Solar panel installation in Nadiad.

Heaven Green Energy is an authorised channel partner of Adani for solar modules and a PM Surya Ghar empanelled vendor. For a Nadiad home or business we read your MGVCL bill and design the array around your roof. We file net metering with your Madhya Gujarat Vij sub-division and push the central subsidy claim through to your bank.

Authorised channel partner of AdaniMGVCL net metering filed for you₹78,000 PM Surya Ghar claim handledFree roof survey, nothing paid upfront

Ask for a Nadiad solar estimate

Share a recent MGVCL bill and your pin code. An engineer phones back with a likely system size, the cost after subsidy and a payback range, normally within 2 working hours.

Free site survey. No advance payment.

Prefer to talk? +91 63904 05060

Electricity licensee
MGVCL (Madhya Gujarat Vij)
Nadiad O&M Circle, not Torrent Power
Regulator
GERC
Writes the state rooftop and net-metering rules
Sunshine
About 5.5 peak sun hours
Charotar plains, very little shading terrain
Output
4 to 4.5 units per kW daily
Averaged across the year
PM Surya Ghar
Up to ₹78,000
Homes only, full amount from 3 kW
Home payback
3.5 to 5 years
On-grid, with net metering

The short answer

A 3 kW rooftop system in Nadiad costs roughly ₹1.80 lakh to ₹2.25 lakh installed. That falls to ₹1.02 lakh to ₹1.47 lakh once the ₹78,000 PM Surya Ghar subsidy is credited. Every kW on a clear Kheda roof gives 4 to 4.5 units a day. Madhya Gujarat Vij Company Limited (MGVCL) approves net metering in Nadiad through its Nadiad O&M Circle. Homes usually recover the cost in three and a half to five years.

Last reviewed 2 October 2026 · Heaven Green Energy engineering team

Price, size and savings

Find your bill. Read across.

Start with the bill, not the brochure. Locate your usual monthly MGVCL amount in the left column and read across. The row tells you the size that fits, what it generates, how much shadow-free roof it occupies and what you pay before and after subsidy.

Indicative Nadiad market ranges, 2026
Your monthly bill System Generates Roof needed Cost after subsidy Payback
Up to ₹1,800 2 kW A pol house in Desai Vago or Dabhan Bhagol with a small terrace and fans more than ACs 240–270units/month ~200 sq ft ₹65,000 – ₹95,000 ₹1.25 lakh–₹1.55 lakh before ₹60,000 subsidy 3.5–4.5 years
₹2,000–₹3,500 3 kW Best value A tenement off Pij Road or College Road, and the size where the subsidy does the most work 360–405units/month ~300 sq ft ₹1.02 lakh – ₹1.47 lakh ₹1.80 lakh–₹2.25 lakh before ₹78,000 subsidy 3.5–4.5 years
₹3,500–₹6,000 5 kW A Yogi Nagar or Mai Mandir Road bungalow cooling two bedrooms through a 41°C May 600–675units/month ~500 sq ft ₹2.07 lakh – ₹2.67 lakh ₹2.85 lakh–₹3.45 lakh before ₹78,000 subsidy 4–5 years
₹6,000–₹13,000 10 kW Clinics near the hospital belt, Uttarsanda Road showrooms and joint-family bungalows running three or more ACs 1,200–1,350units/month 700–1,000 sq ft ₹4.42 lakh – ₹5.52 lakh ₹5.20 lakh–₹6.30 lakh before ₹78,000 subsidy 4–5 years
Above ₹13,000 25 kW+ Sheds in Nadiad GIDC, papad and snack dryers in Uttarsanda, cold rooms and private hospitals 3,000–3,400units/month Site-specific ₹10.75 lakh – ₹13.50 lakh ₹10.75 lakh–₹13.50 lakh, no subsidy 3–4.5 years

Figures are indicative 2026 market ranges for Nadiad and Kheda district, covering Tier-1 modules, an inverter, a galvanised structure, protection gear and installation labour. They are not a Heaven Green quotation, which only follows a site survey. Subsidy amounts are the central PM Surya Ghar values from pmsuryaghar.gov.in. Rooftop solar systems carry 5% GST on the equipment since 22 Sep 2025. A supply-and-install contract taxes 30% of the value as installation service at 18%, so the blended rate on a typical quote is about 8.9%. Generation assumes an unshaded roof facing roughly south.

Read the units line on your bill first. MGVCL prints units consumed and your sanctioned load separately from the amount due. The array offsets units, so that is the number to size against. The rupee total also carries fixed charges and fuel adjustment, which make it a poor guide on its own.

Roof crowding decides the old town. Inside the pols of Dabhan Bhagol, Desai Vago and the lanes near Santram Mandir, houses share walls. Terraces are small and broken up by water tanks, stair heads and a neighbour's extra floor. A 2 or 3 kW array often fits there; a 5 kW one often does not. Newer societies along Pij Road, College Road and Uttarsanda Road usually have clear RCC terraces, so the sizing question there is about load, not space.

Above 3 kW the subsidy stops growing. PM Surya Ghar gives ₹30,000 for each of the first two kilowatts and ₹18,000 for the third, capped at ₹78,000. On a 3 kW system that is close to a third of the price; on a 10 kW system it is nearer an eighth. If your bill sits on the line between two sizes, the smaller one usually wins on return.

Ask what is behind the number. Two quotes with the same total can hide very different structures, cable gauges and earthing. Get a written Bill of Materials with make, model and quantity for each part before you compare.

Why there is no rupee saving in that table

The table leaves out a rupee saving figure on purpose. What each solar unit is worth to you depends on your own MGVCL tariff category and slab. A domestic connection in Yogi Nagar is billed differently from a shop on Station Road or a unit in the GIDC. Bring a recent bill to the survey and the engineer will work out the monthly saving from your actual tariff, with you watching, instead of quoting a district average. Prefer to work it out yourself first? Put your bill into our solar savings calculator. No phone number required.

This is what we actually build.

Heaven Green Energy installations across India. Not stock photography, and not renders. Your Nadiad system is built to the same specification.

Rooftop solar array photographed against a city skyline at sunset
Residential rooftop
Long row of solar modules on a commercial building rooftop photographed at sunrise
Commercial rooftop
Elevated solar canopy structure mounted above a terrace, leaving the floor below usable
Elevated structure
Wall of dozens of string inverters mounted in neat rows at a large solar installation
Electricals

PM Surya Ghar Muft Bijli Yojana

₹78,000

Maximum central subsidy for a residential rooftop system.

  • ₹30,000 per kW for the first 2 kW
  • ₹18,000 for the 3rd kW
  • Nothing paid above 3 kW
  • Credited directly to your bank account
  • We file the entire claim for you
How the subsidy works

Five steps, and we run four of them.

Nadiad homes get the same central PM Surya Ghar subsidy as every other Indian city, and there is no extra Kheda or Gujarat top-up. The only local part is the utility that processes your file, which here is MGVCL.

1

Register with your MGVCL consumer number

Sign up on pmsuryaghar.gov.in using the consumer number on your bill, your mobile, Aadhaar and address. We do it alongside you, because a name or number that does not match MGVCL's records holds up more Nadiad applications than anything else.

2

Feasibility, then vendor selection

MGVCL checks the request against your sanctioned load and the local transformer. Once feasibility clears you choose a registered vendor on the portal. Heaven Green Energy is empanelled, so your application links to us directly.

3

No work on the roof before approval

Fitting panels before feasibility is granted can cost you the whole subsidy. After approval we install Adani modules with recorded serial numbers and hand over the Bill of Materials and warranty documents at commissioning.

4

Sub-division inspection and new meter

An officer from your MGVCL sub-division inspects the system and a bidirectional meter is fitted. That produces the commissioning record on the portal. Our engineer is present for the inspection.

5

Subsidy straight to your bank

We lodge the claim as soon as commissioning is recorded and the government pays it directly into your account. The money never routes through an installer. If a vendor offers to receive it for you, walk away.

If you are a business, this section does not apply

PM Surya Ghar applies to residential connections only. A GIDC unit, a clinic, a trading shop or a papad works cannot claim it, and neither can a separate agricultural pump connection. Businesses claim accelerated depreciation on the solar asset instead, and farmers with pumps should look at PM-KUSUM, covered below.

MGVCL (Madhya Gujarat Vij)

Net metering: who you actually file with.

Your net-metering file in Nadiad goes to MGVCL, and inside MGVCL to the Nadiad O&M Circle. Getting that routing right is what turns exported units into credits on your bill.

Nadiad is supplied by Madhya Gujarat Vij Company Limited (MGVCL), the Central Gujarat distribution company under Gujarat Urja Vikas Nigam Limited (GUVNL), with its corporate office in Vadodara. MGVCL's own contact directory places Kheda district under its Nadiad O&M Circle. The city itself is split between the Nadiad (East) and Nadiad (West) sub-divisions, with Nadiad (Rural), Chaklasi and Vaso sub-divisions covering the surrounding villages. Which one handles you depends on your feeder, and the sub-division name is printed on your bill.

Torrent Power holds city licences in Ahmedabad, Gandhinagar and Surat, but Nadiad is not one of them, and neither UGVCL, DGVCL nor PGVCL operates here. A rooftop application in Nadiad that names any company other than MGVCL is filed in the wrong place.

The rules are not MGVCL's to invent. The Gujarat Electricity Regulatory Commission (GERC) sets the rooftop solar and net-metering framework for every licensee in the state. Under it your system is capped at your sanctioned load, and residential and non-residential consumers can both apply. Exported units are set off against imported units on your bill rather than paid out separately.

1

File with your sub-division

Consumer details, sanctioned load, proposed kW, single-line diagram and roof layout go to the MGVCL sub-division named on your bill, East, West or Rural, with the prescribed fee.

We prepare and submit
2

Feasibility check

The sub-division checks transformer and feeder capacity against your rating. Feasibility approval is the point after which installation may legally begin.

MGVCL
3

Install and document

We erect, earth and commission the system and lodge the test report and completion papers, so the meter change can be booked without a second visit to the office.

We prepare and submit
4

Inspection and bidirectional meter

MGVCL inspects with our engineer on the roof and swaps your meter for a bidirectional one. Export credit shows up from the next billing cycle.

Our engineer, then MGVCL
Solar panels installed flush on a corrugated metal factory roof with industrial buildings behind
Not a home?

Solar for Nadiad's businesses.

For a Nadiad business the case for solar rests on daytime load. The GIDC estates, the Uttarsanda snack units and the town's hospitals all draw most of their power while the sun is up.

Nadiad is Kheda district's main industrial centre. The MSME-DI district profile lists two GIDC estates here, Nadiad-I with 114 plots and Nadiad-II, alongside Kapadvanj and Matar elsewhere in the district. Textiles, paper, electrical equipment and food processing lead the district's industry, and Kheda is also a known centre for wooden packaging and sawmills. A short drive out, Uttarsanda has grown into a papad and Gujarati snack cluster where some units have moved from sun drying to machine hot-air dryers. A dryer that runs through the working day is about as close a match to a solar generation curve as you will find.

Health care is the other big daytime user. Nadiad is home to the Muljibhai Patel Urological Hospital, founded in 1978, plus the medical faculty of Dharmsinh Desai University. The city also has nursing and ayurveda colleges, and a ring of private clinics and diagnostic centres. Air conditioning, imaging and sterilisation run from morning to evening, which is when a rooftop array produces.

None of these connections can use PM Surya Ghar. A business claims accelerated depreciation on the solar asset, which for a profitable taxpayer often outweighs the residential subsidy. It can pair it with zero down payment financing so the instalment sits under the bill being removed.

  • GIDC sheet roofs need a load and purlin check before a rating is quoted.
  • The system is capped at sanctioned load, so a load increase may have to be filed first.
  • Snack and food units near dryer exhausts need a cleaning plan for oily film on the glass.

Farm connections. Most of Nadiad taluka is farmland, and Kheda is known for tobacco. Gujarat moved farm pumps onto separate agricultural feeders under Jyotigram Yojana, so a farmhouse and its pump may sit on different connections. Solar for a farmhouse in Nadiad is possible on the house's residential connection; for pumps, read our PM-KUSUM page and the GEDA KUSUM guide for Gujarat.

Why us

Why Nadiad households pick Heaven Green Energy

We started installing in 2017 and have passed 10,000 installations across Gujarat. Here is what that track record means for a Nadiad customer in practical terms.

MGVCL paperwork handled by usApplication, feasibility follow-up, test report, inspection and meter change stay on our side. You do not need to learn how the Nadiad East or West sub-division wants its forms filled.
Adani panels and Qbits invertersWe are an authorised channel partner of Adani and install only Adani modules. Inverters are Qbits, our group's own brand, so a warranty claim stays with one accountable company.
Every part listed in writingYou receive a Bill of Materials naming the make, model and quantity of each component. It is the only fair way to compare our quote against another installer's.
Survey first, payment laterAn engineer visits, measures the terrace, checks shading from tanks and neighbouring floors and reads your bill before any figure is fixed. Nothing is paid to begin.

Where we are based

Heaven Green Energy has one office, at Mota Varachha in Surat. We serve Nadiad, Kheda district and the wider Central Gujarat region through our channel partner network and field engineering team. They carry out the surveys, supervise installation and deal with MGVCL on the ground. We have no branch, address or local phone number in Nadiad, and we tell you that before you sign rather than after.

How we work

From first call to a spinning net meter.

There are four steps between the first phone call and the first export credit on your MGVCL bill. The durations below are typical for Nadiad and depend partly on the sub-division.

01

Phone call and bill check

We take units, tariff category and sanctioned load from your MGVCL bill and give you a likely size and price band before anyone visits.

Same day
02

Roof survey

An engineer measures the usable terrace or shed, notes shadow from tanks and taller neighbours, checks the slab and plans the cable path and inverter spot.

1–3 days
03

Portal and MGVCL approval

PM Surya Ghar registration, the sub-division application and feasibility approval. Queue length varies, and we tell you where the file stands.

2–5 weeks
04

Installation and commissioning

Structure, panels, inverter, earthing and protection are fitted, then MGVCL inspects and changes the meter. You start generating that week.

2–4 days on site

How Nadiad's climate shapes a solar design

Nadiad has a hot semi-arid climate: a long dry season with strong sun, a fierce May and a monsoon packed into four months. Generation is high for most of the year, so the engineering is about protecting that yield from dust, heat and one wet season.

Dry-season dust from fields and roads

February is close to rainless and the dry spell runs well into June. Farm tracks, tobacco fields and construction around the growing edges of the city all put dust in the air. A dusty film cuts output a little every week and is easy to miss from ground level. Plan a cleaning routine from October to June and make sure there is a tap within reach of the terrace when the design is drawn.

May highs around 40 to 41°C

Climate records put Nadiad's average May daytime high at about 40 to 41°C, and hotter days are normal. Panels lose some output as cells heat up, so an array raised clear of the slab with air moving underneath beats one fixed flat against hot concrete. The inverter goes in shade with ventilation, never on a west wall that bakes all afternoon.

Roughly 800 mm of rain, mostly in July

Long-run averages for Nadiad sit close to 800 mm of rain a year, with July alone bringing around 300 mm. That water arrives in a short run of heavy days. Every roof penetration needs proper sealing, cable entries need glands, and earthing should be tested with a meter, not assumed. That way the system does not trip through its first monsoon.

Service area

Areas of Nadiad we install in.

We cover the old walled town, the newer societies to the west and north, the GIDC and ring road side, and the villages around Nadiad. If your area is missing, send your pin code and we will confirm coverage the same day.

Old town, pols and the station side Pin 387001

Santram Mandir area · Desai Vago · Dumral Bazar · Vaniyavad · Dabhan Bhagol · Marida Darwaja · Amdavadi Darwaja · Station Road · Ashram Road · SRP Group area · College Road

Pij Road, Mai Mandir and the western societies Pin 387001 / 387002

Pij Road · Pij Chowkdi · Yogi Nagar · Mai Mandir Road · Patel Society area · Methodist Hospital area · Indira Nagar · Kapadvanj Road · Juna Dumral Road · Santram Dairy Road · Uttarsanda Road · Bilodara

GIDC, ring road and the eastern edge Pin 387320 / 387315 / 387370

Nadiad GIDC Phase I · Nadiad GIDC Phase II · Manjipura · Dabhan · Degam · Arera · Silod · Chaklasi · Uttarsanda · Fatepur · Bhumel · Gutal

Villages around Nadiad Pin 387325 / 387230 / 387355 / 387360 / 387350 / 387345 / 387375 / 387380 / 387115 / 387330

Kanjari · Pij · Tundel · Piplag · Keriavi · Akhdol · Salun · Marida · Hathaj · Davda · Palana · Narsanda · Vadtal · Vaso · Alindra · Mohlel

Customers

Real customers, real cities.

Each review comes from a real Heaven Green customer and keeps the city where that system was installed. None of them is in Nadiad, so you will see Anand, Vadodara and Junagadh below rather than a label changed to suit this page.

★★★★★
80 kW on our hospital rooftop. Diesel backup running time cut by 60%. Heaven Green's structural design cleared all wind-load checks first time.
Nilesh Bhatt
Commercial · Anand · 80 kW
★★★★★
Got the full ₹78,000 PM Suryaghar subsidy credited within 30 days of commissioning. Not one extra trip needed, they did all the follow-up.
Ashok Mehta
Residential · Vadodara · 6 kW
★★★★★
10 kW on our farmhouse with battery backup. No more relying on the unreliable rural grid. Their AMC visits are on schedule, panels stay clean.
Hardik Solanki
Residential · Junagadh · 10 kW
Before you sign

Six things to check on any Nadiad quote.

Including ours. Take this list to every vendor you speak to.

Questions

Solar in Nadiad: every question answered.

17 questions Nadiad buyers actually search for, including the ones competing pages leave out. Grouped so you can skip to what you need.

Cost & subsidy

How much does a rooftop solar system cost in Nadiad in 2026?
Indicatively, a 3 kW system costs about ₹1.80 lakh to ₹2.25 lakh before subsidy and ₹1.02 lakh to ₹1.47 lakh after the ₹78,000 PM Surya Ghar credit. A 5 kW system runs ₹2.85 lakh to ₹3.45 lakh before subsidy. These are market ranges, not a quotation.
How much is the Nadiad solar subsidy for a house?
Up to ₹78,000 per residential connection: ₹30,000 for each of the first two kW and ₹18,000 for the third, with nothing added beyond 3 kW. The scheme is central, so Nadiad homes receive exactly what homes in Anand or Vadodara receive.
Can my clinic or GIDC unit in Nadiad get the PM Surya Ghar subsidy?
No. The scheme covers residential connections only. A clinic, shop or unit in Nadiad GIDC claims accelerated depreciation on the solar asset instead, which for a profitable business is often worth more than the household subsidy. Financing can keep the instalment below the bill it replaces.
What GST applies to rooftop solar in Nadiad?
Rooftop solar systems attract 5% GST on the equipment since 22 Sep 2025. A supply-and-install contract taxes 30% of the value as installation service at 18%, so the blended rate on a typical quote is about 8.9%. Any quote still showing the older higher rate is out of date. The indicative ranges on this page already reflect current market pricing, and your written quotation should show GST as a separate line.

Net metering & DISCOM

Which MGVCL office handles solar net metering in Nadiad?
MGVCL's Nadiad O&M Circle covers Kheda district. Inside the city your file goes to the Nadiad (East) or Nadiad (West) sub-division, while Nadiad (Rural), Chaklasi and Vaso sub-divisions serve surrounding villages. The sub-division name is printed on your bill.
Is Nadiad supplied by Torrent Power?
No. Torrent Power holds licences in Ahmedabad, Gandhinagar and Surat. Nadiad, like the rest of Kheda district, is supplied by Madhya Gujarat Vij Company Limited, MGVCL, a GUVNL subsidiary headquartered in Vadodara. Your net-metering application goes to MGVCL.
How does MGVCL net metering work for a Nadiad rooftop?
MGVCL fits a bidirectional meter that records units you export and units you import. Exports are set off against imports on your bill, so you pay only for net use. The terms come from GERC, the state regulator, and your system size is capped at your sanctioned load.
How long does MGVCL approval take in Nadiad?
Typically two to five weeks from application to feasibility approval, followed by inspection and meter change once the system is installed. The East, West and Rural sub-divisions each run their own queue, so timing varies. We chase the file and keep you informed.

Sizing & performance

How much power will a solar system generate in Nadiad?
About 4 to 4.5 units per kW per day on roughly 5.5 peak sun hours. That gives 360 to 405 units a month from 3 kW and 600 to 675 units from 5 kW. Output dips in July cloud and recovers quickly once the monsoon passes.
What size system suits my MGVCL bill?
As a guide, 2 kW suits bills up to ₹1,800 a month and 3 kW suits ₹2,000 to ₹3,500. A 5 kW system fits ₹3,500 to ₹6,000, and 10 kW fits ₹6,000 to ₹13,000. Above ₹13,000 you are looking at 25 kW and commercial sizing. Confirm against units, not rupees.
Will solar fit on a small pol house roof in old Nadiad?
Often, at 2 or 3 kW. A 3 kW array needs about 300 sq ft of shadow-free terrace. In Dabhan Bhagol or Desai Vago the limit is usually a water tank, stair head or taller neighbour, so we measure shade before suggesting a size.
Can I put solar on my farmhouse near Nadiad?
Yes, on the farmhouse's own residential connection, which can qualify for PM Surya Ghar. Gujarat placed farm pumps on separate agricultural feeders under Jyotigram, so the pump is a different case. For pumps, see our PM-KUSUM page and the GEDA KUSUM guide.

Installation & service

How long does installation take in Nadiad?
Two to four days on site for a typical home once MGVCL approval is in. From first call to generation usually takes four to eight weeks, and most of that time is spent on the portal and sub-division paperwork rather than on your roof.
Can a Nadiad GIDC shed roof take a solar array?
Usually, but only after a structural check. Older sheet roofs in Nadiad-I need the purlins, sheet condition and fixing points assessed before any rating is quoted. Where the sheets are near the end of their life, replacing them first avoids paying to lift the array later.
Who services the system after installation?
Our field team handles service across Kheda district. Modules are Adani and inverters are Qbits, our group's own brand, with serial numbers recorded on your Bill of Materials, so a warranty claim is straightforward. Ask for the cleaning schedule in writing for the dry months.

About Heaven Green

Does Heaven Green Energy have an office in Nadiad?
No. Our only office is at Mota Varachha in Surat. Nadiad customers are served by our channel partner network and field engineering team, who survey, supervise installation and coordinate with MGVCL. We state this plainly so you know who you are dealing with.
Why choose Heaven Green over a local Nadiad installer?
Installing since 2017, more than 10,000 installations, authorised channel partner of Adani, Qbits inverters from our own group, and a written Bill of Materials on every job. We file the MGVCL and PM Surya Ghar papers ourselves. Compare those points against any local quote.
Nearby

We also install around Nadiad.

Every city we cover is listed in the solar by location directory.

Free Nadiad site survey No advance payment, no obligation Get my quote
Call WhatsApp