Solar panel installation in Jalna.

Heaven Green Energy is an authorised channel partner of Adani and a PM Surya Ghar empanelled vendor working across Jalna and Marathwada. We size your system against your actual MSEDCL bill, install it, file the net-metering application with Mahavitaran, and claim your ₹78,000 central subsidy. You sign. We do the running around.

Authorised Adani Solar distributor₹78,000 subsidy handled end-to-endMSEDCL net metering filed for youFree survey, no advance payment

Get your free Jalna solar quote

Send your bill and pin code. An engineer calls back with system size, cost after subsidy and payback, usually within 2 working hours.

Free site survey. No advance payment.

Prefer to talk? +91 63904 05060

Distribution licensee
MSEDCL (Mahavitaran)
Not a Mumbai licensee like BEST or Adani Electricity
Regulator
MERC
Sets the net-metering framework
Solar resource
About 5.5 peak sun hours
Strong, on the Marathwada plateau at 508 m
Generation
4 to 4.5 units per kW daily
Year-round average
Central subsidy
Up to ₹78,000
Residential, 3 kW and above
Typical payback
3.5 to 5 years
Residential on-grid

The short answer

Rooftop solar in Jalna costs roughly ₹53,000 to ₹80,000 per kW before subsidy, with smaller systems dearer per kW. A 3 kW system runs ₹1.85 lakh to ₹2.32 lakh, dropping to ₹1.07 lakh to ₹1.54 lakh after the ₹78,000 PM Surya Ghar subsidy. Each kW makes 4 to 4.5 units daily here. MSEDCL handles net metering. Payback lands between three and a half and five years.

Last reviewed 18 September 2026 · Heaven Green Energy engineering team

Price, size and savings

Find your bill. Read across.

Most Jalna solar pages quote a national average or hide the number behind a form. This table answers the question outright, and the ranges are researched market rates for this part of Maharashtra rather than a figure copied off a Pune page. Find your monthly bill in the left column. Then read across for the system size, the units it makes, the roof area it needs, the payback and the cost after subsidy.

Indicative Jalna market ranges, 2026
Your monthly bill System Generates Roof needed Cost after subsidy Payback
Up to ₹1,800 2 kW 1–2 BHK, one AC used sparingly 240–270units/month ~200 sq ft ₹70,000 – ₹1.00 lakh ₹1.30 lakh–₹1.60 lakh before ₹60,000 subsidy 3.5–4.5 years
₹2,000–₹3,500 3 kW Best value The largest system that still earns the full ₹78,000 360–405units/month ~300 sq ft ₹1.07 lakh – ₹1.54 lakh ₹1.85 lakh–₹2.32 lakh before ₹78,000 subsidy 3.5–4.5 years
₹3,500–₹6,000 5 kW 3 BHK running two ACs through summer 600–675units/month ~500 sq ft ₹2.14 lakh – ₹2.74 lakh ₹2.92 lakh–₹3.52 lakh before ₹78,000 subsidy 4–5 years
₹6,000–₹13,000 10 kW Bungalows, clinics, shops, coaching institutes 1,200–1,350units/month 700–1,000 sq ft ₹4.54 lakh – ₹5.67 lakh ₹5.32 lakh–₹6.45 lakh before ₹78,000 subsidy 4–5 years
Above ₹13,000 25 kW+ Commercial connections, on accelerated depreciation 3,000–3,400units/month Site-specific ₹11.00 lakh – ₹13.80 lakh ₹11.00 lakh–₹13.80 lakh, no subsidy 3–4.5 years

Indicative Jalna market ranges for 2026, covering Tier-1 modules, a branded inverter, galvanised structure, protection and installation. These are market ranges, not a Heaven Green Energy quotation. Subsidy amounts are the central PM Surya Ghar figures published on pmsuryaghar.gov.in. Generation assumes a shadow-free, roughly south-facing roof.

Size against units, not rupees. Read the units figure off your last MSEDCL bill instead of the amount, because units are what a rooftop system cancels. The tariff slab changes; your consumption pattern mostly does not. Shadow-free is the other operative phrase in that roof column. A water tank, a parapet or the neighbour's under-construction second floor shading the array for two hours a day costs more output than most buyers expect.

The 3 kW cliff is real. The subsidy pays 34 to 42% of a 3 kW system but only 12 to 15% of a 10 kW one, because nothing at all is paid above 3 kW. If your bill sits on the border, 3 kW returns more rupees per rupee spent.

In Jalna, ask specifically about the structure. Steel is cheap and local here, which cuts both ways. Fabricators are plentiful, and so are quotes built on thin, poorly galvanised sections put together by a workshop that has never done a wind-load calculation. Galvanising thickness, cable gauge, earthing and surge protection separate the bottom of each price band from the top. Ask for a written Bill of Materials with make, model and quantity. Without one you are not comparing prices, you are comparing guesses.

Why there is no rupee saving in that table

You will notice the table shows no rupee saving. That figure depends on the slab rate you personally pay, which is printed on your own MSEDCL bill and differs between consumers and categories. We will not guess it for you on a web page. Bring your last bill to the free survey and we work the exact number out in front of you. Prefer to work it out yourself first? Put your bill into our solar savings calculator. No phone number required.

This is what we actually build.

Heaven Green Energy installations across India. Not stock photography, and not renders. Your Jalna system is built to the same specification.

Rooftop solar array photographed against a city skyline at sunset
Residential rooftop
Long row of solar modules on a commercial building rooftop photographed at sunrise
Commercial rooftop
Elevated solar canopy structure mounted above a terrace, leaving the floor below usable
Elevated structure
Wall of dozens of string inverters mounted in neat rows at a large solar installation
Electricals

PM Surya Ghar Muft Bijli Yojana

₹78,000

Maximum central subsidy for a residential rooftop system.

  • ₹30,000 per kW for the first 2 kW
  • ₹18,000 for the 3rd kW
  • Nothing paid above 3 kW
  • Credited directly to your bank account
  • We file the entire claim for you
How the subsidy works

Five steps, and we run four of them.

Anyone advertising a bigger "Jalna subsidy" is selling something that does not exist. PM Surya Ghar is a central scheme, so the amount is identical in Jalna, Pune and Nanded. What changes by city is who processes your file, and here that is MSEDCL.

1

Register on the National Portal

You register at pmsuryaghar.gov.in using your MSEDCL consumer number, mobile, Aadhaar and address. We sit with you for this step, because a consumer number that does not match Mahavitaran's records is the commonest reason an application stalls before it ever reaches an engineer.

2

Apply for feasibility, then pick your vendor

MSEDCL checks the application against your sanctioned load. You then choose a vendor empanelled on the portal. Heaven Green Energy is empanelled, so we map straight to your application rather than asking you to re-file anything.

3

Install after approval, never before

We supply Adani modules with traceable serial numbers and hand you a Bill of Materials and a warranty schedule at handover. Installing ahead of approval is how Jalna roofs end up generating power that earns no export credit.

4

Inspection and net meter

MSEDCL inspects the installation and fits the bidirectional meter, which generates the commissioning certificate on the portal. Our engineer attends the inspection so questions about earthing or protection get answered on the spot.

5

Claim and credit

We file the subsidy claim once the certificate issues, and the government credits the money straight to your bank account. It never passes through us. Treat any vendor who offers to collect the subsidy on your behalf as a warning sign, not a convenience.

If you are a business, this section does not apply

PM Surya Ghar covers residential consumers only. A Jalna steel unit, seed processing plant, ginning factory or shop cannot claim it. Those buyers claim accelerated depreciation on the asset instead, which for a taxpaying business often returns more than the residential subsidy would have paid.

MSEDCL (Mahavitaran)

Net metering: who you actually file with.

Net metering is where rival Jalna pages get sloppy, and the mistake costs you every export credit you were counting on. Here is who actually holds your connection.

Jalna is supplied by Maharashtra State Electricity Distribution Company Limited (MSEDCL), trading as Mahavitaran. It is the distribution licensee for effectively all of Maharashtra outside parts of Mumbai city, where BEST, Adani Electricity Mumbai and Tata Power hold the licences instead. So a page that tells you to file with a Mumbai utility, or names a discom that does not operate in Marathwada, was written for a different state. Someone then gave it a light find-and-replace.

Your application is processed through the local Jalna circle and divisional offices of MSEDCL. We do not print a zone name here, because MSEDCL's internal zone and circle nomenclature is not reliably published, and a wrong office name on a form wastes weeks. Our team files at the office that actually holds your consumer account.

The commercial terms come from the Maharashtra Electricity Regulatory Commission (MERC), not from MSEDCL and not from us. Under the MERC framework your rooftop system is capped at your sanctioned load, and every consumer category may apply. Surplus units exported to the grid earn credit against units you draw later.

1

Application

Consumer details, sanctioned load, system rating, a single-line diagram and equipment datasheets go to MSEDCL under your name.

Filed by us
2

Technical feasibility

The discom checks whether your distribution transformer and sanctioned load carry the proposed capacity. Oversized systems fail here, which is why we size against sanctioned load on the first visit rather than the last.

MSEDCL
3

Installation and inspection

We install. MSEDCL then inspects earthing, protection, isolation and metering compliance before anything is energised.

Us, then MSEDCL
4

Bidirectional meter

Your existing meter is swapped for a bidirectional net meter and the commissioning certificate issues. Export credits start accruing from this point, not from the day panels went up.

MSEDCL
Solar panels installed flush on a corrugated metal factory roof with industrial buildings behind
Not a home?

Solar for Jalna's businesses.

Running a re-rolling mill, a seed plant, a ginning factory, a cold store or a shop rather than a home? The maths works differently, and the rest of this page is written for homeowners.

Businesses in the Jalna MIDC estate, the Jalna Industrial Area and along the Samruddhi Mahamarg corridor get no PM Surya Ghar subsidy. They claim accelerated depreciation on the asset instead, which for a taxpaying firm often returns more than the residential subsidy would. They can also skip the capital outlay altogether through OPEX or RESCO models.

Jalna's HT load profile suits rooftop solar unusually well. Steel re-rolling runs a heavy daytime demand that lines up almost exactly with the generation curve. The same is true of seed processing, cold storage for mosambi, ginning and pressing, and pulse and oil mills. We deliver turnkey commercial and industrial EPC across the belt, with structural design to wind-load standards, MSEDCL registration and long-term O&M.

  • Rooftop and ground-mount systems from 25 kW upward, sized against your recorded HT or LT demand rather than your roof area.
  • Accelerated depreciation modelling and OPEX or RESCO structures, so the decision is made on cash flow rather than on sticker price.
  • Generation monitoring and scheduled cleaning, which matters more on an industrial roof in a dusty belt than on a house.
Why us

Why Jalna customers choose Heaven Green Energy

We have built solar since 2017 and delivered more than 10,000 installations across India, from single rooftops to industrial plants running into hundreds of kilowatts.

Authorised Adani Solar distributorGenuine Adani modules, traceable serial numbers, full manufacturer warranty. No grey-market stock, and no brand that has vanished by year eight when you finally need a claim honoured.
We build our own invertersQbits is our in-house inverter brand, so service on the component most likely to need it runs through us rather than through an importer and a queue.
The paperwork is our jobPortal registration, vendor mapping, MSEDCL feasibility and net metering, inspection and the subsidy claim all sit with our team. You sign forms and attend the survey.
Nothing to pay for the surveyThe survey and written proposal cost nothing and commit you to nothing. You keep the Bill of Materials, generation estimate and payback figure, and you are free to price them against any rival in Jalna.

Where we are based

Heaven Green Energy is headquartered at Mota Varachha, Surat. We have no branch office in Jalna. We serve Jalna and the wider Marathwada region through our channel partner network and field engineering team, who run the surveys, supervise installation and handle MSEDCL coordination on the ground. We would rather you knew that before you sign than after.

How we work

From first call to a spinning net meter.

Four steps to a spinning net meter, including the parts that belong to MSEDCL rather than to us.

01

Free site survey

We measure shadow-free area, check the roof structure, read your sanctioned load and twelve months of MSEDCL consumption, and log shading from tanks, parapets and neighbouring construction.

Day 1–2
02

Written proposal

System size, layout, Bill of Materials with makes and models, a generation estimate at Jalna irradiance, your subsidy and your payback. No obligation attached.

Day 3–5
03

Applications and installation

We file with the national portal and MSEDCL, then install once feasibility clears. A typical Jalna residential roof takes two to four days on site.

Day 5–15
04

Inspection, meter, subsidy

MSEDCL inspects and fits the bidirectional meter, the commissioning certificate issues, and we file your claim. The government pays the subsidy into your account.

Set by MSEDCL

What Jalna weather does to a solar system

A design drawn for a coastal Gujarat roof is wrong for the Marathwada plateau. Jalna sits at about 508 metres, gets a fierce pre-monsoon summer and then takes most of its rain in a handful of weeks. Three local conditions change the engineering here, and a vendor who ignores them quotes you less and then delivers less.

April and May heat derating

Commonly published averages put Jalna's mean daily maximum near 39°C through April and May, and module output falls as cell temperature climbs. Airflow is the fix: real clearance between module and roof so heat can escape. A structure bolted flush to the terrace to save a few thousand rupees of steel costs you generation every summer for twenty-five years.

A long dry season and heavy soiling

Jalna gets almost no rain from November to May, so dust sits on the glass for months. Add cotton ginning, steel re-rolling, jowar and cotton fields, and highway construction traffic, and the soiling layer builds faster here than in a cleaner town. It is invisible from the ground, which is why weak output gets blamed on the panels. Clean every two to three weeks from January to June.

A short, sharp monsoon and pre-monsoon squalls

Roughly four fifths of Jalna's annual rain falls between June and September, arriving in intense bursts. The wind events that precede and accompany those bursts are what test a rooftop array. Galvanising thickness, foundation design and fastener grade keep it on the roof, and they are the first items a cut-price quote thins. Earthing and surge protection guard the inverter, the costliest part you will ever replace.

Service area

Areas of Jalna we install in.

We install across Jalna city, the MIDC belt and the surrounding talukas of Jalna district. Every area below is a real, verified locality, post office or settlement, checked against India Post records before it went on this page. We would rather show you a short accurate list than a long one padded with places that do not exist. If your area is missing that is not a refusal, so call and ask.

Central Jalna Pin 431203

Jalna Mondha · Ambika Market · Mastgad · Rahmangunj · Chandanzira · Laxmi Narayan Pura · Kanchan Nagar · Nariman Nagar · Anand Nagar · Bhagyanagar · Vrundavan Colony

Old Jalna, the station and the Collectorate belt Pin 431213

Old Jalna · Jalna Railway Station · Collectorate Complex · MIDC Jalna · Jamwadi · Golapangri · Gondegaon · Kajala · Navha · Pir Pimpalgaon · Pirkalyan · Revgaon · Waghrul · Wakhari

Industrial belt and the dry port corridor Pin 431203, 431213

Jalna Industrial Area · Jalna MIDC · Jalna Dry Port · Kharpudi · Ghanewadi · Daregaon · Kumbhephal · Panshendra · Siraswadi · Tandulwadi · Gokulwadi · Rohanwadi · Indewadi

Jalna taluka and the wider district Pin 431202, 431204, 431205, 431206, 431209, 431212, 431214, 431215, 431501

Badnapur · Ambad · Ambad Bazar · Wadigodri · Jaffrabad · Ghansawangi · Tirthpuri · Ankush Nagar · Shahagad · Ramnagar · Ner · Pathrud · Rajur · Partur

Customers

Real customers, real cities.

Verified Heaven Green Energy customers, each shown with the city their system was actually installed in. We do not re-label a customer to match the page you happen to be reading.

★★★★★
My electricity bill dropped from ₹7,800 to less than ₹400 in two months. PM Suryaghar paperwork, DISCOM approval, net meter, they handled everything.
Rameshbhai Patel
Residential · Surat · 5 kW
★★★★★
250 kW industrial system on our chemical plant. Generation has been 8% above estimate every month. Their O&M team is responsive.
Sanjay Joshi
Industrial · Bharuch · 250 kW
★★★★★
150 kW at our textile factory dropped power costs by 68%. The ROI calculation they provided was spot-on, break-even under 4 years.
Mihir Shah
Commercial · Surat · 150 kW
Before you sign

Six things to check on any Jalna quote.

Including ours. Take this list to every vendor you speak to.

Questions

Solar in Jalna: every question answered.

17 questions Jalna buyers actually search for, including the ones competing pages leave out. Grouped so you can skip to what you need.

Cost & subsidy

What is the cost of solar panel installation in Jalna in 2026?
Roughly ₹53,000 to ₹80,000 per kW installed before subsidy, with small systems dearer per kW. That puts 3 kW at ₹1.85 to ₹2.32 lakh, 5 kW at ₹2.92 to ₹3.52 lakh and 10 kW at ₹5.32 to ₹6.45 lakh. Structure quality and protection specification drive the spread, not the panel brand.
What is the price of a 3 kW solar system in Jalna with subsidy?
Between ₹1.07 lakh and ₹1.54 lakh net, from ₹1.85 to ₹2.32 lakh less the ₹78,000 subsidy. A 3 kW system makes 360 to 405 units a month in Jalna, which covers a household using 300 to 400 units. It is the smallest system earning the full subsidy, which is why it sells most.
How much subsidy do I get on solar panels in Jalna?
Up to ₹78,000. Per pmsuryaghar.gov.in, PM Surya Ghar pays ₹30,000 per kW for the first 2 kW and ₹18,000 for the third, and nothing above that. So 1 kW earns ₹30,000, 2 kW earns ₹60,000, and 3 kW or larger earns ₹78,000. The government credits it to your bank account.
Can I get solar on EMI or a loan in Jalna?
Yes. Residential rooftop solar falls under priority-sector lending and several banks and NBFCs finance it. Most Jalna households finance the pre-subsidy amount, then prepay principal when the subsidy lands. We can introduce financing partners, though comparing their terms against your own bank is usually the smarter move.

Net metering & DISCOM

Which DISCOM serves Jalna for rooftop solar?
MSEDCL, Maharashtra State Electricity Distribution Company Limited, which trades as Mahavitaran. It is the licensee for effectively all of Maharashtra outside parts of Mumbai city, where BEST, Adani Electricity Mumbai and Tata Power distribute instead. Your Jalna application is processed through MSEDCL's local circle and divisional offices.
Is net metering available in Jalna, and what happens to my extra units?
Yes. Under the MERC framework your system may be sized up to your sanctioned load, and all consumer categories qualify. Your home uses solar first by day and exports the surplus to MSEDCL as credit against units drawn at night or during the monsoon. The February to May surplus banks against the July to September dip.
How long does MSEDCL net metering take in Jalna?
Usually a few weeks from application to installed bidirectional meter, covering feasibility, post-installation inspection and the meter swap. Installation itself is only a few days of that. The discom-controlled steps set the pace and no installer can compress them, so treat a guaranteed one-week net meter as a red flag.
Do I need MSEDCL approval before installing solar in Jalna?
Yes, for any grid-connected system, which is almost everyone. The order runs application, feasibility approval, installation, then inspection and meter. Installing first is how a roof ends up generating with no export credit, and how an oversized array gets rejected outright. We file in the correct order for you.

Sizing & performance

How many units does 1 kW of solar generate per day in Jalna?
About 4 to 4.5 units daily, averaged over the year. Jalna sits at roughly 5.5 peak sun hours on the Marathwada plateau, a strong resource. Output beats that average from February to May and falls below it through the monsoon. Across a year, expect roughly 1,460 to 1,640 units per kW installed.
What size solar system do I need for a 2 BHK or 3 BHK home in Jalna?
A 2 BHK usually needs 2 to 3 kW and a 3 BHK 3 to 5 kW, but size against consumption rather than floor plan. Pull the units figure off twelve months of MSEDCL bills and pick the system that covers your average month, not your heaviest one.
How many ACs can run on a 3 kW or 5 kW solar system?
A 1.5-ton split AC draws 1.2 to 1.5 units per hour while the compressor runs. A 3 kW system making 12 to 13.5 units a day in Jalna supports one AC by day plus normal household load. Two ACs through a Jalna April needs 5 kW. At night you draw grid power against banked credits.
How much roof area do I need for solar in Jalna?
About 90 to 100 sq ft of genuinely shadow-free area per kW, so roughly 300 sq ft for 3 kW and 500 sq ft for 5 kW. Shadow-free is the constraint that bites: a tank or a neighbouring parapet shading the array two hours daily costs real output. An elevated structure recovers area on a congested terrace.

Installation & service

How long does solar installation take in Jalna?
Two to four days on a typical residential roof. The whole process, from survey and proposal through the portal and MSEDCL applications to inspection and net meter, runs several weeks, with the discom steps as the variable. We give you a date range at proposal stage and name which steps are ours.
What maintenance do solar panels need in Jalna?
Mainly cleaning. Jalna goes months without rain from November to May, and ginning, re-rolling and field dust build a soiling layer that cuts output with no visible fault. Clean every two to three weeks through the dry months, less during the monsoon, and check connections and earthing twice a year. Our AMC covers both.
Can I add more panels to my system later?
Usually yes, within two limits: your inverter capacity and your MSEDCL sanctioned load. Tell us at survey stage if you expect to expand and we will specify an inverter with headroom and lay the structure out for it. Going beyond sanctioned load needs a load-enhancement application first.

About Heaven Green

Does Heaven Green Energy have an office in Jalna?
No. Our headquarters is at Mota Varachha, Surat, and that is our only office. We serve Jalna and Marathwada through our channel partner network and field engineering team, who run the surveys, supervise installation, handle MSEDCL coordination and provide after-sales service locally. We say so before you sign.
Do you handle industrial rooftop solar for Jalna steel and seed units?
Yes. We deliver turnkey commercial and industrial EPC. Jalna's HT daytime load profile in re-rolling, seed processing, ginning, pulse and oil milling and cold storage matches the solar generation curve closely. That is what makes the business case here stronger than in a services town. Businesses claim accelerated depreciation rather than the residential subsidy, and OPEX or RESCO models remove the capital outlay entirely. Ask us for a load-profile study before you fix a size.
Nearby

We also install around Jalna.

Every city we cover is listed in the solar by location directory.

Free Jalna site survey No advance payment, no obligation Get my quote
Call WhatsApp