Solar panel installation in Anand.

Heaven Green Energy is an authorised channel partner of Adani and a PM Surya Ghar empanelled vendor. In Anand we read your actual MGVCL bill, size the system against your units, install it, file the net-metering application with MGVCL and claim your ₹78,000 central subsidy. You do not chase a single form.

Authorised Adani Solar distributor₹78,000 subsidy handled end-to-endMGVCL net-metering filings includedFree survey, no advance payment

Get your free Anand solar quote

Send your MGVCL bill and your area name. An engineer calls back with system size, cost after subsidy and payback, usually inside two working hours.

Free site survey. No advance payment.

Prefer to talk? +91 63904 05060

Distribution licensee
MGVCL
Madhya Gujarat Vij Company Limited
Regulator
GERC
Sets the net-metering framework MGVCL follows
Solar resource
About 5.5 peak sun hours
Among the strongest bands in India
Generation
4 to 4.5 units per kW daily
Annual average, shadow-free roof
Central subsidy
Up to ₹78,000
Residential consumers, 3 kW and above
Typical payback
3.5 to 5 years
Residential on-grid

The short answer

Rooftop solar in Anand costs roughly ₹1.80 lakh to ₹2.25 lakh for 3 kW and ₹2.85 lakh to ₹3.45 lakh for 5 kW before subsidy. The ₹78,000 PM Surya Ghar subsidy brings the 3 kW figure down to about ₹1.02 lakh. Each kilowatt makes 4 to 4.5 units a day here. MGVCL is the licensee and fits the net meter. Payback runs three and a half to five years.

Last reviewed 18 September 2026 · Heaven Green Energy engineering team

Price, size and savings

Find your bill. Read across.

Most Anand solar pages advertise a rupees-per-watt number with no system attached to it. That figure tells you nothing you can buy. Find your monthly bill in the left column instead. Then read across for the size that matches it, the units it makes here, the roof it needs and the cost after subsidy.

Indicative Anand market ranges, 2026
Your monthly bill System Generates Roof needed Cost after subsidy Payback
Up to ₹1,800 2 kW 1–2 BHK, one AC used sparingly 240–270units/month ~200 sq ft ₹65,000 – ₹95,000 ₹1.25 lakh–₹1.55 lakh before ₹60,000 subsidy 3.5–4.5 years
₹2,000–₹3,500 3 kW Best value The largest system that still earns the full ₹78,000 360–405units/month ~300 sq ft ₹1.02 lakh – ₹1.47 lakh ₹1.80 lakh–₹2.25 lakh before ₹78,000 subsidy 3.5–4.5 years
₹3,500–₹6,000 5 kW 3 BHK running two ACs through summer 600–675units/month ~500 sq ft ₹2.07 lakh – ₹2.67 lakh ₹2.85 lakh–₹3.45 lakh before ₹78,000 subsidy 4–5 years
₹6,000–₹13,000 10 kW Bungalows, clinics, shops, coaching institutes 1,200–1,350units/month 700–1,000 sq ft ₹4.42 lakh – ₹5.52 lakh ₹5.20 lakh–₹6.30 lakh before ₹78,000 subsidy 4–5 years
Above ₹13,000 25 kW+ Commercial connections, on accelerated depreciation 3,000–3,400units/month Site-specific ₹10.75 lakh – ₹13.50 lakh ₹10.75 lakh–₹13.50 lakh, no subsidy 3–4.5 years

These are indicative market ranges for Anand in 2026, covering Tier-1 modules, a branded inverter, a galvanised mounting structure, protection gear and installation labour. They are not a Heaven Green Energy quotation, and no price is firm until a survey is done on your roof. Subsidy amounts are the central PM Surya Ghar figures published on pmsuryaghar.gov.in. Generation assumes a shadow-free, roughly south-facing roof.

Size against units, not rupees. Your MGVCL bill prints both, and only the units figure holds still. Take twelve months of readings, work out the monthly average, then pick the system that covers it. Rupee totals move with slab rates and fuel charges, so a system sized off the amount is sized off a moving target. The roof column says shadow-free for a reason. An overhead water tank, a stair room or a neighbour's parapet taking two hours of morning sun costs you more output than any brochure will admit.

The 3 kW cliff decides most Anand residential orders. PM Surya Ghar pays ₹30,000 for each of the first two kilowatts and ₹18,000 for the third. Past that it pays nothing at all. So the subsidy covers 35 to 43% of a 3 kW system and only 12 to 15% of a 10 kW one. If your household average sits between 350 and 450 units, 3 kW returns more per rupee spent than anything bigger.

A cheap Anand quote is cheap in the steel, not the glass. Buyers here compare modules and stop. The first line a bottom-of-market quote thins is galvanising thickness and fastener grade, then cable gauge, earthing and surge protection. That matters on the open, flat-land roofs around Lambhvel, Jitodia and the Karamsad edge, where nothing breaks the wind. Ask for a written Bill of Materials naming make, model and quantity on every line. Without it you are comparing two numbers, not two systems.

Why there is no rupee saving in that table

The table carries no rupee saving figure, and that is deliberate. What you save depends on the slab you personally sit in, your sanctioned load and your connection category. A dairy chilling unit on an LT commercial tariff saves at a completely different rate from a household in Sardarganj. Guessing it here would be dishonest. Bring your last MGVCL bill to the free survey and we work the number out in front of you, on your own readings. We show the arithmetic rather than quoting a headline percentage at you. Prefer to work it out yourself first? Put your bill into our solar savings calculator. No phone number required.

This is what we actually build.

Heaven Green Energy installations across India. Not stock photography, and not renders. Your Anand system is built to the same specification.

Rooftop solar array photographed against a city skyline at sunset
Residential rooftop
Long row of solar modules on a commercial building rooftop photographed at sunrise
Commercial rooftop
Elevated solar canopy structure mounted above a terrace, leaving the floor below usable
Elevated structure
Wall of dozens of string inverters mounted in neat rows at a large solar installation
Electricals

PM Surya Ghar Muft Bijli Yojana

₹78,000

Maximum central subsidy for a residential rooftop system.

  • ₹30,000 per kW for the first 2 kW
  • ₹18,000 for the 3rd kW
  • Nothing paid above 3 kW
  • Credited directly to your bank account
  • We file the entire claim for you
How the subsidy works

Five steps, and we run four of them.

PM Surya Ghar is a central scheme, so Anand has no larger local slab and no special district rate. Anyone advertising an Anand-only subsidy is describing something that does not exist. What is local is the utility that processes your file, and in Anand that is MGVCL from start to finish.

1

Register on the National Portal

You register at pmsuryaghar.gov.in with your consumer number, mobile, Aadhaar and address. Select MGVCL as your discom, and copy the consumer number exactly as it prints on your bill. A single wrong digit stalls the file at feasibility. We sit with you for this step rather than emailing you a link.

2

Feasibility check by MGVCL

MGVCL checks your application against your sanctioned load before anything is bought. Your solar capacity cannot exceed that load, so if you want 5 kW on a 3 kW connection, the load enhancement is applied for first. We tell you that at the survey, not after your money has moved.

3

Pick an empanelled vendor, then install

You choose a vendor listed on the portal, and work begins only after feasibility clears. Heaven Green Energy is empanelled, so we map onto your existing application instead of asking you to re-register later under another name. Modules arrive with traceable serial numbers and an ALMM-listed model.

4

Inspection and the net meter

MGVCL inspects the installation, checks earthing, isolation and protection, then fits the bidirectional meter and issues the commissioning certificate on the portal. Our engineer attends that inspection, so anything queried is settled on the spot rather than by email a fortnight later.

5

Claim, then bank credit

We file the subsidy claim once the commissioning certificate issues, and the government credits the money straight to your bank account. It never passes through us. Treat any Anand vendor who offers to collect the subsidy for you, or to deduct it from the invoice, as a reason to walk.

If you are a business, this section does not apply

PM Surya Ghar covers residential consumers only. A milk chilling unit, a shop on Station Road, a clinic near Karamsad or a workshop in Vithal Udyognagar cannot claim it. Businesses claim accelerated depreciation on the asset instead, which for a taxpaying entity frequently returns more than the residential subsidy would have paid.

MGVCL (Madhya Gujarat Vij)

Net metering: who you actually file with.

Anand sits in MGVCL territory, not DGVCL, UGVCL, PGVCL or Torrent Power. Rival pages get this wrong constantly, and a filing lodged with the wrong licensee costs you every export credit you were counting on.

Your licensee is Madhya Gujarat Vij Company Limited (MGVCL), the state-owned Central Gujarat discom headquartered at Vadodara. It is one of the four distribution subsidiaries of Gujarat Urja Vikas Nigam Limited. MGVCL supplies six districts: Vadodara, Anand, Kheda, Panchmahal, Dahod and Chhota Udaipur. Anand city, Vallabh Vidyanagar, Karamsad, Vithal Udyognagar and the surrounding villages all bill through it.

The other three are easy to confuse and easy to check. DGVCL runs South Gujarat from Surat, UGVCL runs North Gujarat from Mehsana, and PGVCL runs Saurashtra and Kutch from Rajkot. Torrent Power is a private licensee and holds city licences in Ahmedabad, Gandhinagar and part of Surat. None of them touches Anand. Look at the header of your own bill before you believe any vendor: the name printed there is the office that must approve your system.

The framework itself is set by the Gujarat Electricity Regulatory Commission, which notified the net-metering rooftop solar regulations in 2016 and has amended them since. All four discoms work to the same rules. Your system capacity is capped at your sanctioned load. Residential, commercial, industrial and institutional consumers may all apply. Units you export are credited against units you import, and the settlement runs on your bill, not as a separate cheque.

1

Application and feasibility

We lodge the online application with MGVCL against your consumer number, attaching the layout, single-line diagram and equipment details. MGVCL confirms your sanctioned load and technical feasibility before any equipment is ordered.

Filed by us
2

Sanction and installation

MGVCL issues the feasibility sanction and we install to that approved capacity. Deviating from the sanctioned design, even upward, is the most common reason an Anand file gets rejected at inspection.

MGVCL
3

Inspection and electrical certificate

We arrange the Electrical Inspectorate certificate and hand the file to MGVCL. Their engineer inspects earthing, isolation, protection settings and inverter compliance, with our site engineer present.

Us, then MGVCL
4

Bidirectional meter and commissioning

MGVCL replaces your existing meter with a bidirectional net meter and issues the commissioning certificate. Export credits begin from that date. We then file your PM Surya Ghar subsidy claim.

MGVCL
Solar panels installed flush on a corrugated metal factory roof with industrial buildings behind
Not a home?

Solar for Anand's businesses.

Not a home? Anand has a daytime load profile that suits solar better than almost any city in Gujarat.

Dairy is the reason. Chilling, pasteurising, homogenising and cold storage draw hard through the middle of the day, which is exactly when a rooftop array produces most. The same is true of agro-processing, cattle-feed plants, cold chain units and the engineering and fabrication shops in the Vithal Udyognagar GIDC estate on the city edge. It also holds for the Anand GIDC units and the workshops along the Anand to Vallabh Vidyanagar road belt. Institutions carry the pattern too: Anand Agricultural University, IRMA, Sardar Patel University and the engineering colleges at Vallabh Vidyanagar run air conditioning, labs and pumps on a nine-to-five clock.

A commercial system is a tax decision as much as an energy one, and it is not eligible for PM Surya Ghar.

Why us

Why Anand customers choose Heaven Green Energy

We have installed since 2017 and passed 10,000 installations. In Anand that experience shows up in the boring parts: paperwork, structure and follow-up.

MGVCL filings are our job, not yoursWe lodge the net-metering application, attend the inspection and follow up until the bidirectional meter is fitted. You are not standing in a queue with a folder of drawings.
Equipment we are accountable forAdani Solar modules as an authorised distributor, and Qbits inverters manufactured in-house. When something needs attention we are not arguing with a third-party brand on your behalf.
A survey that catches shadowsAnand roofs are cluttered with tanks, parapets and stair rooms. The survey maps shading before sizing, because a system planned on a satellite image is a system planned on a guess.
Written scope, no advanceYou get a Bill of Materials listing make, model and quantity, and a warranty schedule at commissioning. The survey and the proposal cost nothing and carry no advance payment.

Where we are based

Heaven Green Energy is headquartered at Mota Varachha, Surat. We have no branch office in Anand. We serve Anand and the wider Central Gujarat region through our channel partner network and field engineering team. They run the surveys, supervise installation and handle MGVCL coordination on the ground. We state this before you sign rather than after.

How we work

From first call to a spinning net meter.

Four stages, and you can stop at any of the first three without paying anything.

01

Bill review and call back

Send your MGVCL bill and area name. An engineer works out your twelve-month unit average and calls with an indicative size and cost after subsidy.

Same day
02

Free site survey

We measure the usable shadow-free roof, check the structure, inspect the earthing and read your sanctioned load off the meter before proposing anything.

2 to 4 days
03

Proposal, portal and MGVCL filing

You get a written proposal with a Bill of Materials. We register you on the national portal and file the net-metering application with MGVCL.

1 to 2 weeks
04

Install, inspect, commission

Structure, modules, inverter, protection and cabling go up. MGVCL inspects, fits the bidirectional net meter and commissions the system. We then file your subsidy claim and follow it until the credit lands.

2 to 4 days on site

What Anand weather does to a solar system

Anand sits in the Charotar plain with a tropical savanna climate, a hard dry summer and a short, heavy monsoon. Two of those three cost you units if the system was specified carelessly. Here is what actually matters on a roof here.

Dust and field soiling

From February to May, roads here get almost no rain for months. The fields, kutcha approaches and cattle-shed dust around the villages put a fine film on glass within days. Soiling loss is gradual and invisible from the ground, which is why it goes unnoticed. Plan on a cleaning routine through the dry half of the year and fix the water access at design stage, not afterwards.

Heat derating in May

May is the hottest month in Anand and daily highs regularly run above 40 degrees. Every module loses output as its cell temperature climbs, so peak summer generation is lower per kilowatt than a spring morning, despite the longer day. Correct mounting height and airflow gap under the array matter more than the brochure efficiency figure a salesman quotes at you.

A short, heavy monsoon

Anand takes roughly 830 mm of rain a year and most of it lands between June and September, with July the wettest month by a wide margin. That means concentrated rainfall on a small number of days, not a long wet season. Waterproofing at every roof penetration, proper cable routing and an honest earthing design are what separate a system that survives it from one that trips.

Service area

Areas of Anand we install in.

We survey across Anand city, the Vallabh Vidyanagar and Karamsad belt, the GIDC estates and the surrounding villages. If your area is not listed, it is almost certainly still covered.

Anand city core Pin 388001, 388004

Sardarganj · Gamdi · Mangalpura · Popati Nagar · Jitodia · Rajodpura · Ganesh Chokdi · Amul Dairy Road · Station Road · District Court area · Motikaka Chali · Neelkanth Nagar · Lambhvel Road · 100 Feet Road

Vallabh Vidyanagar and the campus belt Pin 388120, 388121, 388110

Vallabh Vidyanagar · Nana Bazar, V.V. Nagar · Sardar Patel University campus · Birla Vishvakarma Mahavidyalaya area · G. H. Patel College of Engineering area · Vithal Udyognagar · Vithal Udyognagar GIDC estate · Anand to Vidyanagar Road · Bakrol Road · Anand Agricultural Institute · Hadgood

Karamsad, Bakrol and the western edge Pin 388305, 388310, 388315, 388320, 388325, 387310

Karamsad · Valasan · Bakrol · Chikhodra · Bedva · Adas · Ajarpura · Lambhvel · Boriavi · Vadtal Bakrol Road

Mogri, Mogar and the southern villages Pin 388340, 388345, 388355, 388360, 388365, 388205, 388210

Mogri · Mogar · Gana · Navli · Samarkha · Sarsa · Ode · Bhalej · Anand to Sojitra Road corridor

Customers

Real customers, real cities.

These are real Heaven Green Energy customers, shown with the city each system was actually installed in. We do not relabel a review to whichever city page you happen to be reading.

★★★★★
80 kW on our hospital rooftop. Diesel backup running time cut by 60%. Heaven Green's structural design cleared all wind-load checks first time.
Nilesh Bhatt
Commercial · Anand · 80 kW
★★★★★
Got the full ₹78,000 PM Suryaghar subsidy credited within 30 days of commissioning. Not one extra trip needed, they did all the follow-up.
Ashok Mehta
Residential · Vadodara · 6 kW
★★★★★
PM Kusum scheme, 7.5 HP solar pump. Diesel cost zero now. Their team coordinated with the Krishi office for the subsidy file end-to-end.
Bharatbhai Chaudhari
Agriculture · Banaskantha · 7.5 HP
Before you sign

Six things to check on any Anand quote.

Including ours. Take this list to every vendor you speak to.

Questions

Solar in Anand: every question answered.

17 questions Anand buyers actually search for, including the ones competing pages leave out. Grouped so you can skip to what you need.

Cost & subsidy

What is the price of a solar panel system in Anand in 2026?
A 3 kW rooftop system runs roughly ₹1.80 lakh to ₹2.25 lakh before subsidy, and 5 kW runs ₹2.85 lakh to ₹3.45 lakh. Those are indicative Anand market ranges covering modules, inverter, structure, protection and installation, not a Heaven Green quotation. Your roof decides the final figure.
How much subsidy will I actually get in Anand?
Up to ₹78,000, which is the central PM Surya Ghar cap. The scheme pays ₹30,000 for each of the first two kilowatts and ₹18,000 for the third, then nothing above 3 kW. The amount is identical in every Indian city. Anand has no separate district slab.
Does the subsidy come to me or to the installer?
To you. After MGVCL issues the commissioning certificate, the government credits the subsidy directly to the bank account registered on the national portal. It does not route through a vendor. If an Anand installer offers to collect it for you or deduct it upfront, refuse.
What payback should I expect on an Anand rooftop?
Three and a half to five years for a residential on-grid system, and three to four and a half years at 25 kW and above. Anand sits in a strong solar band at about 5.5 peak sun hours, so generation is at the upper end of the Indian range.

Net metering & DISCOM

Which electricity company supplies Anand?
Madhya Gujarat Vij Company Limited, short name MGVCL. It is the state-owned Central Gujarat distribution licensee, headquartered at Vadodara and owned by GUVNL, and it supplies Vadodara, Anand, Kheda, Panchmahal, Dahod and Chhota Udaipur districts.
Is Anand under MGVCL or Torrent Power?
MGVCL. Torrent Power is a private licensee holding city licences in Ahmedabad, Gandhinagar and part of Surat, and it does not distribute in Anand. Check the name printed at the top of your electricity bill. That office is the one that must approve your solar system.
How long does MGVCL net metering take in Anand?
Expect several weeks from application to net meter across feasibility, inspection and meter replacement. The GERC framework sets the process for all four Gujarat discoms. Delays usually come from a mismatched consumer number or a system installed at a capacity MGVCL never sanctioned.
Can I install a bigger system than my sanctioned load?
No. Under the GERC net-metering regulations your solar capacity is capped at your sanctioned load. If you want more, apply to MGVCL for load enhancement first. We check the sanctioned load off your meter during the survey so this surfaces before you order anything.

Sizing & performance

How many units will 1 kW generate in Anand?
About 4 to 4.5 units a day as an annual average on a shadow-free roof, which is roughly 5.5 peak sun hours. A 3 kW system makes about 360 to 405 units a month and a 5 kW system about 600 to 675. Shading and soiling pull that down.
What size do I need for a ₹3,000 monthly bill?
A 3 kW system suits the ₹2,000 to ₹3,500 band and needs about 300 sq ft of shadow-free roof. Confirm it against units rather than rupees: pull twelve months of readings off your MGVCL bills and average them before deciding.
How much roof area does a 5 kW system need in Anand?
About 500 sq ft of shadow-free area. Usable roof matters more than total roof. Overhead tanks, stair rooms, parapets and a neighbour's terrace all remove capacity, which is why we measure on site instead of sizing from a satellite image.
Does the Anand summer heat reduce solar output?
Yes, slightly. Module output falls as cell temperature rises, and May daily highs here regularly pass 40 degrees. Good mounting height and an airflow gap under the array limit the loss. Annual generation still lands in the strongest band in India because clear-sky days are plentiful.

Installation & service

How long does installation take in Anand?
Two to four days on site for a typical residential system once MGVCL feasibility is sanctioned. The full timeline from first call to export credits is longer, because the portal registration, feasibility, inspection and meter replacement each take their own time.
How often do panels need cleaning here?
More often through the dry season than the wet one. Between February and May there is almost no rain in Anand and field and road dust settles fast, so a regular cleaning routine protects real units. Plan water access to the roof at design stage.
Do you install on dairy, GIDC and institutional rooftops?
Yes. Chilling and processing units, cattle-feed plants, cold stores, the engineering units at Vithal Udyognagar and college or institutional buildings all suit solar because their load peaks in daylight. Commercial systems use accelerated depreciation, not PM Surya Ghar, which is residential only.

About Heaven Green

Does Heaven Green Energy have an office in Anand?
No. Our only office is at Mota Varachha, Surat. We cover Anand and Central Gujarat through our channel partner network and field engineering team, who run surveys, supervise installation and handle MGVCL coordination locally. We say this upfront rather than implying a branch that does not exist.
What equipment do you install?
Adani Solar modules, as an authorised distributor, with Qbits inverters manufactured in-house. Every installation is handed over with a Bill of Materials listing make, model and quantity, plus the warranty schedule. We have installed since 2017 and passed 10,000 installations.
Nearby

We also install around Anand.

Every city we cover is listed in the solar by location directory.

Free Anand site survey No advance payment, no obligation Get my quote
Call WhatsApp