Solar panel installation in Vapi.

Heaven Green Energy is an authorised channel partner of Adani and a PM Surya Ghar empanelled vendor serving Vapi. We size your system against your actual DGVCL bill, install it, file the net-metering application with Dakshin Gujarat Vij Company Limited, and claim your ₹78,000 central subsidy. You sign. We do the rest.

Authorised Adani Solar distributor₹78,000 subsidy handled end-to-endDGVCL net metering filed for youIndustrial and GIDC rooftops built

Get your free Vapi solar quote

Send your latest bill and your pin code. An engineer calls back with system size, cost after subsidy and payback, usually inside two working hours.

Free site survey. No advance payment.

Prefer to talk? +91 63904 05060

Distribution licensee
DGVCL (South Gujarat discom)
Not Daman or Silvassa, which are a separate UT utility
Regulator
GERC
Sets Gujarat's net-metering framework
Solar resource
About 5.5 peak sun hours
Strong, though the monsoon is heavy here
Generation
4 to 4.5 units per kW daily
Annual average across all seasons
Central subsidy
Up to ₹78,000
Residential only, 3 kW and above
Typical payback
3.5 to 5 years
Faster on commercial and industrial loads

The short answer

Rooftop solar in Vapi costs about ₹1.80 lakh to ₹2.25 lakh for 3 kW before subsidy. The ₹78,000 PM Surya Ghar subsidy brings that down to roughly ₹1.02 lakh to ₹1.47 lakh. Each kW generates 4 to 4.5 units a day here. Dakshin Gujarat Vij Company Limited, DGVCL, is the licensee that approves your net meter. Residential payback runs three and a half to five years.

Last reviewed 18 September 2026 · Heaven Green Energy engineering team

Price, size and savings

Find your bill. Read across.

Most Vapi solar pages quote a national average or hide the number behind a callback form. This table answers it outright. Find your monthly bill in the left column, then read across for size, generation, roof area and cost after subsidy.

Indicative Vapi market ranges, 2026
Your monthly bill System Generates Roof needed Cost after subsidy Payback
Up to ₹1,800 2 kW 1–2 BHK, one AC used sparingly 240–270units/month ~200 sq ft ₹65,000 – ₹95,000 ₹1.25 lakh–₹1.55 lakh before ₹60,000 subsidy 3.5–4.5 years
₹2,000–₹3,500 3 kW Best value The largest system that still earns the full ₹78,000 360–405units/month ~300 sq ft ₹1.02 lakh – ₹1.47 lakh ₹1.80 lakh–₹2.25 lakh before ₹78,000 subsidy 3.5–4.5 years
₹3,500–₹6,000 5 kW 3 BHK running two ACs through summer 600–675units/month ~500 sq ft ₹2.07 lakh – ₹2.67 lakh ₹2.85 lakh–₹3.45 lakh before ₹78,000 subsidy 4–5 years
₹6,000–₹13,000 10 kW Bungalows, clinics, shops, coaching institutes 1,200–1,350units/month 700–1,000 sq ft ₹4.42 lakh – ₹5.52 lakh ₹5.20 lakh–₹6.30 lakh before ₹78,000 subsidy 4–5 years
Above ₹13,000 25 kW+ Commercial connections, on accelerated depreciation 3,000–3,400units/month Site-specific ₹10.75 lakh – ₹13.50 lakh ₹10.75 lakh–₹13.50 lakh, no subsidy 3–4.5 years

Indicative Vapi market ranges for 2026, covering Tier-1 modules, a branded inverter, galvanised structure, protection and installation. These are not a Heaven Green Energy quotation. Subsidy amounts are the central PM Surya Ghar figures published on pmsuryaghar.gov.in. Generation assumes a shadow-free, roughly south-facing roof.

Size against units, not rupees. Read the units figure off your DGVCL bill rather than the amount payable, because units are what a solar system cancels. The roof column says shadow-free for a reason. Overhead tanks, lift rooms and a neighbour's parapet all steal output. On the tight plots around Imran Nagar and Chala, an elevated structure usually pays for its extra steel inside two summers.

The 3 kW cliff decides most residential sizing. PM Surya Ghar pays nothing above the third kilowatt, so the subsidy covers a large share of a 3 kW system and a small share of a 10 kW one. If your bill sits on the boundary, 3 kW returns more rupees per rupee spent.

A cheap Vapi quote is cheap in the structure, not the panels. This is a coastal town inside a chemical estate, so galvanising thickness, fastener grade, cable gauge and earthing are not optional line items. Ask every vendor for a written Bill of Materials naming make, model and quantity, and ask specifically what corrosion protection the mounting structure carries. Without that sheet you are comparing two numbers, not two systems.

Roof type changes the price inside every band. A flat RCC terrace in Chala is the cheapest case. A sloped metal shed in GIDC needs different clamps and a purlin check. A terrace four floors up with no lift access adds labour and hoisting that no online calculator knows about. When two Vapi quotes differ by forty thousand rupees on the same system size, the reason usually sits in those three lines rather than in the modules. Ask the surveyor which one applies to your roof and what it added.

Why there is no rupee saving in that table

There is no rupee saving in that table, deliberately. The rupee figure depends on the tariff slab you personally pay, printed on your own DGVCL bill. It differs between a residential connection in Chala and a commercial one in GIDC. We will not guess it. Bring your last bill to the free survey and we will work the number out with you, in front of you. Any Vapi vendor quoting you a lifetime savings figure before reading your bill has invented it. Prefer to work it out yourself first? Put your bill into our solar savings calculator. No phone number required.

This is what we actually build.

Heaven Green Energy installations across India. Not stock photography, and not renders. Your Vapi system is built to the same specification.

Rooftop solar array photographed against a city skyline at sunset
Residential rooftop
Long row of solar modules on a commercial building rooftop photographed at sunrise
Commercial rooftop
Elevated solar canopy structure mounted above a terrace, leaving the floor below usable
Elevated structure
Wall of dozens of string inverters mounted in neat rows at a large solar installation
Electricals

PM Surya Ghar Muft Bijli Yojana

₹78,000

Maximum central subsidy for a residential rooftop system.

  • ₹30,000 per kW for the first 2 kW
  • ₹18,000 for the 3rd kW
  • Nothing paid above 3 kW
  • Credited directly to your bank account
  • We file the entire claim for you
How the subsidy works

Five steps, and we run four of them.

PM Surya Ghar is a central scheme, so the amount is identical in Vapi, Surat and Delhi. Anyone advertising a bigger "Vapi subsidy" is describing something that does not exist. What changes locally is who processes your file, and here that is DGVCL.

1

Register on the National Portal

You register at pmsuryaghar.gov.in using your DGVCL consumer number, mobile, Aadhaar and address. We sit with you for this step. A consumer number that does not match DGVCL records is the commonest reason a Vapi application stalls for weeks.

2

Apply for feasibility, then pick your vendor

DGVCL checks the application against your sanctioned load and the local network. You then choose an empanelled vendor from the portal list. Heaven Green Energy is empanelled, so we map straight onto your application.

3

Install only after approval

Installation before feasibility clears is how roofs end up generating with no approved net meter. We supply Adani modules with traceable serial numbers and hand you a Bill of Materials and warranty schedule on handover.

4

Inspection and net meter

DGVCL inspects the installation, fits the bidirectional meter and raises the commissioning certificate on the portal. Our engineer attends the inspection so queries get answered on the spot instead of by letter.

5

Claim and credit

We file the claim once the certificate issues. Government credits the subsidy directly to your bank account. It never passes through us, so treat any Vapi vendor offering to collect the subsidy on your behalf as a warning sign.

If you are a business, this section does not apply

PM Surya Ghar covers residential consumers only. A GIDC unit, a shop on NH-48 or a chemical plant in Chanod cannot claim it. Businesses instead claim accelerated depreciation on the asset, which for a taxpaying company frequently returns more than the residential subsidy would have paid. A mixed property, with a shop on the ground floor and the family living above, is judged on the connection category printed on the DGVCL bill. Check that line before assuming either route applies to you.

DGVCL (Dakshin Gujarat Vij)

Net metering: who you actually file with.

Net metering is where Vapi pages go wrong most often, because more than one distribution utility operates within fifteen kilometres of this town and the paperwork is not interchangeable.

Vapi is supplied by Dakshin Gujarat Vij Company Limited (DGVCL), the South Gujarat discom. It is a GUVNL subsidiary headquartered in Surat, covering Valsad, Navsari, Surat, Tapi, Bharuch, Narmada and the Dangs. Your file goes to the Valsad circle, through the Vapi division offices that serve the town and the GIDC estate.

That matters because Daman is four kilometres west and Silvassa fifteen kilometres east, and neither is DGVCL territory. Both sit in the Union Territory of Dadra and Nagar Haveli and Daman and Diu, served by the UT's own distribution company and regulated by JERC, not GERC. Vendors who work the whole Vapi to Daman to Silvassa belt routinely quote one process for all three. If your meter is a DGVCL meter, a Daman procedure is the wrong procedure, and a portal application filed against the wrong licensee does not move.

Commercial terms come from the Gujarat Electricity Regulatory Commission (GERC), not from the discom and not from us. Under the GERC framework your system is capped against your sanctioned load, and every consumer category may apply. Surplus units you export are credited against what you draw at night and through the monsoon.

1

Application

Consumer details, sanctioned load, system rating, single-line diagram and equipment datasheets go to the DGVCL office handling your area.

Filed by us
2

Technical feasibility

The discom checks whether your transformer and sanctioned load carry the proposed capacity. Oversized systems fail here, which is why we size against sanctioned load on the first visit.

DGVCL
3

Installation and inspection

We install. DGVCL inspects earthing, protection, isolation and metering compliance before anything is energised against the grid.

Us, then DGVCL
4

Bidirectional meter

Your meter is swapped for a bidirectional net meter and the commissioning certificate issues. Export credits begin accruing from that date, not from installation.

DGVCL
Solar panels installed flush on a corrugated metal factory roof with industrial buildings behind
Not a home?

Solar for Vapi's businesses.

Running a factory, warehouse or shop rather than a home? The economics work differently and this page is written for homeowners.

Vapi GIDC is one of India's largest small-scale industrial estates, roughly 1,140 hectares developed from 1967 onwards. It is home to well over a thousand units across chemicals, dyes and intermediates, pharmaceuticals, paper, packaging, plastics and textiles. Shed roofs across GIDC Phase I to Phase IV, Chanod, Morai, Balitha, Salvav and the Sarigam belt carry large shadow-free spans and daytime load profiles. That is close to the ideal case for rooftop solar.

None of those units get PM Surya Ghar. They claim accelerated depreciation on the asset instead, and they can avoid capital outlay altogether through OPEX or RESCO structures.

  • Structural design to wind-load standards, which matters on exposed coastal sheds.
  • DGVCL registration, feasibility and net metering handled by our team.
  • Long-term O&M with a cleaning schedule written for this estate, not a generic one.

Industrial payback in Vapi is usually shorter than residential payback, because commercial tariffs are higher and a factory consumes most of what it generates during daylight rather than exporting it. The survey starts with twelve months of your DGVCL demand and consumption data, not with a roof measurement, because sanctioned load and load curve decide what is worth installing.

Why us

Why Vapi customers choose Heaven Green Energy

We have built solar since 2017 and delivered more than 10,000 installations across India, from single terraces to industrial plants running into hundreds of kilowatts.

Authorised Adani Solar distributorGenuine Adani modules with traceable serial numbers and full manufacturer warranty. No grey-market stock, and no brand that disappears in year eight when a claim needs honouring.
We build our own invertersQbits is our in-house inverter brand. Service on the component most likely to need it runs through us rather than through an importer with a queue and a shipping schedule.
Industrial rooftops are routine workLarge shed roofs, wind-load calculations, HT connections and DGVCL coordination are part of our normal workload. They are not an exception we take on when a residential enquiry turns out to be a factory.
The paperwork is our jobPortal registration, vendor mapping, DGVCL feasibility, net metering, inspection and the subsidy claim all sit with our team. You sign the forms and attend the survey.

Where we are based

Heaven Green Energy is headquartered at Mota Varachha, Surat. We serve Vapi and the wider South Gujarat region through our channel partner network and field engineering team. They run the surveys, supervise installation and handle DGVCL coordination on the ground. There is no Heaven Green branch office in Vapi, and we would rather you knew that before you sign than after.

How we work

From first call to a spinning net meter.

Four steps to a spinning net meter, including the parts that belong to DGVCL rather than to us.

01

Free site survey

We measure shadow-free area, check the roof structure, read your sanctioned load and twelve months of DGVCL consumption, and log shading from tanks, parapets and neighbouring sheds.

Day 1–2
02

Written proposal

System size, layout, Bill of Materials with makes and models, generation estimate at Vapi irradiance, subsidy and payback. No obligation, and the document is yours to price against rivals.

Day 3–5
03

Applications and installation

We file on the national portal and with DGVCL, then install once feasibility clears. A typical residential roof takes two to four days, an industrial shed longer.

Day 5–15
04

Inspection, meter, subsidy

DGVCL inspects and fits the bidirectional meter, the commissioning certificate issues, and we file your claim. Government pays the subsidy into your account.

Set by DGVCL

What Vapi weather does to a solar system

A system specified for a dry inland roof is wrong here. Vapi sits near the Arabian Sea coast, takes a heavy four-month monsoon and lives inside a working chemical estate. Three local conditions change the engineering, and a vendor who ignores them quotes you less now and delivers less for twenty-five years.

A heavy, concentrated monsoon

Vapi receives roughly 1,400 mm of rain a year and almost all of it lands between June and September, with July alone averaging around 469 mm. That means sustained wet loading, waterlogged terraces and wind gusts against the array. Roof penetrations must be sealed and flashed properly, cable entries must drain, and the structure needs real foundation design. Expect a genuine dip in output through July and August, and size on the annual figure.

Coastal salt mist and corrosion

The sea is close enough that salt-laden air reaches rooftops in Vapi, Daman Road and the western villages. Salt attacks fasteners, clamps and module frames long before it touches the glass. Hot-dip galvanised structures, stainless fixings and properly sealed junction boxes are the difference between an array that lasts twenty-five years and one with rusted clamps by year six. This is the first thing a cut-price quote removes.

Industrial soiling and particulate fallout

Vapi's GIDC estate runs chemical, paper and packaging plants at scale, and particulate fallout settles on glass faster here than in a residential town. Soiling is the most underrated cause of weak output because it is invisible from ground level and shows up only as a slow decline in units. Roofs near the estate want cleaning every two to three weeks through the dry months. Our AMC covers the schedule.

Service area

Areas of Vapi we install in.

We install across Vapi town, the GIDC estate and the twelve villages merged into the municipal corporation in January 2025. We also cover the wider Valsad industrial belt, down to Sarigam and up to Pardi. An area missing from this list is not an area we refuse, so call and ask.

Vapi town and central Pin 396191

Chala · Chala Road · Imran Nagar · Kanchan Nagar · Koliwad Road · Tokarkhada · Patel Nagar · Shanti Nagar · Vapi Char Rasta · Vapi railway station area · Vapi bus stand area · Vapi–Daman Road · Silvassa Road

GIDC Vapi and Gunjan Pin 396195

GIDC Phase I · GIDC Phase II · GIDC Phase III · GIDC Phase IV · Gunjan · Gunjan Char Rasta · GIDC Housing Sector · Indraprastha Complex area · Chanod · Chanod Colony · Koparli Road · Vapi Industrial Estate

Villages inside the municipal corporation Pin 396191

Balitha · Salvav · Morai · Namdha · Chandor · Chhiri · Charwada · Vatar · Kunta · Tarakpardi · Mota Pondha · Rata · Pandor · Karaya

Outer Vapi and the Valsad industrial belt Pin 396193, 396125, 396155, 396105, 396020

Dungra · Karvad · Lavachha · Moti Tambadi · Nani Tambadi · Pardi · Killa Pardi · Sarigam · Sarigam GIDC · Bhilad · Atul · Valsad

Customers

Real customers, real cities.

Real Heaven Green Energy customers, each shown with the city their system was actually installed in. We do not relabel a customer to match the page you happen to be reading.

★★★★★
250 kW industrial system on our chemical plant. Generation has been 8% above estimate every month. Their O&M team is responsive.
Sanjay Joshi
Industrial · Bharuch · 250 kW
★★★★★
150 kW at our textile factory dropped power costs by 68%. The ROI calculation they provided was spot-on, break-even under 4 years.
Mihir Shah
Commercial · Surat · 150 kW
★★★★★
My electricity bill dropped from ₹7,800 to less than ₹400 in two months. PM Suryaghar paperwork, DISCOM approval, net meter, they handled everything.
Rameshbhai Patel
Residential · Surat · 5 kW
Before you sign

Six things to check on any Vapi quote.

Including ours. Take this list to every vendor you speak to.

Questions

Solar in Vapi: every question answered.

17 questions Vapi buyers actually search for, including the ones competing pages leave out. Grouped so you can skip to what you need.

Cost & subsidy

What is the cost of solar panel installation in Vapi in 2026?
Indicative installed market ranges, all before subsidy, are ₹1.25 to ₹1.55 lakh for 2 kW and ₹1.80 to ₹2.25 lakh for 3 kW. For 5 kW expect ₹2.85 to ₹3.45 lakh, and for 10 kW ₹5.20 to ₹6.30 lakh. Structure quality, protection specification and roof access drive the spread.
What does a 3 kW solar system cost in Vapi after subsidy?
Roughly ₹1.02 lakh to ₹1.47 lakh net, from ₹1.80 to ₹2.25 lakh less the ₹78,000 subsidy. A 3 kW system generates 360 to 405 units a month in Vapi, which covers a household using 300 to 400 units. It is the smallest system earning the full subsidy.
How much solar subsidy do I get in Vapi?
Up to ₹78,000. Per pmsuryaghar.gov.in, PM Surya Ghar pays ₹30,000 per kW for the first 2 kW and ₹18,000 for the third, with nothing beyond that. So 2 kW earns ₹60,000 and 3 kW or larger earns ₹78,000. Government credits it straight to your bank account.
Can I buy solar on EMI or a loan in Vapi?
Yes. Residential rooftop solar falls under priority-sector lending, so banks and NBFCs finance it. Most households finance the pre-subsidy amount, then prepay principal once the subsidy lands. We can introduce financing partners, though comparing their terms against your own bank is the smarter move.

Net metering & DISCOM

Which DISCOM serves Vapi for rooftop solar?
Dakshin Gujarat Vij Company Limited, DGVCL, the South Gujarat discom headquartered in Surat and covering Valsad district through its Valsad circle. Your net-metering application and your PM Surya Ghar portal entry must both name DGVCL as the licensee, or the file will not progress.
Is the process the same in Vapi, Daman and Silvassa?
No, and this trips up buyers along the whole belt. Vapi is DGVCL under GERC. Daman and Silvassa sit in the Union Territory of Dadra and Nagar Haveli and Daman and Diu, served by the UT's own distribution company and regulated by JERC. Different licensee, different forms, different timelines.
How long does DGVCL net metering take in Vapi?
Usually a few weeks from application to installed bidirectional meter, covering feasibility, post-installation inspection and the meter swap. Installation is only days of that. The discom-controlled steps set the pace and no installer can compress them, so treat a guaranteed one-week net meter as a red flag.
What happens to the extra units my Vapi system exports?
They are credited against units you draw at night and through the monsoon. Under the GERC framework your system is capped at your sanctioned load and all consumer categories may apply. A strong March to May surplus banks usefully against the July and August dip.

Sizing & performance

How many units does 1 kW of solar generate per day in Vapi?
About 4 to 4.5 units daily, averaged across the year. Vapi gets roughly 5.5 peak sun hours, which is a strong resource. Output runs well above that average from February to May and drops sharply during the June to September monsoon, so annual generation is the honest number.
What size system does a 2 BHK or 3 BHK home in Vapi need?
A 2 BHK usually needs 2 to 3 kW and a 3 BHK 3 to 5 kW, but size against consumption, not floor plan. Take the units from twelve months of DGVCL bills and pick the system that covers your average month rather than your worst one.
Will solar work through the Vapi monsoon?
Yes, at reduced output, because modules generate from diffuse light. Vapi's monsoon is heavy and concentrated, with July averaging around 469 mm, so expect a real dip. Net metering is what makes this work: dry-season exports bank as credits that offset the wet months.
How much roof area do I need for solar in Vapi?
Roughly 90 to 100 sq ft of genuinely shadow-free area per kW, so about 300 sq ft for 3 kW and 500 sq ft for 5 kW. Shadow-free is the operative word. An elevated structure recovers usable area on a congested terrace and improves airflow under the modules.

Installation & service

How long does solar installation take in Vapi?
Two to four days on a typical residential roof, longer on an industrial shed. The whole process, from survey and proposal through the portal and DGVCL applications to inspection and net meter, runs several weeks, with the discom steps as the variable. We name which steps are ours at proposal stage.
What maintenance do solar panels need in Vapi?
Mainly cleaning, and more of it than inland towns need. Particulate fallout from the GIDC estate builds a soiling layer that cuts output with no visible fault. Clean every two to three weeks through the dry months. Check fasteners, clamps and earthing twice yearly for salt corrosion. Our AMC covers both.
Can a GIDC factory shed take a rooftop system?
Usually yes. Large shed spans and daytime load profiles suit solar well, and we handle wind-load structural design, DGVCL registration and long-term O&M. The limits are purlin condition, sheet age and your sanctioned load, all of which the survey checks before we quote.

About Heaven Green

Does Heaven Green Energy have an office in Vapi?
No. Our headquarters is at Mota Varachha, Surat. We serve Vapi and South Gujarat through our channel partner network and field engineering team, who run surveys, supervise installation, handle DGVCL coordination and provide after-sales service on the ground. No local branch, and we say so before you sign.
What equipment does Heaven Green Energy install in Vapi?
Adani Solar modules, as an authorised distributor, with traceable serial numbers and full manufacturer warranty. Inverters are Qbits, our own brand, manufactured in-house, so service runs through us. Mounting structures are specified for coastal exposure rather than to a generic inland standard.
Nearby

We also install around Vapi.

Every city we cover is listed in the solar by location directory.

Free Vapi site survey No advance payment, no obligation Get my quote
Call WhatsApp