Solar panel installation in Vasai-Virar.

Heaven Green Energy is an authorised channel partner of Adani and a PM Surya Ghar empanelled vendor. For homes in Vasai-Virar, we size your system against your actual MSEDCL bill and install it. We file the net-metering application with Mahavitaran's Vasai circle and claim your ₹78,000 central subsidy. You sign. We do the rest.

Authorised Adani Solar distributor₹78,000 subsidy handled end-to-endMSEDCL net metering filed for youSalt-belt structure specification

Get your free Vasai-Virar solar quote

Send your bill and pin code. An engineer calls back with system size, cost after subsidy and payback, usually within two working hours.

Free site survey. No advance payment.

Prefer to talk? +91 63904 05060

Distribution licensee
MSEDCL (Mahavitaran), Vasai circle
Not Adani Electricity, Tata Power or BEST
Regulator
MERC
Sets the net-metering framework
Solar resource
About 4.8 peak sun hours
Konkan coast, long monsoon
Generation
3.8 to 4.2 units per kW daily
Annual mean, shadow-free roof
Central subsidy
Up to ₹78,000
Residential, 3 kW and above
Typical payback
3.5 to 5 years
Residential on-grid

The short answer

Rooftop solar in Vasai-Virar costs roughly ₹2.00 lakh to ₹2.50 lakh for 3 kW and ₹3.10 lakh to ₹3.80 lakh for 5 kW before subsidy. The ₹78,000 PM Surya Ghar subsidy cuts the 3 kW figure to about ₹1.22 lakh to ₹1.72 lakh. Each kW makes 3.8 to 4.2 units a day here. MSEDCL handles net metering. Payback runs three and a half to five years.

Last reviewed 18 September 2026 · Heaven Green Energy engineering team

Price, size and savings

Find your bill. Read across.

Most Vasai-Virar solar pages hide the price behind a callback form or quote a national average that ignores the Konkan coast entirely. This table answers the question outright. Find your monthly bill on the left, then read across for system size, monthly output, shadow-free roof area, payback and what the system costs once the subsidy is deducted.

Indicative Vasai-Virar market ranges, 2026
Your monthly bill System Generates Roof needed Cost after subsidy Payback
Up to ₹1,800 2 kW 1–2 BHK, one AC used sparingly 225–250units/month ~200 sq ft ₹80,000 – ₹1.15 lakh ₹1.40 lakh–₹1.75 lakh before ₹60,000 subsidy 3.5–4.5 years
₹2,000–₹3,500 3 kW Best value The largest system that still earns the full ₹78,000 340–375units/month ~300 sq ft ₹1.22 lakh – ₹1.72 lakh ₹2.00 lakh–₹2.50 lakh before ₹78,000 subsidy 3.5–4.5 years
₹3,500–₹6,000 5 kW 3 BHK running two ACs through summer 565–625units/month ~500 sq ft ₹2.32 lakh – ₹3.02 lakh ₹3.10 lakh–₹3.80 lakh before ₹78,000 subsidy 4–5 years
₹6,000–₹13,000 10 kW Bungalows, clinics, shops, coaching institutes 1,130–1,250units/month 700–1,000 sq ft ₹4.87 lakh – ₹6.12 lakh ₹5.65 lakh–₹6.90 lakh before ₹78,000 subsidy 4–5 years
Above ₹13,000 25 kW+ Commercial connections, on accelerated depreciation 2,825–3,125units/month Site-specific ₹11.50 lakh – ₹14.50 lakh ₹11.50 lakh–₹14.50 lakh, no subsidy 3–4.5 years

Indicative Vasai-Virar market ranges for 2026, covering Tier-1 modules, a branded inverter, galvanised structure, protection and installation. These are not a Heaven Green quotation. Subsidy amounts are the central PM Surya Ghar figures published on pmsuryaghar.gov.in. Generation assumes a shadow-free, roughly south-facing roof.

Size against units, not rupees. Take the units figure off your last MSEDCL bill rather than the amount, because units are what a system cancels. Shadow-free is the operative word in the roof column. In Nalasopara and Virar East, towers sit close and lift rooms and overhead tanks crowd the terrace. There, two hours of afternoon shade costs more output than buyers expect, and an elevated structure earns its extra steel.

The 3 kW cliff is real. Subsidy covers roughly 31 to 39% of a 3 kW system but only 11 to 14% of a 10 kW one, because nothing is paid above 3 kW. On a borderline bill, 3 kW returns more rupees per rupee spent.

A cheap coastal quote is cheap in the metal. This is salt-mist country. Hot-dip galvanising thickness, fastener grade, cable gauge and enclosure sealing are the first things a low quote thins. They are exactly what decides whether your structure is sound in year twelve. Ask for a written Bill of Materials with make, model and quantity, and ask specifically what the structure and clamps are coated with.

One local warning. Plenty of quotes in this belt are written by traders who subcontract the roof work and disappear after commissioning. Ask who actually installs, who holds the AMC, and who attends the MSEDCL inspection. Those three answers should name the same organisation.

Why there is no rupee saving in that table

You will notice no rupee saving in that table. The rupee figure depends on the tariff slab you personally sit in, printed on your own MSEDCL bill and different from your neighbour's, so we will not guess it here. Bring your last bill to the free survey and we will work the exact number out with you, in front of you. Bring twelve months if you have them, because one bill from a monsoon month will size the system wrong. Prefer to work it out yourself first? Put your bill into our solar savings calculator. No phone number required.

This is what we actually build.

Heaven Green Energy installations across India. Not stock photography, and not renders. Your Vasai-Virar system is built to the same specification.

Rooftop solar array photographed against a city skyline at sunset
Residential rooftop
Long row of solar modules on a commercial building rooftop photographed at sunrise
Commercial rooftop
Elevated solar canopy structure mounted above a terrace, leaving the floor below usable
Elevated structure
Wall of dozens of string inverters mounted in neat rows at a large solar installation
Electricals

PM Surya Ghar Muft Bijli Yojana

₹78,000

Maximum central subsidy for a residential rooftop system.

  • ₹30,000 per kW for the first 2 kW
  • ₹18,000 for the 3rd kW
  • Nothing paid above 3 kW
  • Credited directly to your bank account
  • We file the entire claim for you
How the subsidy works

Five steps, and we run four of them.

Anyone advertising a bigger "Vasai-Virar subsidy" is describing something that does not exist. PM Surya Ghar is a central scheme, so the amount is identical in every Indian city. What changes locally is who processes your application and inspects the work, and here that is MSEDCL's Vasai circle.

1

Register on the National Portal

You register at pmsuryaghar.gov.in with your MSEDCL consumer number, mobile, Aadhaar and address. We sit with you for this step, because a consumer number that does not match Mahavitaran records is the commonest reason an application stalls for weeks.

2

Apply for feasibility, then pick your vendor

MSEDCL checks the application against your sanctioned load and the local distribution transformer. You then select an empanelled vendor. Heaven Green Energy is empanelled, so we map straight onto your application without a second registration.

3

Install after approval, never before

We supply Adani modules with traceable serial numbers and hand you a Bill of Materials with the warranty schedule. Installing ahead of feasibility approval is how Vasai roofs end up with hardware they cannot get a net meter for.

4

Inspection and net meter

MSEDCL inspects the installation and fits the bidirectional meter, then raises the commissioning certificate on the portal. Our engineer attends the inspection so queries about earthing or protection are answered on the spot.

5

Claim and credit

We file the claim once the certificate issues, and the government credits the subsidy directly to your bank account. It never passes through us. Treat any vendor who offers to collect the subsidy on your behalf as a warning sign.

If you are a business, this section does not apply

PM Surya Ghar covers residential consumers only. The gala owners and small manufacturers in Waliv, Sativali and Gauraipada cannot claim it. They claim accelerated depreciation on the asset instead, which for a taxpaying unit often returns more than the residential subsidy would have paid.

MSEDCL (Mahavitaran)

Net metering: who you actually file with.

Net metering is where Vasai-Virar pages get careless. Naming the wrong licensee sends your file to a utility that holds no connection in your name, and costs you every export credit you were counting on.

Vasai-Virar is supplied by Maharashtra State Electricity Distribution Company Limited (MSEDCL), trading as Mahavitaran. Your connection sits in Mahavitaran's Vasai circle, with the Virar and Vasai O&M divisions under it, in the Konkan region. Vasai-Virar is part of the Mumbai Metropolitan Region, which is where the confusion starts. Adani Electricity, Tata Power and BEST serve the island city and suburbs, but none of them supplies you. Bhiwandi nearby runs on a Torrent Power distribution franchise, which is again a different arrangement. If a page tells you to apply to Adani Electricity because you are "in Mumbai", it will send your file to a utility that has no connection in your name.

Commercial terms come from the Maharashtra Electricity Regulatory Commission (MERC), not from the discom and not from us. Under MERC's grid-interactive rooftop regulations, your system is capped at your sanctioned load and every consumer category may apply. Residential systems up to 10 kW of sanctioned load are exempt from grid support charges. Surplus units you export are credited against what you draw at night and through the monsoon.

1

Application

Consumer details, sanctioned load, system rating, single-line diagram and equipment datasheets go to the MSEDCL Vasai circle office covering your sub-division.

Filed by us
2

Technical feasibility

Mahavitaran tests whether your sanctioned load and local transformer carry the proposed capacity. Oversized systems fail here, so we size against sanctioned load on the first visit.

MSEDCL
3

Installation and inspection

We install. MSEDCL inspects earthing, protection, isolation and metering compliance before anything is energised.

Us, then MSEDCL
4

Bidirectional meter

Your meter is swapped for a bidirectional net meter and the commissioning certificate issues. Export credits start accruing from that date, not from installation.

MSEDCL
Solar panels installed flush on a corrugated metal factory roof with industrial buildings behind
Not a home?

Solar for Vasai-Virar's businesses.

Running a gala in the Waliv belt, a workshop, a nursery or a clinic rather than a home? The economics work differently and the rest of this page is written for homeowners.

The manufacturing belt east of the highway takes in Waliv, Sativali, Gauraipada, Golani Naka, Gokhivare, Navghar and Chinchpada, plus the smaller Papdy estate on the west side. That belt gets no PM Surya Ghar subsidy. Those units claim accelerated depreciation on the asset, which for a taxpaying business often beats what the residential subsidy pays. They can also skip capital outlay entirely through OPEX or RESCO models.

Most of this belt is multi-storey gala stock rather than standalone sheds, so the roof is shared and the metering question is settled before the engineering one. We handle that: roof rights, common-area allocation, structural design to coastal wind-load standards, MSEDCL registration and long-term O&M.

The green belt around the towns is a separate case. Vasai's villages still grow sonchafa and other flowers, bananas, betel leaf, coconut and chikoo, and those growers run pumps, cold rooms and packing sheds on agricultural or LT commercial connections. Sizing there follows the pump duty cycle and the picking season, not a household bill, so we survey the load pattern before proposing anything.

Why us

Why Vasai-Virar customers choose Heaven Green Energy

We have built solar since 2017 and delivered more than 10,000 installations across India, from single terraces to industrial plants running into hundreds of kilowatts. On the coast, that experience shows up in the hardware specification rather than in the sales pitch.

Authorised Adani Solar distributorGenuine Adani modules, traceable serial numbers, full manufacturer warranty. No grey-market stock, and no badge-engineered brand that disappears in year eight when a claim actually matters.
We build our own invertersQbits is our in-house inverter brand, so service on the component most likely to need it runs through us rather than through an importer's ticket queue.
Specified for the salt beltCoastal sites get coastal hardware: galvanising thickness, fastener grade and enclosure sealing chosen for salt mist, not copied from an inland Bill of Materials.
The paperwork is our jobPortal registration, vendor mapping, MSEDCL feasibility and net metering, inspection and the subsidy claim all sit with our team. You sign, and you attend the survey.

Where we are based

Heaven Green Energy is headquartered at Mota Varachha, Surat. We serve Vasai-Virar and the wider Konkan belt through our channel partner network and field engineering team, who run the surveys, supervise installation and handle MSEDCL coordination on the ground. There is no Heaven Green office in Vasai-Virar, and we say so before you sign rather than after.

How we work

From first call to a spinning net meter.

Four steps from the first phone call to a spinning net meter, including the parts of the timeline that belong to MSEDCL rather than to us.

01

Free site survey

We measure shadow-free terrace area, check the slab and parapet, and read your sanctioned load and twelve months of MSEDCL units. We also log shading from tanks, lift rooms and the next tower.

Day 1–2
02

Written proposal

System size, layout, Bill of Materials with makes and models, generation estimate at Vasai-Virar irradiance, your subsidy and payback. No obligation, and you keep the document.

Day 3–5
03

Applications and installation

We file with the national portal and MSEDCL, then install once feasibility clears. A typical residential terrace takes two to four working days.

Day 5–15
04

Inspection, meter, subsidy

Mahavitaran inspects, fits the bidirectional meter and issues the commissioning certificate. We then file your claim and the government pays into your account.

Set by MSEDCL

What Vasai-Virar weather does to a solar system

A system specified for inland Maharashtra is the wrong system for this coast. Three local conditions change the engineering here, and a vendor who ignores them quotes you less now and delivers less for the next twenty-five years. Ask about all three before you sign.

Salt mist on everything metal

You are a few kilometres from the Arabian Sea and the creek, and the air carries salt. Salt attacks fasteners, clamps and module frames long before it touches the glass. Hot-dip galvanised structure with adequate coating thickness, stainless fixings and properly sealed junction boxes are not upgrades here, they are the baseline. Thin coatings look identical on day one and rust through by year six.

A long, heavy monsoon

Vasai-Virar takes roughly 2,000 to 2,300 mm of rain a year, and around 95% of it falls between June and September. July alone can deliver over 800 mm. Generation drops hard through those months, which is why sizing must bank a March-to-May surplus as export credit rather than chase a single good month. Drainage, cable routing and mounting-point sealing matter more than they do inland. Pre-monsoon squalls in May are the other thing to plan for.

Humidity and cyclonic wind

Relative humidity runs near 89% in July and stays high most of the year, which accelerates corrosion and stresses inverter enclosures. The coast also takes cyclonic disturbances in the monsoon window. Foundation design, fastener grade and wind-load calculation keep the array on the roof, and surge protection with proper earthing guards the inverter, the costliest component you will ever replace.

Service area

Areas of Vasai-Virar we install in.

We install across the four towns VVCMC brought together in 2010, Vasai, Virar, Nalasopara and Navghar-Manikpur, plus Naigaon and the villages between them. An area missing from this list is not an area we refuse, so call and ask.

Virar East & West Pin 401303, 401305, 401301

Bolinj · Manvelpada · Chandansar · Narangi · Phoolpada · Bapane · Agashi · Arnala · Global City · Virat Nagar · Tirupati Nagar · Yashwant Nagar · Jivdani Road · Viva College Road

Nalasopara East & West Pin 401203, 401209

Tulinj Road · Achole Road · Achole Gaon · Santosh Bhuvan · Moregaon Talao · Ostwal Nagari · Nilemore · Vijay Nagar · Central Park · Alkapuri · Shree Prastha · Pelhar · Bilalpada · Evershine City

Vasai West & Vasai Gaon Pin 401201, 401202, 401207

Ambadi Road · Manickpur · Navghar · Papdy · Diwanman · Bhabola · Chulna · Bhuigaon · Umela · Stella · Vasai Gaon · Sandor · Suyog Nagar · Vasai Road West

Vasai East, Naigaon & the industrial belt Pin 401208, 401209

Waliv · Sativali · Gauraipada · Golani Naka · Gokhivare · Chinchpada · Valiv · Dhumal Nagar · Naigaon East · Naigaon West · Juchandra · Tivri · Chandrapada · Sasunavghar · Maljipada

Customers

Real customers, real cities.

These are real Heaven Green customers, shown with the city each system was actually installed in. We do not relabel a review to whichever page you happen to be reading.

★★★★★
My electricity bill dropped from ₹7,800 to less than ₹400 in two months. PM Suryaghar paperwork, DISCOM approval, net meter, they handled everything.
Rameshbhai Patel
Residential · Surat · 5 kW
★★★★★
250 kW industrial system on our chemical plant. Generation has been 8% above estimate every month. Their O&M team is responsive.
Sanjay Joshi
Industrial · Bharuch · 250 kW
★★★★★
150 kW at our textile factory dropped power costs by 68%. The ROI calculation they provided was spot-on, break-even under 4 years.
Mihir Shah
Commercial · Surat · 150 kW
Before you sign

Six things to check on any Vasai-Virar quote.

Including ours. Take this list to every vendor you speak to.

Questions

Solar in Vasai-Virar: every question answered.

17 questions Vasai-Virar buyers actually search for, including the ones competing pages leave out. Grouped so you can skip to what you need.

Cost & subsidy

What is the cost of solar panel installation in Vasai-Virar in 2026?
Before subsidy, expect roughly ₹1.40 to ₹1.75 lakh for 2 kW, ₹2.00 to ₹2.50 lakh for 3 kW and ₹3.10 to ₹3.80 lakh for 5 kW. For 10 kW, budget ₹5.65 to ₹6.90 lakh. Structure specification, protection and terrace access drive the spread more than the panel brand does.
What is the price of a 3 kW solar system in Vasai-Virar with subsidy?
Between ₹1.22 lakh and ₹1.72 lakh net, from ₹2.00 to ₹2.50 lakh less the ₹78,000 subsidy. A 3 kW system makes 340 to 375 units a month here, which covers a household using around 300 to 350 units. It is the smallest system earning the full subsidy.
How much subsidy do I get on solar panels in Vasai-Virar?
Up to ₹78,000. Per pmsuryaghar.gov.in, PM Surya Ghar pays ₹30,000 per kW for the first 2 kW and ₹18,000 for the third, with nothing beyond. So 1 kW earns ₹30,000, 2 kW earns ₹60,000, and 3 kW or larger earns ₹78,000, credited to your bank account.
Why is solar slightly costlier in Vasai-Virar than in inland Maharashtra?
Two reasons. Access and society compliance cost more in high-rise stock, where material goes up by lift and work is scheduled around residents. Second, coastal sites need heavier galvanising, better fastener grade and sealed enclosures against salt mist. That specification is a real cost, not a markup, and skipping it shortens the structure's life.

Net metering & DISCOM

Which DISCOM serves Vasai-Virar for rooftop solar?
MSEDCL, Maharashtra State Electricity Distribution Company Limited, trading as Mahavitaran, through its Vasai circle in the Konkan region. Vasai-Virar sits in the Mumbai Metropolitan Region but is not supplied by Adani Electricity, Tata Power or BEST. Applying to any of those three will not process your connection. Bhiwandi's Torrent Power franchise next door is a different arrangement again.
Is net metering available in Vasai-Virar, and what happens to my extra units?
Yes. Under the MERC framework your system may be sized up to your sanctioned load and every consumer category may apply. Your home uses solar first by day and exports the surplus to MSEDCL as credit, so a strong March to May surplus banks against the June to September monsoon dip.
How long does MSEDCL net metering take in Vasai-Virar?
A few weeks from application to installed bidirectional meter, covering feasibility, post-installation inspection and the meter swap. Installation is only days of that. The discom-controlled steps set the pace and no installer can compress them, so treat a guaranteed one-week net meter as a red flag.
Do I need MSEDCL approval before installing solar in Vasai-Virar?
Yes, for any grid-connected system, which is nearly every rooftop. The order is application, feasibility approval, installation, then inspection and meter. Installing first is how roofs end up generating with no export credit, and how oversized systems get rejected outright. We file in the correct order.

Sizing & performance

How many units does 1 kW of solar generate per day in Vasai-Virar?
About 3.8 to 4.2 units daily, averaged over the year, at roughly 4.8 peak sun hours. That is below Gujarat and inland Maharashtra because the Konkan monsoon is longer and heavier. Over a year expect around 1,380 to 1,530 units per kW, strong from January to May and weak from June to September.
What size solar system do I need for a 2 BHK or 3 BHK flat in Vasai-Virar?
A 2 BHK usually needs 2 to 3 kW and a 3 BHK 3 to 5 kW, but size against consumption, not floor plan. Take the units from twelve months of MSEDCL bills and pick the system that covers your average month. Flats also need clear roof rights from the society first.
How many ACs can run on a 3 kW or 5 kW solar system here?
A 1.5-ton split AC draws 1.2 to 1.5 units per hour while the compressor runs. A 3 kW system making 11 to 13 units a day supports one AC by day plus normal household load. Two ACs through a humid Vasai-Virar summer needs 5 kW. At night you draw grid power against banked credits.
Does the monsoon stop solar generation in Vasai-Virar?
It reduces it, it does not stop it. Panels still produce in diffuse light, but July and August output can fall well below the annual average because roughly 95% of the year's rain lands in that window. Net metering exists precisely for this: the dry-season surplus banks as credit against the monsoon months. Plan the system around the annual total, and treat a vendor quoting only peak-month output as optimistic.

Installation & service

Can I install solar on a flat in a Vasai-Virar housing society?
Yes, with written permission for the terrace from the society. The usual routes are a society-wide system on common metering, or an individual allocation of terrace space with your own net meter. We prepare the drawings and load calculations the committee asks for before any hardware is ordered. Get the permission in writing, with the allocated area described, before paying any advance.
How often do panels need cleaning in Vasai-Virar?
Every three to four weeks in the dry months, and more often if you are near the highway or the industrial belt east of it, where dust settles fast. Monsoon rain rinses the glass but leaves salt and grime at the frame edges, so a wash after the rains matters. Our AMC covers it.
How long does installation take, and what does it disturb?
Two to four working days on a typical residential terrace, plus the inspection and meter swap, which MSEDCL schedules. Drilling and material lifting happen in working hours. There is a short supply shutdown when the net meter is changed, and Mahavitaran sets that date, not us.

About Heaven Green

Does Heaven Green Energy have an office in Vasai-Virar?
No. Our only office is at Mota Varachha, Surat. We serve Vasai-Virar through channel partners and our field engineering team, who run the surveys, supervise installation and coordinate with MSEDCL on the ground. We state that up front because several vendors imply a local branch that does not exist.
What equipment does Heaven Green Energy install?
Adani Solar modules, as an authorised distributor with traceable serial numbers and full manufacturer warranty, paired with Qbits inverters, which we manufacture in-house. Structure and protection are specified for coastal exposure. Every item appears on your Bill of Materials with make, model and quantity before you commit.
Nearby

We also install around Vasai-Virar.

Every city we cover is listed in the solar by location directory.

Free Vasai-Virar site survey No advance payment, no obligation Get my quote
Call WhatsApp