK or 3 BHK home in Rewa?
A 2 BHK usually needs 2 to 3 kW and a 3 BHK 3 to 5 kW, but size against consumption rather than floor plan. Take the units figure from twelve months of MPPoKVVCL bills and pick the system that covers your average month, not your worst one.
How many ACs can run on a 3 kW or 5 kW solar system in Rewa?
A 1.5-ton split AC draws 1.2 to 1.5 units per hour while the compressor runs. A 3 kW system making around 12 units a day here supports one AC by day plus normal household load. Two ACs through a Rewa May, when maximums average 41.6°C, needs 5 kW.
How much roof area do I need for solar in Rewa?
About 90 to 100 sq ft of genuinely shadow-free area per kW, so roughly 300 sq ft for 3 kW and 500 sq ft for 5 kW. Shadow-free is the operative word. An overhead tank or a neighbour's parapet shading the array costs real output, and an elevated structure recovers area on a congested terrace.

Installation & service

How long does solar installation take in Rewa?
Two to four days on a typical residential roof. The whole process, from survey and proposal through the portal and MPPoKVVCL applications to inspection and net meter, runs several weeks, with the discom steps as the variable. We give a date range at proposal stage and name which steps are ours.
What maintenance do solar panels need in Rewa?
Mainly cleaning, and more of it than a wetter district needs. Rewa records about 46 rainy days a year, so dust, quarry and cement-belt haul traffic and field burning leave a soiling film for months. Clean every two to three weeks from February to June, and check connections and earthing twice yearly.
Can I add more panels to my Rewa system later?
Usually yes, within two limits: your inverter capacity and your MPPoKVVCL sanctioned load. Tell us at survey stage if you expect to expand, and we will specify an inverter with headroom and lay the structure out for it. Going beyond sanctioned load needs a load-enhancement application first.

About Heaven Green

Does Heaven Green Energy have an office in Rewa?
No. Our headquarters is at Mota Varachha, Surat, and it is our only office. We serve Rewa and the wider Vindhya region through our channel partner network and field engineering team, who run surveys, supervise installation, handle MPPoKVVCL coordination and provide after-sales service locally.
Rewa already has a huge solar park. Does that change anything for my rooftop?
No. The 750 MW Rewa Ultra Mega Solar park at Gurh, built by Rewa Ultra Mega Solar Limited, is a utility-scale plant feeding the grid under long-term contracts. Your rooftop system is a separate consumer-side installation under PM Surya Ghar and MPPoKVVCL net metering, with its own approvals, its own meter and its own subsidy. The park does not lower your tariff, and no vendor can claim a link to it.
Nearby

We also install around Rewa.

Every city we cover is listed in the solar by location directory.

Free Rewa site survey No advance payment, no obligation Get my quote
Call WhatsApp