Solar panel installation in Nanded.

Heaven Green Energy is an authorised channel partner of Adani and a PM Surya Ghar empanelled vendor. We size your array against the units on your own MSEDCL bill and install it. We lodge the net-metering file with Mahavitaran's local Nanded offices, and claim your ₹78,000 central subsidy for you.

Authorised Adani Solar distributor₹78,000 subsidy claimed for youMSEDCL net metering filed end-to-endFree survey, zero advance

Get your free Nanded solar quote

Send us your latest bill and your pin code. An engineer rings back with size, net cost and payback, usually inside two working hours.

Free site survey. No advance payment.

Prefer to talk? +91 63904 05060

Distribution licensee
MSEDCL (Mahavitaran)
Filed through the local Nanded circle offices
Regulator
MERC
Writes the rooftop and net-metering rules
Solar resource
About 5.5 peak sun hours
Strong by Maharashtra standards
Generation
4 to 4.5 units per kW daily
Averaged across a full year
Central subsidy
Up to ₹78,000
Residential connections, 3 kW and above
Typical payback
3.5 to 5 years
Residential on-grid, before any tariff rise

The short answer

Rooftop solar in Nanded runs about ₹58,000 to ₹77,000 per kW installed, before subsidy. A 3 kW system therefore costs ₹1.85 lakh to ₹2.32 lakh, dropping to ₹1.07 lakh to ₹1.54 lakh once the ₹78,000 PM Surya Ghar subsidy arrives. Every kW yields 4 to 4.5 units a day on roughly 5.5 peak sun hours. MSEDCL runs net metering. Payback lands between three and a half and five years.

Last reviewed 18 September 2026 · Heaven Green Energy engineering team

Price, size and savings

Find your bill. Read across.

Here is the table most Nanded pages refuse to print. Start at your monthly bill on the left, then read straight across. You will find the system size that fits it, the units it makes each month and the shadow-free roof it needs. The last columns give the subsidy it earns and the payback you should expect. No callback required to see a number.

Indicative Nanded market ranges, 2026
Your monthly bill System Generates Roof needed Cost after subsidy Payback
Up to ₹1,800 2 kW 1–2 BHK, one AC used sparingly 240–270units/month ~200 sq ft ₹70,000 – ₹1.00 lakh ₹1.30 lakh–₹1.60 lakh before ₹60,000 subsidy 3.5–4.5 years
₹2,000–₹3,500 3 kW Best value The largest system that still earns the full ₹78,000 360–405units/month ~300 sq ft ₹1.07 lakh – ₹1.54 lakh ₹1.85 lakh–₹2.32 lakh before ₹78,000 subsidy 3.5–4.5 years
₹3,500–₹6,000 5 kW 3 BHK running two ACs through summer 600–675units/month ~500 sq ft ₹2.14 lakh – ₹2.74 lakh ₹2.92 lakh–₹3.52 lakh before ₹78,000 subsidy 4–5 years
₹6,000–₹13,000 10 kW Bungalows, clinics, shops, coaching institutes 1,200–1,350units/month 700–1,000 sq ft ₹4.54 lakh – ₹5.67 lakh ₹5.32 lakh–₹6.45 lakh before ₹78,000 subsidy 4–5 years
Above ₹13,000 25 kW+ Commercial connections, on accelerated depreciation 3,000–3,400units/month Site-specific ₹11.00 lakh – ₹13.80 lakh ₹11.00 lakh–₹13.80 lakh, no subsidy 3–4.5 years

These are indicative market ranges for Nanded in 2026 covering Tier-1 modules, a branded inverter, galvanised mounting structure, protection gear and installation labour. They are not a Heaven Green Energy quotation and no quotation is implied. Subsidy amounts are the central PM Surya Ghar figures published on pmsuryaghar.gov.in. Generation assumes a shadow-free, broadly south-facing roof.

Read units, never rupees. A solar array cancels kilowatt-hours. It does not cancel fixed charges, the fuel adjustment component or the electricity duty printed beneath them. So size the system against the units column of twelve consecutive MSEDCL bills, not against the rupee total of one May bill. May in Nanded is a 40°C month with the coolers running all afternoon. Size off that single bill and you will buy a system you spend the next twenty years under-using.

The subsidy stops dead after the third kilowatt. PM Surya Ghar pays ₹30,000 for each of the first two kilowatts and ₹18,000 for the third. After that, nothing. In percentage terms the grant erases 34 to 42% of a 3 kW system and only around 12 to 15% of a 10 kW one. If your consumption sits on the fence between 3 kW and 5 kW, the 3 kW almost always returns more per rupee you put in.

The local warning: watch what gets cut on a pilgrimage-town budget job. Nanded has a large seasonal trade in fast, cheap contracting around the gurdwara quarter and the guest houses that serve it, and rooftop solar has picked up the same habits. The saving in a suspiciously low quote is almost never in the panel. It is in galvanising thickness, fastener grade, cable cross-section, earthing and surge protection, none of which you can see from the street. Demand a written Bill of Materials with make, model and quantity against every line. Two numbers on two letterheads are not a comparison.

Why there is no rupee saving in that table

You will notice the table quotes no rupee saving. That is on purpose. Your saving depends on the MSEDCL tariff slab your household actually lands in, and that slab is printed on your bill, not on ours. A flat near Taroda Naka and a wholesale shop off Nayamondha sit in different places entirely. We will not publish a guess. Bring your last bill to the free survey and we will work the real figure out with you. Prefer to work it out yourself first? Put your bill into our solar savings calculator. No phone number required.

This is what we actually build.

Heaven Green Energy installations across India. Not stock photography, and not renders. Your Nanded system is built to the same specification.

Rooftop solar array photographed against a city skyline at sunset
Residential rooftop
Long row of solar modules on a commercial building rooftop photographed at sunrise
Commercial rooftop
Elevated solar canopy structure mounted above a terrace, leaving the floor below usable
Elevated structure
Wall of dozens of string inverters mounted in neat rows at a large solar installation
Electricals

PM Surya Ghar Muft Bijli Yojana

₹78,000

Maximum central subsidy for a residential rooftop system.

  • ₹30,000 per kW for the first 2 kW
  • ₹18,000 for the 3rd kW
  • Nothing paid above 3 kW
  • Credited directly to your bank account
  • We file the entire claim for you
How the subsidy works

Five steps, and we run four of them.

There is no Nanded solar subsidy and no Marathwada one either. Anybody advertising a local top-up is selling you a story. PM Surya Ghar is a single central scheme paying the same amount in Nanded, Nagpur and Nagercoil. What differs city to city is which utility processes your file, and here that is MSEDCL.

1

Register on the national portal

You sign up at pmsuryaghar.gov.in with your MSEDCL consumer number, mobile, Aadhaar and address. We sit with you while you do it. A consumer number that does not match Mahavitaran's own record is the single commonest reason an application stalls.

2

Seek feasibility, then choose your vendor

MSEDCL checks the request against your sanctioned load and the transformer feeding your street. You then pick an empanelled vendor from the portal's own list. Heaven Green Energy is empanelled, so your file carries on without a detour.

3

Install only once approval lands

Panels that go up before feasibility clearance put the whole subsidy at risk. After approval we supply Adani modules with traceable serial numbers and hand over the Bill of Materials and the warranty schedule on installation day, not weeks later.

4

Inspection and net meter

MSEDCL inspects the finished installation, swaps your meter for a bidirectional one and raises the commissioning certificate on the portal. Our engineer attends that inspection so any query is settled on the roof rather than by letter.

5

Claim, then credit

We file the subsidy claim as soon as the certificate issues. The government pays it straight into your bank account. It never touches us, so treat any vendor offering to collect your subsidy on your behalf as a reason to walk away.

If you are a business, this section does not apply

PM Surya Ghar covers residential consumers only. A cotton ginning unit, a college trust, a hotel near Sachkhand or a trader on Nayamondha cannot claim a rupee of it. What a taxpaying business can claim is accelerated depreciation on the asset, which for most commercial users in this city is worth considerably more than ₹78,000 would have been.

MSEDCL (Mahavitaran)

Net metering: who you actually file with.

This is the section rival Nanded pages get wrong, and the mistake costs you every export credit you were banking on.

Nanded is supplied by Maharashtra State Electricity Distribution Company Limited (MSEDCL), which trades under the name Mahavitaran. Your application goes to the local Nanded circle and divisional offices that hold your connection, covering the Nanded-Waghala corporation area on both banks of the Godavari and the surrounding talukas. MSEDCL supplies almost the whole of Maharashtra. The exceptions sit in Mumbai, where Adani Electricity Mumbai, Tata Power and BEST hold licences of their own. Has a page sent you to an Adani or Tata Power rooftop portal for a Nanded connection? It has pointed you at a utility with no presence here at all.

The commercial terms are not written by the discom, and certainly not by us. They come from the Maharashtra Electricity Regulatory Commission (MERC). Under the MERC rooftop framework your system is capped at your sanctioned load in kW, or contract demand in kVA for larger connections. It must also fit the headroom left on your distribution transformer. Every consumer category may apply. That includes a housing society connection running a common load, which matters across the CIDCO blocks where a single society meter serves the lift, pump and lighting.

The mechanism itself is simple. Units your roof pushes out are credited against units you pull back later. In a city where 88% of the year's rain falls between June and September, that banking is what carries a strong February surplus through a washed-out July. One condition catches people out: a consumer carrying arrears with MSEDCL is not eligible until the dues are cleared. Check your account before you start rather than after the panels are on the roof.

1

Application

Consumer details, sanctioned load, proposed rating, single-line diagram and equipment datasheets go to the MSEDCL sub-division holding your connection.

Filed by us
2

Technical feasibility

Mahavitaran tests whether your sanctioned load and local transformer can carry the capacity. Oversized proposals fail here, which is why we size against sanctioned load on day one.

MSEDCL
3

Installation and inspection

We build the system. MSEDCL then checks earthing, isolation, protection and metering compliance before a single unit is allowed onto the grid.

Us, then MSEDCL
4

Bidirectional meter

Your meter is replaced with a bidirectional net meter and the commissioning certificate issues. Export credit starts from that date, not from the day the array went up.

MSEDCL
Solar panels installed flush on a corrugated metal factory roof with industrial buildings behind
Not a home?

Solar for Nanded's businesses.

Running a ginning shed, a guest house, a college or a cold store rather than a home? The maths changes, and this page is written for households.

Commercial and industrial users in Nanded get nothing from PM Surya Ghar. They claim accelerated depreciation on the asset instead, which for a taxpaying agri-processing, education or hospitality business usually beats the residential grant outright. If the capital outlay is the obstacle, it can be removed entirely with an OPEX or RESCO arrangement where you pay per unit generated and own no equipment.

  • Units on the Nanded MIDC estate carry wide shed roofs that hold a serious array without costing a square foot of working floor.
  • Guest houses and hotels serving the Hazur Sahib pilgrim flow run heavy daytime cooling and laundry load, which solar matches almost hour for hour.
  • College and hospital campuses across the Vishnupuri belt have large flat terraces and a weekday load profile that suits self-consumption.
  • High-tension consumers are sized against contract demand in kVA rather than sanctioned load in kW, which changes the feasibility arithmetic completely.

Nanded's commercial base is built on what the surrounding district grows and who visits the city. Cotton, sugarcane, banana, soya bean, sorghum, sweet lime and grapes move through the city's trade. A Regional Cotton Research Center sits here alongside an agricultural school under the Parbhani Krishi Vidyapeeth. On top of that sits a year-round pilgrim economy. These are daytime businesses with flat roofs, which is close to the textbook case for rooftop solar. You consume what you generate at the hour you generate it. Payback is therefore driven by the tariff you stop paying rather than the credit you bank.

Why us

Why Nanded customers choose Heaven Green Energy

We have been building solar since 2017 and have delivered more than 10,000 installations across India, from single terraces to industrial roofs in the hundreds of kilowatts.

Authorised Adani Solar distributorGenuine Adani modules with traceable serial numbers and the full manufacturer warranty behind them. No grey-market stock and no unfamiliar brand that has vanished by the year a claim finally matters.
We manufacture our own invertersQbits is our in-house inverter brand. Service on the one component most likely to need it runs through us, not through an importer with a queue, a form and a disclaimer.
The paperwork is ours, not yoursPortal registration, vendor mapping, MSEDCL feasibility, net metering, inspection attendance and the subsidy claim all sit with our team. Your job is signing forms and being home for the survey.
The survey costs nothing and commits nothingYou keep the written proposal, the Bill of Materials, the generation estimate and the payback figure whatever you decide. Price them against any other vendor in Nanded. We would rather you did.

Where we are based

Heaven Green Energy is headquartered at Mota Varachha, Surat. We serve Nanded and the wider Marathwada region through our channel partner network and field engineering team, who run the surveys, supervise installation and handle MSEDCL coordination on the ground. There is no local branch office, no local address and no local landline, and we would rather tell you that before you sign than after.

How we work

From first call to a spinning net meter.

Four steps from first call to a spinning net meter, including the ones MSEDCL controls rather than us.

01

Free site survey

We measure genuinely shadow-free area, check the roof structure, read your sanctioned load and twelve months of MSEDCL units, and log shading from tanks, parapets and neighbouring buildings.

Day 1–2
02

Written proposal

Size, layout, a Bill of Materials naming makes and models, a generation estimate at Nanded irradiance, your subsidy and your payback. No obligation attached to any of it.

Day 3–5
03

Applications and installation

We file on the national portal and with MSEDCL, then install once feasibility clears. A typical Nanded residential terrace takes two to four working days.

Day 5–15
04

Inspection, meter, subsidy

Mahavitaran inspects and fits the bidirectional meter, the commissioning certificate issues, and we lodge your claim. The government pays the subsidy into your account.

Set by MSEDCL

What Nanded weather does to a solar system

A design drawn for the Konkan coast is the wrong design for a Godavari valley town at 362 metres with a tropical savanna climate shading into semi-arid. Three local conditions change the engineering here, and a vendor who ignores them will quote you less and then deliver less.

Two 40°C months, and one 46.7°C record

IMD normals for 1991 to 2020 put the mean daily maximum at 40.6°C in April and 40.7°C in May. The city's record high is 46.7°C, set in June. Module output falls as cell temperature climbs, so airflow is the whole fix. Real clearance between module and terrace lets that heat escape. A frame bolted flat to the slab to save steel quietly costs you generation every summer for twenty-five years.

Dust through a long dry season, cleaned with little water

Nanded gets 823.5 mm of rain across just 44 rainy days a year, which leaves seven mostly dry months. Dust settles into a soiling film that trims output with nothing visibly wrong on the roof. Marathwada is drought-prone and tanker summers are normal here, so the cleaning routine has to use little water. That means dry brushing between occasional light rinses, not a hose running on a terrace in May.

A short monsoon that arrives all at once

July and August alone bring 217.5 mm and 214.2 mm, and roughly 88% of the annual total falls between June and September. Rain that concentrated stresses fixings, waterproofing and cable entries far harder than the yearly figure suggests. Galvanising thickness, ballast or anchor design and properly glanded cable entries keep the array attached, while surge protection keeps the inverter alive through the storm season.

Service area

Areas of Nanded we install in.

We install across old Nanded on the north bank, the newer growth south of the Godavari, the Vishnupuri belt and the villages on the outer ring. If your area is missing below it is not an area we refuse, so call and ask.

Old Nanded, north of the Godavari Pin 431601, 431602, 431604

Vazirabad · Nanded Town · Sachkhand · Mill Gate · Itwara · Karimabad · Chauphala · Nayamondha · Old Mondha · Maltekdi · Shivaji Nagar

New Nanded and the CIDCO blocks Pin 431602, 431603, 431605

CIDCO Nanded · Ashok Nagar · Chaitanya Nagar · Taroda Road · Taroda Naka · Taroda Budruk · Wadi Budruk · Yeshwant Nagar · Nerli · Pimpalgaon

Vishnupuri and the south bank Pin 431602, 431606

Vishnupuri · SRTM University campus · Wadepuri · Asarjan · Waghala · Kakandi · Rahati · Dhoki · Waghi

Nanded MIDC and the outer ring Pin 431602, 431603, 431605

Nanded MIDC · Tuppa · Dhanegaon · Wajegaon · Limbgaon · Lakshminar · Maralak

Customers

Real customers, real cities.

Verified Heaven Green Energy customers, each shown with the city their system was actually installed in. We do not re-label a customer to match whichever page you happen to be reading.

★★★★★
My electricity bill dropped from ₹7,800 to less than ₹400 in two months. PM Suryaghar paperwork, DISCOM approval, net meter, they handled everything.
Rameshbhai Patel
Residential · Surat · 5 kW
★★★★★
80 kW on our hospital rooftop. Diesel backup running time cut by 60%. Heaven Green's structural design cleared all wind-load checks first time.
Nilesh Bhatt
Commercial · Anand · 80 kW
★★★★★
10 kW on our farmhouse with battery backup. No more relying on the unreliable rural grid. Their AMC visits are on schedule, panels stay clean.
Hardik Solanki
Residential · Junagadh · 10 kW
Before you sign

Six things to check on any Nanded quote.

Including ours. Take this list to every vendor you speak to.

Questions

Solar in Nanded: every question answered.

17 questions Nanded buyers actually search for, including the ones competing pages leave out. Grouped so you can skip to what you need.

Cost & subsidy

What does solar panel installation in Nanded cost in 2026?
Roughly ₹58,000 to ₹77,000 per kW installed before subsidy. That puts 3 kW at ₹1.85 to ₹2.32 lakh, 5 kW at ₹2.92 to ₹3.52 lakh and 10 kW at ₹5.32 to ₹6.45 lakh. Structure quality, protection specification and roof access move the price far more than the panel brand does.
What is the price of a 3 kW solar system in Nanded after subsidy?
Between ₹1.07 lakh and ₹1.54 lakh net, from a pre-subsidy ₹1.85 to ₹2.32 lakh less the ₹78,000 grant. A 3 kW array makes 360 to 405 units a month in Nanded, which suits a household drawing 300 to 400. It is also the smallest size that earns the full subsidy.
How much solar subsidy will I get in Nanded?
Up to ₹78,000, and not one rupee more. Per pmsuryaghar.gov.in the scheme pays ₹30,000 per kW for the first two kilowatts and ₹18,000 for the third, then stops. So 1 kW earns ₹30,000, 2 kW earns ₹60,000 and anything from 3 kW upwards earns ₹78,000, paid into your bank account.
Can I buy rooftop solar in Nanded on EMI?
Yes. Residential rooftop solar falls under priority-sector lending, so several banks and NBFCs finance it. Most households borrow the pre-subsidy amount and prepay principal when the subsidy lands. We can introduce finance partners, but compare them against your own bank first, because an existing relationship often wins on rate and fees.

Net metering & DISCOM

Which DISCOM serves Nanded for rooftop solar?
MSEDCL, the Maharashtra State Electricity Distribution Company Limited, trading as Mahavitaran. Your file goes through its local Nanded offices. Adani Electricity, Tata Power and BEST are Mumbai licensees with no role whatsoever in Marathwada, so any page sending you to their rooftop portals has the wrong utility.
Is net metering available in Nanded, and what happens to surplus units?
Yes. Under the MERC framework your system may be sized up to your sanctioned load and every consumer category is allowed to apply. Your home consumes solar first during daylight and exports the surplus to MSEDCL as credit, which you then draw back against night-time consumption.
How long does MSEDCL net metering take here?
Usually a few weeks from application to an installed bidirectional meter, covering feasibility, post-installation inspection and the meter swap. The build itself is only days of that. The discom-controlled steps set the pace, so treat a guaranteed one-week net meter as a sales claim, not a schedule.
Do I need MSEDCL approval before installing solar in Nanded?
Yes, for any grid-connected system, which covers almost every household. The order is application, feasibility approval, installation, then inspection and meter. Building first is how roofs end up generating with no export credit and how oversized systems get rejected outright. We file in the right sequence.

Sizing & performance

How many units does 1 kW of solar generate per day in Nanded?
About 4 to 4.5 units daily as a yearly average, on roughly 5.5 peak sun hours. Output runs above that through the clear months from February to May and below it across the June to September monsoon. Over a full year expect 1,450 to 1,600 units per kW from a shadow-free array.
What size system does a 2 BHK or 3 BHK home in CIDCO or Vishnupuri need?
A 2 BHK usually lands at 2 to 3 kW and a 3 BHK at 3 to 5 kW, but the floor plan is a poor guide. Take the units off twelve months of MSEDCL bills and buy the system that covers your average month rather than your worst one.
How many air conditioners can a 3 kW or 5 kW system run in a Nanded summer?
A 1.5-ton split AC pulls 1.2 to 1.5 units an hour while its compressor runs. A 3 kW system making 12 to 13.5 units a day carries one AC through the afternoon plus normal household load. Two ACs through a 40°C May needs 5 kW. Night use draws grid power against banked credit.
How much roof area do I need in Nanded?
Roughly 90 to 100 sq ft of genuinely shadow-free area per kW, so about 300 sq ft for 3 kW and 500 sq ft for 5 kW. Shadow-free is the operative phrase. A water tank shading the array for two hours daily costs real output, and an elevated structure can recover a congested terrace.

Installation & service

How long does installation take in Nanded?
Two to four working days on a typical residential terrace. The whole process, from survey and proposal through the portal and MSEDCL filings to inspection and net meter, runs several weeks, with the discom steps as the variable. We give you a date range at proposal stage and name which steps are ours.
What maintenance do panels need in a drought-prone city like Nanded?
Mostly cleaning, done on as little water as possible. Seven largely dry months build a dust film that cuts output with no visible fault. We therefore dry-brush between occasional light rinses rather than hosing a roof in a tanker summer. Connections, fixings and earthing get checked twice a year. Our AMC covers both.
Can I add more panels later?
Usually yes, inside two limits: your inverter capacity and your MSEDCL sanctioned load. Tell us at survey stage if you expect to expand and we will specify an inverter with headroom and lay the structure out for it. Going past your sanctioned load needs a separate load-enhancement application first.

About Heaven Green

Does Heaven Green Energy have an office in Nanded?
No. Our only office is in Mota Varachha, Surat. We serve Nanded and the wider Marathwada region through our channel partner network and field engineering team, who run surveys, supervise installation, handle MSEDCL coordination and provide after-sales service locally. You should know that before signing, not after.
Can you handle a hotel, college or unit on the Nanded MIDC estate?
Yes. We deliver turnkey commercial and industrial EPC, including structural design to wind-load standards, MSEDCL registration and long-term operations and maintenance. Commercial consumers claim accelerated depreciation rather than PM Surya Ghar, and can take an OPEX or RESCO route with no capital outlay at all.
Nearby

We also install around Nanded.

Every city we cover is listed in the solar by location directory.

Free Nanded site survey No advance payment, no obligation Get my quote
Call WhatsApp