Solar panel installation in Khandwa.

Heaven Green Energy is an authorised channel partner of Adani and a PM Surya Ghar empanelled vendor. For a home in Khandwa, we size your system against your own MPPKVVCL bill and install it. We file the net-metering application with the West Discom and claim your ₹78,000 central subsidy. You sign the forms. We do all the running.

Authorised Adani Solar distributor₹78,000 subsidy handled end-to-endMPPKVVCL net metering filed for youFree survey, no advance payment

Get your free Khandwa solar quote

Send your last bill and your pin code. An engineer calls back with system size, cost after subsidy and payback, usually inside two working hours.

Free site survey. No advance payment.

Prefer to talk? +91 63904 05060

Distribution licensee
MPPKVVCL (MP West Discom)
Indore-headquartered, not the Bhopal or Jabalpur company
Regulator
MPERC
Sets the net-metering framework for all three MP discoms
Solar resource
About 5.5 peak sun hours
Among the stronger figures in central India
Generation
4 to 4.5 units per kW daily
Annual average across the year
Central subsidy
Up to ₹78,000
Residential, 3 kW and above
Typical payback
3.5 to 5 years
Residential on-grid

The short answer

Rooftop solar in Khandwa costs about ₹1.85 lakh to ₹2.30 lakh for a 3 kW system before subsidy. The ₹78,000 PM Surya Ghar subsidy brings it down to ₹1.07 lakh to ₹1.52 lakh. Each installed kW makes 4 to 4.5 units a day on roughly 5.5 peak sun hours. MPPKVVCL, the West Discom, runs net metering. Payback lands between three and a half and five years.

Last reviewed 18 September 2026 · Heaven Green Energy engineering team

Price, size and savings

Find your bill. Read across.

Most pages written for Khandwa quote a national average or hide the number behind a form. This one does neither. Find your monthly bill in the left column, then read across for the system size, what it generates here, the shadow-free roof it needs, and what it costs after subsidy.

Indicative Khandwa market ranges, 2026
Your monthly bill System Generates Roof needed Cost after subsidy Payback
Up to ₹1,800 2 kW 1–2 BHK, one AC used sparingly 240–270units/month ~200 sq ft ₹70,000 – ₹1.00 lakh ₹1.30 lakh–₹1.60 lakh before ₹60,000 subsidy 3.5–4.5 years
₹2,000–₹3,500 3 kW Best value The largest system that still earns the full ₹78,000 360–405units/month ~300 sq ft ₹1.07 lakh – ₹1.52 lakh ₹1.85 lakh–₹2.30 lakh before ₹78,000 subsidy 3.5–4.5 years
₹3,500–₹6,000 5 kW 3 BHK running two ACs through summer 600–675units/month ~500 sq ft ₹2.12 lakh – ₹2.72 lakh ₹2.90 lakh–₹3.50 lakh before ₹78,000 subsidy 4–5 years
₹6,000–₹13,000 10 kW Bungalows, clinics, shops, coaching institutes 1,200–1,350units/month 700–1,000 sq ft ₹4.52 lakh – ₹5.62 lakh ₹5.30 lakh–₹6.40 lakh before ₹78,000 subsidy 4–5 years
Above ₹13,000 25 kW+ Commercial connections, on accelerated depreciation 3,000–3,400units/month Site-specific ₹11.00 lakh – ₹13.75 lakh ₹11.00 lakh–₹13.75 lakh, no subsidy 3–4.5 years

These are indicative Khandwa market ranges for 2026, covering Tier-1 modules, a branded inverter, galvanised structure, protection and installation. They are not a Heaven Green quotation. Subsidy figures are the central PM Surya Ghar amounts published on pmsuryaghar.gov.in. Generation assumes a shadow-free, roughly south-facing roof.

Size against units, not rupees. Read the units figure off your last MPPKVVCL bill, because units are what a rooftop system cancels. The rupee amount moves with slab rates and arrears, so it will mislead you. Shadow-free matters as much as area: a water tank, a parapet or a neighbour's extra floor shading the array two hours a day removes more output than buyers expect.

The 3 kW cliff is real. The subsidy pays ₹30,000 per kW for the first two kilowatts and ₹18,000 for the third, then nothing at all. So it covers 34 to 42% of a 3 kW system and only 12 to 15% of a 10 kW one. On a borderline bill, 3 kW returns more rupees per rupee spent.

A cheap Khandwa quote is cheap in the steel, not the glass. Galvanising thickness, cable gauge, earthing and surge protection decide whether an array survives a Nimar June. Ask for a written Bill of Materials with make, model and quantity on every line. Khandwa district already hosts large solar and thermal generation, so solar sells itself here and the door-to-door trade has followed. Familiarity is not diligence: check the paperwork anyway.

Why there is no rupee saving in that table

There is no rupee saving in that table, and that is deliberate. What you save depends on the slab rate printed on your own bill, and that differs between two households on the same Khandwa street with the same sanctioned load. We will not guess it for you. Bring your last bill to the free survey and we will work the exact figure out with you, in front of you. We use your own tariff and your own twelve months of consumption. Prefer to work it out yourself first? Put your bill into our solar savings calculator. No phone number required.

This is what we actually build.

Heaven Green Energy installations across India. Not stock photography, and not renders. Your Khandwa system is built to the same specification.

Rooftop solar array photographed against a city skyline at sunset
Residential rooftop
Long row of solar modules on a commercial building rooftop photographed at sunrise
Commercial rooftop
Elevated solar canopy structure mounted above a terrace, leaving the floor below usable
Elevated structure
Wall of dozens of string inverters mounted in neat rows at a large solar installation
Electricals

PM Surya Ghar Muft Bijli Yojana

₹78,000

Maximum central subsidy for a residential rooftop system.

  • ₹30,000 per kW for the first 2 kW
  • ₹18,000 for the 3rd kW
  • Nothing paid above 3 kW
  • Credited directly to your bank account
  • We file the entire claim for you
How the subsidy works

Five steps, and we run four of them.

The subsidy is central, so there is no special Khandwa rate and anyone advertising one is selling you something else. The amount is fixed nationally at up to ₹78,000. What changes from city to city is who processes the file, and here that is MPPKVVCL.

1

Register on the National Portal

You register at pmsuryaghar.gov.in with your MPPKVVCL consumer number, mobile, Aadhaar and address. We sit with you for this step, because a consumer number that does not match the discom's own records is the commonest reason a Khandwa application stalls before it starts.

2

Apply for feasibility, then pick your vendor

MPPKVVCL checks the application against your sanctioned load. You then select an empanelled vendor from the portal list. Heaven Green Energy is empanelled, so we map straight onto your application with no second registration and no rekeyed consumer details to go wrong.

3

Install only after approval comes

Once feasibility clears, we supply Adani modules with traceable serial numbers and install. You get a Bill of Materials and the warranty schedule on paper, not on a phone screen. A vendor who installs before approval is putting your entire subsidy at risk.

4

Inspection and net meter

MPPKVVCL inspects the installation and fits the bidirectional meter, which generates a commissioning certificate on the portal. Our engineer attends that inspection, so questions about earthing, isolation or protection get answered on the spot instead of by a second visit.

5

Claim and credit

We file the claim as soon as the certificate issues, and the government credits the subsidy straight to your bank account. It never passes through us at any point. Treat any Khandwa vendor who offers to collect it on your behalf as a warning sign.

If you are a business, this section does not apply

PM Surya Ghar covers residential consumers only. A Khandwa ginning unit, oil mill, shop or clinic cannot claim a rupee of it. Businesses instead claim accelerated depreciation on the asset, which for a taxpaying firm often returns more than the residential subsidy ever would have paid.

MPPKVVCL (MP West Discom)

Net metering: who you actually file with.

Net metering is where pages written about Khandwa go wrong, and the mistake costs you every export credit you were counting on. Get the licensee right first.

Khandwa is supplied by Madhya Pradesh Paschim Kshetra Vidyut Vitaran Company Limited (MPPKVVCL), the West Discom, which is headquartered in Indore. Madhya Pradesh has three distribution licensees and they are separate companies. They are MPPKVVCL in the west, MPMKVVCL (Madhya Kshetra, the Central discom) in Bhopal, and MPPoKVVCL (Poorv Kshetra, the East discom) in Jabalpur. All three are named that way in MPERC's own retail supply tariff orders. A page that files your Khandwa application at the Bhopal or Jabalpur company has sent it to a utility with no licence over your connection.

Commercial terms are set by the Madhya Pradesh Electricity Regulatory Commission (MPERC), not by the discom and not by us. Under the MPERC framework your system capacity is capped at your sanctioned load, and every consumer category may apply. Surplus units you export are credited against units you draw back later.

We file at the local Khandwa divisional office of MPPKVVCL. We will not name an internal circle we cannot confirm from the licensee itself, and neither should any vendor quoting you.

1

Application

Consumer details, sanctioned load, system rating, single-line diagram and equipment datasheets go to MPPKVVCL under your name, with our engineer as the point of contact for queries.

Filed by us
2

Technical feasibility

The discom tests whether your distribution transformer and sanctioned load can carry the proposed capacity. Oversized systems are rejected here, which is why we size against sanctioned load on visit one.

MPPKVVCL
3

Installation and inspection

We install the array, structure, wiring and protection. MPPKVVCL then inspects earthing, isolation, protection and metering compliance before anything is allowed to energise.

Us, then MPPKVVCL
4

Bidirectional meter

Your existing meter is swapped for a bidirectional net meter and the commissioning certificate issues. Export credits begin from that date, not from the day the panels went up on the roof.

MPPKVVCL
Solar panels installed flush on a corrugated metal factory roof with industrial buildings behind
Not a home?

Solar for Khandwa's businesses.

Running a ginning unit, an oil mill, a shop or a clinic rather than a home? The economics work differently and this page is written for householders.

Khandwa's industrial base is small-scale and agriculture-led: cotton ginning and edible-oil milling in and around the town, plus the mandi trade behind the district's soybean, wheat, gram and onion crops. None of it qualifies for PM Surya Ghar. Commercial and industrial consumers instead claim accelerated depreciation on the asset, and can avoid capital outlay altogether under OPEX or RESCO models.

We deliver turnkey commercial and industrial EPC across the Khandwa belt, including sites on Mundi Road, the Indore Road side and the Chhegaon Makhan road. Each job includes structural design to wind-load standards, MPPKVVCL registration, generation monitoring and long-term O&M contracts.

  • No PM Surya Ghar subsidy, but accelerated depreciation instead
  • Sized against contract demand, not roof area
  • OPEX and RESCO options with no capital outlay
Why us

Why Khandwa customers choose Heaven Green Energy

We have built solar since 2017 and delivered more than 10,000 installations across India, from single rooftops to industrial plants running into hundreds of kilowatts. Four things separate us in Khandwa.

Authorised Adani Solar distributorGenuine Adani modules with traceable serial numbers and the full manufacturer warranty behind them. No grey-market stock, and no badge brand that has quietly vanished by year eight when you need a claim honoured.
We build our own invertersQbits is our in-house inverter brand. Service on the component most likely to need it runs through us rather than through an importer, a distributor and a queue you cannot see the front of.
The paperwork is our jobPortal registration, vendor mapping, MPPKVVCL feasibility and net metering, the inspection and the subsidy claim all sit with our team. You sign the forms, attend the survey, and keep your weekdays.
Nothing to pay for the surveySurvey and proposal cost nothing and commit you to nothing. You keep the Bill of Materials, the generation estimate and the payback figure, and you are free to price them against any rival in Khandwa.

Where we are based

Heaven Green Energy is headquartered at Mota Varachha, Surat. We serve Khandwa and the wider Nimar region through our channel partner network and field engineering team, who run the surveys, supervise installation and handle MPPKVVCL coordination on the ground. There is no Heaven Green branch office in Khandwa, no local address and no local landline, and we say so before you sign rather than after.

How we work

From first call to a spinning net meter.

Four steps to a spinning net meter, including the parts that belong to MPPKVVCL rather than to us, and roughly how long each one takes.

01

Free site survey

We measure shadow-free area, check the roof structure and slab condition, read your sanctioned load and twelve months of MPPKVVCL consumption, and log shading from tanks, parapets and trees.

Day 1–2
02

Written proposal

System size, layout drawing, Bill of Materials with makes and models, generation estimated at Khandwa irradiance, your subsidy and your payback period. No obligation is attached to any of it.

Day 3–5
03

Applications and installation

We file with the national portal and with MPPKVVCL, then install once feasibility clears. A typical Khandwa residential roof takes two to four days of work on site.

Day 5–15
04

Inspection, meter, subsidy

MPPKVVCL inspects and fits the bidirectional meter, the commissioning certificate issues, and we file your claim. Government then pays the subsidy directly into your own bank account.

Set by MPPKVVCL

What Khandwa weather does to a solar system

Nimar is one of the hotter corners of Madhya Pradesh, and a system specified for a coastal roof is the wrong system here. Three local conditions change the engineering, and a vendor who ignores them quotes you less and then delivers less. All three figures below come from the IMD station normals for Khandwa.

Heat derating through a Nimar summer

Khandwa's mean daily maximum is 40.3°C in April and 41.7°C in May on the IMD 1991–2020 normals, with a recorded high of 47.6°C. Module output drops as cell temperature climbs, so airflow is the fix: real clearance between module and roof slab. A structure bolted flush to save steel costs you generation every summer for twenty-five years.

Nine dry months of dust

Khandwa records about 42.8 rainy days a year, so the glass spends most of the year collecting dust off fields, roads and mandi traffic. Soiling is the most underrated cause of weak output in Nimar precisely because it is invisible from the ground. Roofs here want cleaning every two to three weeks from March to June. Our AMC covers it.

A short, violent monsoon

Annual rainfall is around 911 mm, but roughly a third of it lands in July alone, at about 295 mm. It arrives with the wind events that precede and accompany the burst. Galvanising thickness, foundation design and fastener grade are what keep an array on the roof through that. Earthing and surge protection guard the inverter, the costliest part you will ever replace.

Service area

Areas of Khandwa we install in.

We install across Khandwa city, the surrounding tehsils and the district towns. An area missing from this list is not an area we refuse, so call and ask about yours. We also cover the villages along the Mundi, Harsud and Pandhana roads.

Central Khandwa Pin 450001

Bombay Bazaar · Ganeshganj · Ganesh Talai · Kotwali · Kaharwadi · Ramganj Ward · Ghaspura · Mali Kuwa · Moghat Road · Khanshahwali · Civil Lines · Harsud Road

Padam Nagar & the Indore Road side Pin 450001

Padam Nagar · Padawa · Sneh Nagar · Shrinagar Main Road · Indore Road · Khandwa–Chhegaon Makhan Road · Khandwa Taraf Kumbhi · Temikala · Makhanlal Chaturvedi Marg · Rajhori

North Khandwa & Sihada Road Pin 450001

Anand Nagar · Sihada Road · Narayan Nagar · Postman Colony · Indora Chowk · Civil Line Road · Rameshwar Nagar · Deendayal Puram · Ram Nagar · Vidya Nagar · Nagchun · Bargaon

Mundi Road, Ratagarh & the district Pin 450001, 450112, 450114, 450116, 450119, 450554, 450661, 450771

Luv Kush Nagar · Mundi Road · Khandwa Ratagarh · Mundi · Punasa · Narmada Nagar · Mandhata (Omkareshwar) · Naya Harsud · Killod · Khalwa · Pandhana · Deshgaon · Chhaigaon Makhan · Bamhangaon

Customers

Real customers, real cities.

These are real Heaven Green customers, shown with the city each system was actually installed in. We do not relabel a review to whichever city page you happen to be reading.

★★★★★
PM Kusum scheme, 7.5 HP solar pump. Diesel cost zero now. Their team coordinated with the Krishi office for the subsidy file end-to-end.
Bharatbhai Chaudhari
Agriculture · Banaskantha · 7.5 HP
★★★★★
10 kW on our farmhouse with battery backup. No more relying on the unreliable rural grid. Their AMC visits are on schedule, panels stay clean.
Hardik Solanki
Residential · Junagadh · 10 kW
★★★★★
Got the full ₹78,000 PM Suryaghar subsidy credited within 30 days of commissioning. Not one extra trip needed, they did all the follow-up.
Ashok Mehta
Residential · Vadodara · 6 kW
Before you sign

Six things to check on any Khandwa quote.

Including ours. Take this list to every vendor you speak to.

Questions

Solar in Khandwa: every question answered.

17 questions Khandwa buyers actually search for, including the ones competing pages leave out. Grouped so you can skip to what you need.

Cost & subsidy

What is the cost of solar panel installation in Khandwa in 2026?
All figures are before subsidy: about ₹1.30 to ₹1.60 lakh for 2 kW, ₹1.85 to ₹2.30 lakh for 3 kW and ₹2.90 to ₹3.50 lakh for 5 kW. A 10 kW system costs ₹5.30 to ₹6.40 lakh. Structure quality, protection and roof access drive that spread more than panel brand does. A 25 kW system runs ₹11 lakh to ₹13.75 lakh.
What is the price of a 3 kW solar system in Khandwa with subsidy?
Between ₹1.07 lakh and ₹1.52 lakh net: ₹1.85 to ₹2.30 lakh less the ₹78,000 subsidy. A 3 kW system makes 360 to 405 units a month in Khandwa, which covers a household using 300 to 400 units. It is the smallest system that still earns the full subsidy.
How much solar subsidy do I get in Khandwa?
Up to ₹78,000. PM Surya Ghar pays ₹30,000 per kW for the first 2 kW and ₹18,000 for the third, and nothing above that, per pmsuryaghar.gov.in. So 1 kW earns ₹30,000, 2 kW earns ₹60,000 and 3 kW or larger earns ₹78,000, credited straight to your bank account.
Can I buy solar on EMI or a loan in Khandwa?
Yes. Residential rooftop solar falls under priority-sector lending, and several banks and NBFCs with Khandwa branches finance it. Most households finance the pre-subsidy amount, then prepay principal when the subsidy lands. We can introduce financing partners, though pricing them against your own bank is smarter. Check the processing fee and the prepayment penalty first.

Net metering & DISCOM

Which DISCOM serves Khandwa for rooftop solar?
MPPKVVCL, Madhya Pradesh Paschim Kshetra Vidyut Vitaran Company Limited, the West Discom headquartered in Indore. It is a different company from MPMKVVCL, the Central discom at Bhopal, and MPPoKVVCL, the East discom at Jabalpur. File at the wrong one and your application simply sits unprocessed.
Is net metering available in Khandwa, and what happens to my surplus units?
Yes. Under the MPERC framework your system may be sized up to your sanctioned load and all consumer categories may apply. Your home uses solar first by day and exports the surplus to MPPKVVCL as credit, so the long Khandwa dry season banks units against the July and August monsoon dip.
How long does MPPKVVCL net metering take in Khandwa?
Usually a few weeks from application to installed bidirectional meter, covering feasibility, the post-installation inspection and the meter swap. The installation itself is only days of that. Discom-controlled steps set the pace, so treat any vendor guaranteeing a one-week net meter as a red flag.
Do I need MPPKVVCL approval before installing solar in Khandwa?
Yes, for any grid-connected system, which is almost everybody. The order runs application, feasibility approval, installation, then inspection and meter. Installing first is how roofs end up generating with no export credit at all, and how oversized systems get rejected outright. We file in the correct order.

Sizing & performance

How many units does 1 kW of solar generate per day in Khandwa?
About 4 to 4.5 units daily, averaged across the year, on roughly 5.5 peak sun hours. Output runs above that from March to May and below it through the July to September monsoon. Over a full year, expect roughly 1,450 to 1,600 units per installed kilowatt, assuming the array stays clean and unshaded.
What size solar system does a 2 BHK or 3 BHK home in Khandwa need?
A 2 BHK usually lands at 2 to 3 kW and a 3 BHK at 3 to 5 kW, but size against consumption, not floor plan. Pull the units from twelve months of MPPKVVCL bills and pick the system that covers your average month, rather than your single worst one.
How many air conditioners can a 3 kW or 5 kW system run in Khandwa?
A 1.5-ton split AC draws 1.2 to 1.5 units per hour while the compressor runs. A 3 kW system making 12 to 13.5 units a day supports one AC by day plus household load. Two ACs through a Khandwa May needs 5 kW.
How much roof area do I need for solar in Khandwa?
Roughly 200 sq ft for 2 kW, 300 sq ft for 3 kW, 500 sq ft for 5 kW and 700 to 1,000 sq ft for 10 kW. It must be shadow-free, not merely empty. Water tanks, parapets and a neighbour's newer floor are what shrink a usable Khandwa terrace. An elevated structure recovers some of it at extra cost.

Installation & service

How long does solar installation take in Khandwa?
Two to four days on site for a typical residential roof, once feasibility has cleared. The full timeline from first call to a running net meter is usually a few weeks. The discom-controlled inspection and meter swap account for most of that, not the installation itself.
How often should solar panels be cleaned in Khandwa?
Every two to three weeks from March to June, and monthly through the rest of the dry season. Khandwa sees only about 43 rainy days a year, so dust sits on the glass for months. Use plain water and a soft brush, never a scraper or detergent.
What warranty and after-sales service do I get?
Adani modules carry the manufacturer's product and performance warranties, issued separately rather than merged into one number. Inverters carry their own term, and Qbits units are serviced by us directly. Ask any Khandwa vendor for the warranty schedule on paper before you pay them anything.

About Heaven Green

Does Heaven Green Energy have an office in Khandwa?
No. Our only office is at Mota Varachha, Surat. We serve Khandwa and the Nimar belt through our channel partner network and field engineering team, who run the surveys, supervise installation and handle MPPKVVCL coordination on the ground. We state that up front rather than after you have signed.
Why choose Heaven Green Energy over a local Khandwa installer?
We are an authorised channel partner of Adani, we manufacture our own Qbits inverters, and we have delivered more than 10,000 installations since 2017. The survey, the written Bill of Materials and the proposal cost you nothing, so you can price us against any local vendor before you decide. Compare the structure specification and the warranty terms, not just the total.
Nearby

We also install around Khandwa.

Every city we cover is listed in the solar by location directory.

Free Khandwa site survey No advance payment, no obligation Get my quote
Call WhatsApp