Solar panel installation in Ujjain.

Heaven Green Energy is an authorised channel partner of Adani and a PM Surya Ghar empanelled vendor. For Ujjain homes, we size your system against your own MPPKVVCL bill, install it, file the net-metering application with the West Discom and claim your ₹78,000 central subsidy. You sign. We do the running.

Authorised Adani Solar distributor₹78,000 subsidy handled end-to-endMPPKVVCL net metering filed for youFree survey, no advance payment

Get your free Ujjain solar quote

Send your bill and pin code. An engineer calls back with your system size, cost after subsidy, generation estimate and payback, usually inside two working hours.

Free site survey. No advance payment.

Prefer to talk? +91 63904 05060

Distribution licensee
MPPKVVCL (MP West Discom)
Same licensee as Indore, not the Bhopal company
Regulator
MPERC
Sets the net-metering framework
Solar resource
About 5.5 peak sun hours
Among the stronger resources in central India
Generation
4 to 4.5 units per kW daily
Annual average, shadow-free roof
Central subsidy
Up to ₹78,000
Residential, 3 kW and above
Typical payback
3.5 to 5 years
Residential on-grid

The short answer

Rooftop solar in Ujjain costs roughly ₹53,000 to ₹77,000 per kW before subsidy, so a 3 kW system runs about ₹1.85 lakh to ₹2.30 lakh. That falls to ₹1.07 lakh to ₹1.52 lakh after the ₹78,000 PM Surya Ghar subsidy. Each kW generates 4 to 4.5 units a day. MPPKVVCL, the MP West Discom, handles Ujjain net metering. Payback lands between three and a half and five years.

Last reviewed 18 September 2026 · Heaven Green Energy engineering team

Price, size and savings

Find your bill. Read across.

Most Ujjain solar pages hide the price behind a callback form or repeat a national average that fits nobody. This table answers the whole question. Find your monthly bill on the left, then read across for size, output, roof area and what you actually pay after subsidy. The bands cover a complete installed system: modules, inverter, structure, protection, cabling and labour. Nothing in that table is a deposit price or a panel-only price.

Indicative Ujjain market ranges, 2026
Your monthly bill System Generates Roof needed Cost after subsidy Payback
Up to ₹1,800 2 kW 1–2 BHK, one AC used sparingly 240–270units/month ~200 sq ft ₹70,000 – ₹1.00 lakh ₹1.30 lakh–₹1.60 lakh before ₹60,000 subsidy 3.5–4.5 years
₹2,000–₹3,500 3 kW Best value The largest system that still earns the full ₹78,000 360–405units/month ~300 sq ft ₹1.07 lakh – ₹1.52 lakh ₹1.85 lakh–₹2.30 lakh before ₹78,000 subsidy 3.5–4.5 years
₹3,500–₹6,000 5 kW 3 BHK running two ACs through summer 600–675units/month ~500 sq ft ₹2.12 lakh – ₹2.72 lakh ₹2.90 lakh–₹3.50 lakh before ₹78,000 subsidy 4–5 years
₹6,000–₹13,000 10 kW Bungalows, clinics, shops, coaching institutes 1,200–1,350units/month 700–1,000 sq ft ₹4.52 lakh – ₹5.62 lakh ₹5.30 lakh–₹6.40 lakh before ₹78,000 subsidy 4–5 years
Above ₹13,000 25 kW+ Commercial connections, on accelerated depreciation 3,000–3,400units/month Site-specific ₹11.00 lakh – ₹13.75 lakh ₹11.00 lakh–₹13.75 lakh, no subsidy 3–4.5 years

Indicative Ujjain market ranges for 2026, covering Tier-1 modules, a branded inverter, galvanised structure, protection and installation. These are not a Heaven Green quotation. Subsidy amounts are the central PM Surya Ghar figures published on pmsuryaghar.gov.in. Generation assumes a shadow-free, roughly south-facing roof.

Size against units, not rupees. Read the units figure off your last MPPKVVCL bill rather than the amount payable, because units are what a solar system cancels. Shadow-free matters as much as area. In the lanes around Ram Ghat and Dani Gate, roofs sit close together. A neighbour's water tank shading the array for two hours a day quietly removes a tenth of your annual output. An elevated structure costs more steel and earns it back.

Watch the roof you are quoting on. Ujjain has a wide mix of stock: RCC terraces in Freeganj and the newer colonies, older load-bearing roofs in the old city, and sheet roofs on mandi and industrial sheds. Each takes a different mounting design, and a vendor who quotes a price before seeing the roof is quoting a guess. The survey exists to settle that question, not to sell you anything.

The 3 kW cliff is real. PM Surya Ghar pays nothing above 3 kW, so the subsidy covers 34 to 42% of a 3 kW system and only 12 to 15% of a 10 kW one. If your consumption sits on the border, 3 kW returns more rupees per rupee spent.

A cheap Ujjain quote is cheap in the steel, not the glass. Galvanising thickness, cable gauge, earthing and surge protection separate the bottom of each band from the top. One local warning: quotes pitched at hotels and dharamshalas around the temple belt are often sized on Simhastha-season occupancy rather than an ordinary month. That oversizes the system and fails feasibility. Ask for a written Bill of Materials with make, model and quantity, or you are not comparing prices at all.

Why there is no rupee saving in that table

You will notice no rupee saving in that table. The rupee figure depends on the tariff slab you personally sit in, which is printed on your own MPPKVVCL bill and differs between consumers and categories. Guessing it here would be dishonest. Bring your last bill to the free survey and we work the exact number out with you, in front of you. That is also the visit where we tell you if solar is a poor fit for your roof, which happens often enough to be worth saying out loud. Prefer to work it out yourself first? Put your bill into our solar savings calculator. No phone number required.

This is what we actually build.

Heaven Green Energy installations across India. Not stock photography, and not renders. Your Ujjain system is built to the same specification.

Rooftop solar array photographed against a city skyline at sunset
Residential rooftop
Long row of solar modules on a commercial building rooftop photographed at sunrise
Commercial rooftop
Elevated solar canopy structure mounted above a terrace, leaving the floor below usable
Elevated structure
Wall of dozens of string inverters mounted in neat rows at a large solar installation
Electricals

PM Surya Ghar Muft Bijli Yojana

₹78,000

Maximum central subsidy for a residential rooftop system.

  • ₹30,000 per kW for the first 2 kW
  • ₹18,000 for the 3rd kW
  • Nothing paid above 3 kW
  • Credited directly to your bank account
  • We file the entire claim for you
How the subsidy works

Five steps, and we run four of them.

Any vendor advertising a bigger "Ujjain subsidy" is selling something that does not exist. PM Surya Ghar is a central scheme, so the amount is the same in Ujjain as in Bhopal or Surat. What changes city to city is which utility processes your file, and here that is MPPKVVCL. Get that wrong and the file sits unprocessed while you assume it is moving.

1

Register on the National Portal

You register at pmsuryaghar.gov.in with your MPPKVVCL consumer number, mobile, Aadhaar and address. We sit with you for this step, because a consumer number that does not match MPPKVVCL records is the commonest reason an Ujjain application stalls before it starts.

2

Apply for feasibility, then pick your vendor

MPPKVVCL checks the application against your sanctioned load. You then choose a vendor from the empanelled list. Heaven Green Energy is empanelled, so we map straight to your application without a second registration.

3

Install after approval, never before

We supply Adani modules with traceable serial numbers and hand over a Bill of Materials and warranty schedule on the day. Installing ahead of feasibility approval is how roofs end up generating with no approved net meter.

4

Inspection and net meter

MPPKVVCL inspects the installation and fits the bidirectional meter, which generates the commissioning certificate on the portal. Our engineer attends the inspection so queries are answered on the spot rather than by post.

5

Claim and credit

We file the claim once the certificate issues, and the government credits the subsidy directly to your bank account. It never passes through us. Treat any Ujjain vendor offering to collect the subsidy on your behalf as a warning sign.

If you are a business, this section does not apply

PM Surya Ghar covers residential consumers only. An Ujjain hotel, dharamshala, mill or shop cannot claim it. A taxpaying business can instead claim accelerated depreciation on the asset, which often returns more over the first few years than the residential subsidy would have paid.

MPPKVVCL (MP West Discom)

Net metering: who you actually file with.

Net metering is where competing Ujjain pages get the facts wrong, and the mistake costs you every export credit you were counting on. Here is the correct licensee and the correct order of operations.

Ujjain is supplied by Madhya Pradesh Paschim Kshetra Vidyut Vitaran Company Limited (MPPKVVCL), the West Discom headquartered in Indore. The Ujjain district administration lists it as the district's electricity utility, with its office on Maksi Road at Madhav Nagar. Ujjain therefore sits with the same licensee as Indore, Dewas and Ratlam.

Madhya Pradesh splits distribution three ways, and this is where rival pages slip. MPMKVVCL, the Madhya Kshetra or Central company, runs Bhopal from portal.mpcz.in. MPPoKVVCL, the Poorv Kshetra or East company, runs Jabalpur from mpez.co.in. Neither of them touches Ujjain. A page that files you with the Central company because Ujjain "feels central" on a map has pointed you at the wrong utility, and your application goes nowhere.

Commercial terms are set by the Madhya Pradesh Electricity Regulatory Commission (MPERC), not by the discom and not by us. Under the MPERC framework your system is capped at your sanctioned load, and every consumer category may apply. Surplus units you export are credited against units you draw back at night or through the monsoon.

1

Application

Consumer details, sanctioned load, system rating, single-line diagram and equipment datasheets go to MPPKVVCL under your name.

Filed by us
2

Technical feasibility

The discom tests whether your sanctioned load and the local transformer carry the proposed capacity. Oversized systems are rejected here, which is why we size against sanctioned load on the first visit.

MPPKVVCL
3

Installation and inspection

We install once feasibility clears. MPPKVVCL then inspects earthing, protection, isolation and metering compliance before anything is energised.

Us, then MPPKVVCL
4

Bidirectional meter

Your existing meter is swapped for a bidirectional net meter and the commissioning certificate issues. Export credits begin from that date, not from installation.

MPPKVVCL
Solar panels installed flush on a corrugated metal factory roof with industrial buildings behind
Not a home?

Solar for Ujjain's businesses.

Running a hotel, dharamshala, mill, cold store or clinic rather than a home? The economics work differently, the subsidy does not apply, and this page is written for householders.

Businesses get no PM Surya Ghar subsidy at all. That holds on Dewas Road, in the Maksi Road industrial area at Vikram Udyogpuri, the Tajpur industrial area and the Grasim belt at Birlagram in Nagda. They claim accelerated depreciation on the asset instead, which for a taxpaying firm often returns more than the residential subsidy would. They can also skip the capital outlay entirely through OPEX or RESCO models.

Two Ujjain segments repay a proper load study rather than a rule of thumb:

  • Temple-belt hotels and dharamshalas, where occupancy swings hard between ordinary and festival months. Size the system on the base load, not the peak. Twelve months of bills settle that question; a festival month never should.
  • Agro and food processing around the Chimanganj mandi belt, where daytime motor load lines up almost perfectly with solar generation.

We deliver turnkey commercial and industrial EPC across the Ujjain belt, with structural design to wind-load standards, MPPKVVCL registration and long-term O&M.

Why us

Why Ujjain customers choose Heaven Green Energy

We have built solar since 2017 and delivered more than 10,000 installations across India, from single rooftops to industrial plants running into hundreds of kilowatts. Four things decide whether an Ujjain customer stays with us after the first quote.

Authorised Adani Solar distributorGenuine Adani modules with traceable serial numbers and the full manufacturer warranty. No grey-market stock, and no obscure brand that has vanished by year eight when you need a claim honoured.
We build our own invertersQbits is our in-house inverter brand. Service on the component most likely to need it runs through us, not through an importer who may or may not still stock the model.
The paperwork is our jobPortal registration, vendor mapping, MPPKVVCL feasibility and net metering, inspection and the subsidy claim all sit with our team. Your part is signing the forms and attending the survey.
Nothing to pay for the surveySurvey and written proposal cost nothing and commit you to nothing. You keep the Bill of Materials, generation estimate and payback figure, and you are free to price them against any Ujjain rival.

Where we are based

Heaven Green Energy is headquartered at Mota Varachha, Surat. We have no branch office in Ujjain and will not pretend otherwise. We serve Ujjain and the wider Malwa region through our channel partner network and field engineering team, who run the surveys, supervise installation and handle MPPKVVCL coordination on the ground. We state this before you sign rather than after.

How we work

From first call to a spinning net meter.

Four steps to a spinning net meter, including the parts that belong to MPPKVVCL rather than to us, and the honest timeline for each.

01

Free site survey

We measure shadow-free roof area, check the structure, read your sanctioned load and twelve months of MPPKVVCL consumption, and log shading from tanks, parapets and neighbouring buildings.

Day 1–2
02

Written proposal

System size, layout, Bill of Materials with makes and models, generation estimate at Ujjain irradiance, your subsidy and your payback. No obligation attached.

Day 3–5
03

Applications and installation

We file with the national portal and MPPKVVCL, then install once feasibility clears. A typical Ujjain residential roof takes two to four days of work.

Day 5–15
04

Inspection, meter, subsidy

MPPKVVCL inspects and fits the bidirectional meter, the commissioning certificate issues, and we file your claim. Government pays the subsidy into your account.

Set by MPPKVVCL

What Ujjain weather does to a solar system

A system specified for a coastal Gujarat roof is the wrong system for the Malwa plateau. Ujjain sits at roughly 494 metres with hot dry summers and a short concentrated monsoon. Three local conditions change the engineering here, and a vendor who ignores them quotes you less and delivers less.

A genuinely hot May

Ujjain's mean daily maximum in May is 40.9°C on the IMD 1991 to 2020 normals, and the recorded extreme is 46°C. Module output falls as cell temperature climbs, so airflow is the fix: real clearance between module and roof, so heat escapes underneath. A structure bolted flush to the terrace to save steel costs you generation every summer for twenty-five years.

Plateau dust and soiling

Dry-season dust sits on the glass from March to June and is the most underrated cause of weak output in Ujjain, precisely because it is invisible from the ground. Roofs near the mandi belt, the Dewas Road corridor and unsurfaced approach lanes soil fastest. Plan on cleaning every two to three weeks through the dry months. Our AMC covers it. Cleaning is water and a soft brush, not a specialist job.

A short, heavy monsoon

Ujjain takes about 929 mm of rain across roughly 41 rainy days a year, concentrated into July and August. That means intense rain and squally wind in short bursts rather than a long coastal soak. Galvanising thickness, foundation design and fastener grade keep the array on the roof through those bursts, and earthing with surge protection guards the inverter.

Service area

Areas of Ujjain we install in.

We install across Ujjain city, the surrounding tehsils and the district's industrial towns, from the lanes behind Mahakal to the Grasim belt at Nagda. An area missing from this list is not an area we refuse, so call and ask.

Old city and the Mahakal quarter Pin 456006, 456003

Shri Mahakal · Ram Ghat · Ramghat Marg · Harsiddhi Marg · Dani Gate · Nayapura · Juna Somvariya · Peepli Naka · Garh Kalika · Rudrasagar · Bherugarh · Kaliadeh

Freeganj, Agar Road and the north Pin 456001, 456006, 456010

Freeganj · Agar Road · Chimanganj Mandi · Dewas Gate · Daulatganj · Tower Chowk · Bharatpuri · Madhav Nagar · Maksi Road · Kothi Road · Rishi Nagar · Vikram University

South and outer Ujjain Pin 456006, 456010, 456664, 456661

Nanakheda · Vikram Nagar · Pingleshwar · Chintaman Ganesh · Undasa · Ninora · Karohan · Panthpiplai · Surasa · Takwasa · Matana Kalan · Tajpur

Industrial belt and district towns Pin 456331, 456335, 456224, 456221, 456550, 456665, 456771, 456222

Dewas Road industrial area · Vikram Udyogpuri · Narwar · Nagda · Birlagram · Khachrod · Badnagar · Unhel · Ghatia · Tarana · Makdone · Ingoria · Kaytha

Customers

Real customers, real cities.

These are real Heaven Green customers, each shown with the city where that system was installed. We do not re-tag reviews to whichever city page you happen to be reading.

★★★★★
My electricity bill dropped from ₹7,800 to less than ₹400 in two months. PM Suryaghar paperwork, DISCOM approval, net meter, they handled everything.
Rameshbhai Patel
Residential · Surat · 5 kW
★★★★★
150 kW at our textile factory dropped power costs by 68%. The ROI calculation they provided was spot-on, break-even under 4 years.
Mihir Shah
Commercial · Surat · 150 kW
★★★★★
80 kW on our hospital rooftop. Diesel backup running time cut by 60%. Heaven Green's structural design cleared all wind-load checks first time.
Nilesh Bhatt
Commercial · Anand · 80 kW
Before you sign

Six things to check on any Ujjain quote.

Including ours. Take this list to every vendor you speak to.

Questions

Solar in Ujjain: every question answered.

17 questions Ujjain buyers actually search for, including the ones competing pages leave out. Grouped so you can skip to what you need.

Cost & subsidy

What is the cost of solar panel installation in Ujjain in 2026?
Roughly ₹53,000 to ₹77,000 per kW installed before subsidy, with the per-kW rate falling as the system grows. That puts 3 kW at ₹1.85 to ₹2.30 lakh, 5 kW at ₹2.90 to ₹3.50 lakh and 10 kW at ₹5.30 to ₹6.40 lakh. Structure quality and protection specification drive the spread.
What is the price of a 3 kW solar system in Ujjain with subsidy?
Between ₹1.07 lakh and ₹1.52 lakh net, from ₹1.85 to ₹2.30 lakh less the ₹78,000 subsidy. A 3 kW system generates 360 to 405 units a month in Ujjain, which covers a household using 300 to 400 units. It is the smallest system earning the full subsidy.
How much subsidy do I get on solar panels in Ujjain?
Up to ₹78,000. Per pmsuryaghar.gov.in, PM Surya Ghar pays ₹30,000 per kW for the first 2 kW and ₹18,000 for the third kW, then nothing beyond. So 1 kW earns ₹30,000, 2 kW earns ₹60,000 and 3 kW or larger earns ₹78,000, credited straight to your bank account.
Can I get rooftop solar on EMI or a loan in Ujjain?
Yes. Residential rooftop solar falls under priority-sector lending and several banks and NBFCs finance it. Most Ujjain households finance the pre-subsidy amount, then prepay principal once the subsidy lands. We can introduce financing partners, though comparing their terms against your own bank is the smarter move.

Net metering & DISCOM

Which DISCOM serves Ujjain for rooftop solar?
MPPKVVCL, Madhya Pradesh Paschim Kshetra Vidyut Vitaran Company Limited, the West Discom headquartered in Indore. The Ujjain district administration lists it as the district utility, with an office on Maksi Road at Madhav Nagar. Ujjain shares this licensee with Indore, Dewas and Ratlam.
Is Ujjain under the Bhopal or the Indore electricity company?
Indore. Madhya Pradesh has three distribution companies: MPPKVVCL in the west covering Ujjain, MPMKVVCL in Bhopal covering the centre, and MPPoKVVCL in Jabalpur covering the east. Filing an Ujjain application with the Bhopal company achieves nothing, and several solar sites list the city wrongly.
Is net metering available in Ujjain, and what happens to surplus units?
Yes. Under the MPERC framework your system may be sized up to your sanctioned load and all consumer categories qualify. Your home uses solar first by day and exports the surplus to MPPKVVCL as credit against units drawn at night. A bright March to May surplus then banks against the monsoon dip.
How long does MPPKVVCL net metering take in Ujjain?
Usually a few weeks from application to installed bidirectional meter, covering feasibility, post-installation inspection and the meter swap. Installation itself is only days of that. The discom-controlled steps set the pace and no installer can compress them, so treat a guaranteed one-week net meter as a red flag.

Sizing & performance

How many units does 1 kW of solar generate per day in Ujjain?
About 4 to 4.5 units daily averaged across the year. Ujjain gets roughly 5.5 peak sun hours, among the stronger resources in central India. Output beats that average from March to May and drops through the July to September monsoon. Over a year, expect about 1,460 to 1,640 units per kW.
What size solar system do I need for a 2 BHK or 3 BHK home in Ujjain?
A 2 BHK usually needs 2 to 3 kW and a 3 BHK 3 to 5 kW, but size against consumption rather than floor plan. Pull the units figure from twelve months of MPPKVVCL bills and pick the system that covers your average month, not your worst one.
How many ACs can run on a 3 kW or 5 kW solar system in Ujjain?
A 1.5-ton split AC draws 1.2 to 1.5 units per hour while the compressor runs. A 3 kW system making 12 to 13.5 units a day supports one AC by day plus normal household load. Two ACs through a 40°C Ujjain May needs 5 kW. At night you draw grid power against banked credits.
How much roof area do I need for solar in Ujjain?
About 200 sq ft for 2 kW, 300 sq ft for 3 kW and 500 sq ft for 5 kW, rising to 700 to 1,000 sq ft for 10 kW. The area must be shadow-free through the working day. On tight old-city plots an elevated structure recovers area lost to tanks and stairwells.

Installation & service

How long does solar installation take in Ujjain?
Two to four days of physical work on a typical residential roof, inside an end-to-end timeline of roughly two to six weeks. The long part is not the installation but the MPPKVVCL feasibility check, inspection and meter swap, which run on the discom's schedule rather than ours.
How often should solar panels be cleaned in Ujjain?
Every two to three weeks from March to June, when Malwa dust builds fastest, and monthly for the rest of the year. Dust is invisible from ground level yet measurably cuts output. Our AMC covers scheduled cleaning, inspection of connections and a generation check against the estimate.
Do solar panels survive Ujjain's monsoon and summer heat?
Yes, when the structure is specified properly. Tier-1 modules are rated for hail and high wind; the failure point in cheap installations is the mounting steel and the earthing. Ujjain's rain arrives in short heavy bursts, so galvanising thickness, fastener grade and surge protection matter more than panel brand.

About Heaven Green

Does Heaven Green Energy have an office in Ujjain?
No. Our single office is at Mota Varachha, Surat, and we say so plainly rather than advertising a local address we do not have. Ujjain work runs through our channel partner network and field engineering team, who handle surveys, installation supervision and MPPKVVCL coordination on site.
Are the customer reviews on this page from Ujjain?
No, and we will not relabel them. Every review is shown with the city where that system was actually installed, which is how you can tell a genuine review set from a fabricated one. We are happy to discuss comparable Malwa installations during the survey instead.
Nearby

We also install around Ujjain.

Every city we cover is listed in the solar by location directory.

Free Ujjain site survey No advance payment, no obligation Get my quote
Call WhatsApp