Solar panel installation in Botad.

Heaven Green Energy is an authorised channel partner of Adani for solar modules and an empanelled PM Surya Ghar vendor. Your roof might be a house near Tower Chowk, a ginning shed on Paliyad Road or a Botad taluka farmhouse. We size from your PGVCL bill, install, file net metering and follow the subsidy to your account.

Authorised channel partner of AdaniSubsidy file run until the money landsPGVCL Botad circle paperwork filedFree roof survey, no advance

Request a Botad solar estimate

Send a photo of your last PGVCL bill with your society, village or pin code. An engineer calls back with a suggested size, a cost band after subsidy and a payback range.

Free site survey. No advance payment.

Prefer to talk? +91 63904 05060

Your DISCOM
PGVCL (Paschim Gujarat Vij)
Botad circle, Bhavnagar zone. Not Torrent or UGVCL
Regulator
GERC
Sets rooftop and net-metering rules statewide
Sun hours
About 5.5 peak sun hours
Inland Saurashtra, dry for eight months
Output per kW
4 to 4.5 units a day
Annual average on a clear roof
Home subsidy
Up to ₹78,000
Residential only, maximum from 3 kW
Payback
3.5 to 5 years
Typical for on-grid homes

The short answer

In Botad, a 3 kW rooftop solar system costs about ₹1.80 lakh to ₹2.25 lakh before subsidy. That falls to ₹1.02 lakh to ₹1.47 lakh after the ₹78,000 PM Surya Ghar credit. Each kW generates 4 to 4.5 units a day. Botad is supplied by Paschim Gujarat Vij Company Limited (PGVCL) through its Botad circle, which processes net metering. A home system typically pays back in three and a half to five years.

Last reviewed 2 October 2026 · Heaven Green Energy engineering team

Price, size and savings

Find your bill. Read across.

Start with the figure in rupees, then check it against your own bill. Find the band that matches your last PGVCL bill in the left column. Then read across: system size, monthly units, the roof it needs and the cost once the subsidy is credited.

Indicative Botad market ranges, 2026
Your monthly bill System Generates Roof needed Cost after subsidy Payback
Up to ₹1,800 2 kW A 1 BHK or a ground-floor home in the old bazaar lanes with fans, a fridge and one cooler 240–270units/month ~200 sq ft ₹65,000 – ₹95,000 ₹1.25 lakh–₹1.55 lakh before ₹60,000 subsidy 3.5–4.5 years
₹2,000–₹3,500 3 kW Best value A family home near Station Road or Gadhada Road that wants the full ₹78,000 subsidy 360–405units/month ~300 sq ft ₹1.02 lakh – ₹1.47 lakh ₹1.80 lakh–₹2.25 lakh before ₹78,000 subsidy 3.5–4.5 years
₹3,500–₹6,000 5 kW A two-storey bungalow on Paliyad Road running two ACs through the March to June heat 600–675units/month ~500 sq ft ₹2.07 lakh – ₹2.67 lakh ₹2.85 lakh–₹3.45 lakh before ₹78,000 subsidy 4–5 years
₹6,000–₹13,000 10 kW A diamond-polishing workshop, clinic or wholesale shop with daytime load 1,200–1,350units/month 700–1,000 sq ft ₹4.42 lakh – ₹5.52 lakh ₹5.20 lakh–₹6.30 lakh before ₹78,000 subsidy 4–5 years
Above ₹13,000 25 kW+ Ginning and pressing sheds, oil mills and cold rooms near the Haddad cotton yard 3,000–3,400units/month Site-specific ₹10.75 lakh – ₹13.50 lakh ₹10.75 lakh–₹13.50 lakh, no subsidy 3–4.5 years

These are indicative Botad market ranges for 2026 for a complete on-grid system: Tier-1 modules, a branded inverter, galvanised mounting, protection gear and installation. They are not a Heaven Green quotation, which follows a site survey. Subsidy figures are the central PM Surya Ghar amounts published on pmsuryaghar.gov.in. Rooftop solar systems attract 5% GST on the equipment since 22 Sep 2025. A supply-and-install contract taxes 30% of the value as installation service at 18%, so the blended rate on a typical quote is about 8.9%. Generation assumes a roughly south-facing roof with no shade.

Units decide the size, not the rupee total. Your PGVCL bill prints units consumed and the amount payable. Size the array from the units, because the amount swings with slab, fuel surcharge and duty while the units are what the panels actually replace. Two Botad households paying similar amounts can need different systems.

Why 3 kW is the usual answer for a Botad home. The subsidy pays ₹30,000 on each of the first two kilowatts and ₹18,000 on the third, and nothing beyond. On a 3 kW system it covers close to a third of the price; on 10 kW it is closer to an eighth. If your bill sits on the border between two bands, the smaller size usually returns more per rupee.

Compare the parts list, not the headline. Two quotes for the same kW can differ in structure steel, cable size, earthing and surge protection, and those are what fail first on a dusty inland roof. Ask each vendor for a written Bill of Materials with make, model and quantity for every item. A quote without one cannot be compared fairly with one that has it.

Why there is no rupee saving in that table

The table gives units, not a rupee saving, and that is on purpose. What a generated unit is worth to you depends on the tariff slab printed on your own PGVCL bill. A residential connection in Sahakar Nagar Society is billed differently from a commercial one near the marketing yard. At the free survey we work the saving out from your bill, your slab and your sanctioned load, so the number you see is yours and not a district average. Prefer to work it out yourself first? Put your bill into our solar savings calculator. No phone number required.

This is what we actually build.

Heaven Green Energy installations across India. Not stock photography, and not renders. Your Botad system is built to the same specification.

Rooftop solar array photographed against a city skyline at sunset
Residential rooftop
Long row of solar modules on a commercial building rooftop photographed at sunrise
Commercial rooftop
Elevated solar canopy structure mounted above a terrace, leaving the floor below usable
Elevated structure
Wall of dozens of string inverters mounted in neat rows at a large solar installation
Electricals

PM Surya Ghar Muft Bijli Yojana

₹78,000

Maximum central subsidy for a residential rooftop system.

  • ₹30,000 per kW for the first 2 kW
  • ₹18,000 for the 3rd kW
  • Nothing paid above 3 kW
  • Credited directly to your bank account
  • We file the entire claim for you
How the subsidy works

Five steps, and we run four of them.

Botad has no subsidy of its own and Gujarat adds no top-up to the central scheme. PM Surya Ghar pays the same amount in Botad as anywhere else in India. The only local piece is the utility that handles your file, and here that is PGVCL through its Botad circle.

1

Register with your consumer number

Registration happens on pmsuryaghar.gov.in using the PGVCL consumer number from your bill, your mobile, Aadhaar and address. We check the consumer number against the bill before you submit, because a name or number mismatch is what holds up most Botad files at the first stage.

2

Feasibility from PGVCL, then vendor selection

PGVCL reviews the request against your sanctioned load and the local transformer, then gives technical feasibility. You choose an empanelled vendor on the portal. Heaven Green Energy is on that list, so your application links to us directly.

3

No installation before approval

Fitting panels before feasibility is granted can cost you the whole subsidy. After approval we supply Adani modules with serial numbers you can trace, and give you the Bill of Materials and warranty papers when the system is commissioned.

4

Inspection and new meter

A PGVCL official inspects the system and the sub-division installs a bidirectional meter. That step produces the commissioning record on the portal. Our engineer is present for the inspection so any query is settled on the roof that day.

5

Claim filed, money to your bank

We submit the claim as soon as the commissioning record appears. The central government pays the subsidy straight into your bank account. It never passes through the installer, so be wary of any Botad vendor who asks to receive it for you.

If you are a business, this section does not apply

PM Surya Ghar covers residential connections only. A ginning factory, oil mill, diamond workshop or shop on Tower Chowk cannot claim it, and neither can an agricultural pump connection. Businesses claim accelerated depreciation instead; farmers should look at PM-KUSUM for solar pumps.

PGVCL (Paschim Gujarat Vij)

Net metering: who you actually file with.

Your file goes to PGVCL. Botad sits inside Paschim Gujarat Vij Company Limited's licence area. The district has its own PGVCL circle office, so you are not routed to Bhavnagar or Rajkot for the paperwork.

Electricity in Botad is distributed by Paschim Gujarat Vij Company Limited (PGVCL), the GUVNL company that supplies Saurashtra and Kutch. Botad is one of its twelve licence districts. PGVCL runs a Botad circle office at the Old Power House Compound in Botad, which reports to its Bhavnagar zone. Under it, the Botad division covers the town sub-divisions (Botad Town-1 and Botad Town-2) plus Botad Rural, Paliyad, Barwala and Ranpur. A separate Gadhada division handles Gadhada and the villages around it. The exact sub-division for your connection is printed on your bill.

One point confuses people here. Barwala and Ranpur talukas were part of Ahmedabad district until Botad district was carved out in August 2013, and some addresses and post offices still show Ahmedabad. That does not put them under Torrent Power, which is licensed for Ahmedabad city, or under UGVCL. They are PGVCL connections and their net-metering files go through the Botad circle.

The commercial rules do not come from PGVCL. They are set by the Gujarat Electricity Regulatory Commission (GERC), whose rooftop solar regulations apply to every licensee in the state. Your system size is limited by your sanctioned load, and exported units are adjusted against imported units on your bill rather than paid in cash. If you want a larger array than your load allows, a load extension request has to go in first, and we check that before quoting.

1

File with your sub-division

Consumer details, sanctioned load, system rating, single-line diagram and roof layout go to the PGVCL sub-division named on your bill, with the registration fee.

Filed by us
2

Feasibility check

PGVCL checks the distribution transformer and feeder capacity against your proposed rating and issues the approval that allows installation to begin.

PGVCL
3

Install and test

We erect, earth and commission the system, then lodge the test report and completion papers so the meter change can be booked in one visit.

Filed by us
4

Inspection and bidirectional meter

Our engineer attends the PGVCL inspection. The bidirectional meter is fitted and export credit shows from the next billing cycle.

Us, then PGVCL
Solar panels installed flush on a corrugated metal factory roof with industrial buildings behind
Not a home?

Solar for Botad's businesses.

Botad runs on cotton and diamonds, and both businesses use most of their power in daylight, which is when a rooftop array produces.

Botad's APMC market yard is on Paliyad Road, and the cotton sub-yard sits beside it at Haddad (Hadadad in some trade listings). Ginning and pressing factories line Paliyad Road and the Haddad side, with cottonseed oil mills alongside them. The town is also a diamond cutting and polishing centre, with small workshops spread through the residential lanes. Ginning sheds give you a large flat or pitched roof and a heavy daytime motor load in the cotton season. A polishing workshop gives you a steady load from lights, fans and wheels through working hours.

None of these can claim PM Surya Ghar, which is for homes. A business instead claims accelerated depreciation on the solar asset, which for a profitable taxpayer is often worth more than the home subsidy. It can also pay through a zero down payment arrangement where the instalment sits below the bill it replaces.

Farm connections are a separate case. Gujarat moved farm supply onto separate agricultural feeders under Jyotigram Yojana, and a rooftop net-metering file does not cover a pump connection. Farming cotton in a Botad, Gadhada or Barwala village and want to replace grid or diesel pumping? Read our PM-KUSUM page and the GEDA guide to KUSUM in Gujarat. A farmhouse with its own residential connection can still take a rooftop system under PM Surya Ghar.

  • Ginning sheds need a structural check of the purlins before any rating is quoted.
  • Seasonal load means sizing against the full year's units, not the busiest month.
  • Lint near the gins needs a cleaning schedule written into the maintenance contract.
Why us

What Botad customers get from Heaven Green Energy

We have installed since 2017 and passed 10,000 installations across Gujarat. Here is what that means for a Botad roof in practical terms.

PGVCL Botad circle filings handledPortal registration, the sub-division application, feasibility, test report and inspection attendance are our job. You do not have to learn the Botad Town or Botad Rural office routine yourself.
Adani modules and Qbits invertersWe are an authorised channel partner of Adani and install only Adani panels. Inverters are Qbits, our group's own brand, so warranty support does not depend on a distant importer.
A Bill of Materials before you payYou get make, model and quantity for modules, inverter, structure, cable, earthing and protection in writing. That sheet is what lets you compare our quote with a local installer's on equal terms.
Survey first, no advanceAn engineer measures the roof, checks shading from water tanks and neighbouring floors, and reads your bill before any price is fixed. Nothing is paid to start.

Where we are based

Heaven Green Energy is headquartered at Mota Varachha, Surat, and that is our only office. We serve Botad and the wider Saurashtra region through our channel partner network and field engineering team, who carry out surveys, supervise installation and handle PGVCL coordination on the ground. We have no branch, address or local phone number in Botad, and we tell you so before you sign rather than after.

How we work

From first call to a spinning net meter.

There are four stages between your first call and the first export credit on your PGVCL bill. The durations below are typical for Botad, not guarantees.

01

Bill review on the phone

We read units, tariff category and sanctioned load from your bill and give an indicative size and price band before anyone visits.

Same day
02

Site survey

An engineer checks shadow-free area, slab or shed condition, cable route and a cool spot for the inverter, in town or in your village.

1–3 days
03

Approvals

Portal registration, the PGVCL application and feasibility. Timing depends on the sub-division's queue and we update you as it moves.

2–5 weeks
04

Installation and commissioning

Structure, modules, inverter, earthing and protection, followed by the PGVCL inspection and bidirectional meter. Generation starts that week.

2–4 days on site

How Botad's weather shapes the system

Botad lies inland, in a shallow valley between low hills where the Utavali stream forms. It has a hot dry summer from mid-March to mid-June, a monsoon that brings roughly 600 mm in a typical year, and mild, dry winters. There is no coastal salt here; the problems are heat, dust and storms.

Dust from fields, roads and the gins

From October to May there is little rain to wash the glass, so dust from black-soil fields and unpaved roads builds up steadily. Near Paliyad Road and Haddad, the ginning season adds cotton lint and fine trash that sticks to panels after dew. Soiling is the loss you can control, so we set the cleaning frequency by where your roof is. A society off Gadhada Road needs less than a shed beside the cotton yard.

Summer highs in the low 40s

Long-run averages put Botad's summer range at roughly 24°C to 42°C, and panels on a sun-baked slab run far hotter than the air. Output drops as cells heat up, so we raise the structure enough for air to move beneath the modules and keep the inverter in shade with ventilation. Both decisions cost almost nothing at installation and protect yield for decades.

June and July storms

Thunderstorms are frequent at the start of the monsoon, with gusty wind ahead of them. A structure that is merely bolted to a parapet can lift in the first storm. We use hot-dip galvanised steel anchored into the slab, sealed cable entries and a tested earthing pit with lightning and surge protection. A storm is when weak earthing shows itself.

Service area

Areas of Botad we install in.

We survey and install across Botad town, the Paliyad Road cotton belt and the villages of all four talukas in the district. If your village is not listed, it is still likely covered. Send your pin code and we will confirm.

Botad town centre and Station Road Pin 364710

Tower Chowk · Din Dayal Chowk · Nagalpar Gate · Krishnasagar Lake area · Station Road · Sahakar Nagar Society · Khodiyar Nagar · Gadhada Road · Bhavnagar Road

Paliyad Road, the cotton yard and nearby villages Pin 364710

Paliyad Road · Yoginagar · Gokuldham Society · Haddad · Turkha · Samadhiyala No. 1 · Samadhiyala No. 2 · Lathidad · Kariyani

Villages of Botad taluka Pin 364710 / 364720

Bhimdad · Bhadravadi · Bambhan · Zamrala · Sherthali · Targhara · Sangvadar · Rangpur · Salaiya · Dhakania · Paliyad · Sarva · Bodi · Kumbhara

Barwala, Ranpur and Gadhada talukas Pin 382450 / 382245 / 364750

Barwala · Salangpur · Rojid · Navda · Kundal · Ranpur · Alampur · Bodia · Gadhada · Ambardi · Reliyana

Customers

Real customers, real cities.

These are real Heaven Green customers, shown with the city where each system was installed. We do not relabel reviews to match the page you are reading, so you will see Rajkot, Surat and Junagadh here rather than Botad.

★★★★★
Compared 5 vendors, Heaven Green's quote was the most transparent. No hidden fees. Adani panels installed on schedule, structure is solid.
Kiran Trivedi
Residential · Rajkot · 4 kW
★★★★★
150 kW at our textile factory dropped power costs by 68%. The ROI calculation they provided was spot-on, break-even under 4 years.
Mihir Shah
Commercial · Surat · 150 kW
★★★★★
10 kW on our farmhouse with battery backup. No more relying on the unreliable rural grid. Their AMC visits are on schedule, panels stay clean.
Hardik Solanki
Residential · Junagadh · 10 kW
Before you sign

Six things to check on any Botad quote.

Including ours. Take this list to every vendor you speak to.

Questions

Solar in Botad: every question answered.

17 questions Botad buyers actually search for, including the ones competing pages leave out. Grouped so you can skip to what you need.

Cost & subsidy

What does a rooftop solar system cost in Botad in 2026?
A 3 kW system costs about ₹1.80 lakh to ₹2.25 lakh before subsidy and ₹1.02 lakh to ₹1.47 lakh after the ₹78,000 PM Surya Ghar credit. A 5 kW system is about ₹2.85 lakh to ₹3.45 lakh before subsidy. These are indicative market ranges, not our quotation.
How much is the Botad solar subsidy?
Up to ₹78,000 for a home: ₹30,000 per kW for the first two kilowatts and ₹18,000 for the third, then nothing more. It is a central scheme, so Botad gets the same amount as Bhavnagar or any other city. There is no extra Gujarat top-up.
Can a ginning factory or diamond workshop in Botad get the subsidy?
No. PM Surya Ghar is only for residential connections. A gin on Paliyad Road or a polishing unit claims accelerated depreciation on the solar asset instead. For a profitable business, that usually saves more tax than the home subsidy would have paid.
Can I install solar in Botad without paying upfront?
Yes, through finance. The loan instalment can be set at or below the bill the system removes, so your monthly outgoing does not rise. It works for homes and businesses. Bring your bill to the survey and we will lay the two cash flows side by side.

Net metering & DISCOM

Which PGVCL office handles net metering in Botad?
PGVCL's Botad circle office at the Old Power House Compound oversees the district. Your file goes to the sub-division printed on your bill, such as Botad Town-1, Botad Town-2 or Botad Rural. We file with the right office for you.
Barwala and Ranpur used to be in Ahmedabad district. Are they under Torrent Power?
No. Torrent Power's licence covers Ahmedabad city, not these talukas. Barwala and Ranpur joined Botad district in 2013 and are PGVCL connections with their own sub-divisions under the Botad circle. Net metering there is filed with PGVCL.
How big a system will PGVCL allow on my Botad connection?
Your system is capped against the sanctioned load in kilowatts shown on your bill. If your consumption justifies a bigger array, apply for a load extension first. We check both figures before quoting so the file is not rejected at feasibility.
How long does PGVCL net metering take in Botad?
Usually two to five weeks from application to feasibility, depending on the sub-division's workload, then a few days for installation, inspection and the meter change. A clean application with matching consumer details avoids the most common delay.

Sizing & performance

What will a 5 kW system produce each month in Botad?
About 600 to 675 units a month on average, based on 4 to 4.5 units per kW each day. Output peaks in the dry months from March to May and dips in cloudy July and August. A shaded or dusty roof will produce less.
What size do I need for a ₹4,000 monthly PGVCL bill?
A bill in the ₹3,500 to ₹6,000 band usually points to a 5 kW system. The right answer comes from your units and sanctioned load rather than the amount. If you are close to the lower edge, 3 kW may give a better return because it takes the full subsidy.
How much roof does a 3 kW system need?
About 300 square feet of roof with no shade, roughly 100 square feet per kW. Water tanks, stair towers and taller neighbouring floors in the older lanes around Tower Chowk often cut usable area, which is why we measure on site before fixing a size.
Does dust from the cotton gins on Paliyad Road affect solar output?
Yes. In the ginning season, lint and fine dust settle on panels near the yard and the gins, and dew makes them stick. Uncleaned panels lose output steadily. Roofs close to Haddad and Paliyad Road need more frequent cleaning than those further into town.

Installation & service

How long does installation take on a Botad house?
Two to four days on site for a typical home, after PGVCL feasibility is granted. Larger ginning shed systems take longer because the roof structure must be checked and sometimes reinforced first. The whole process from first call usually takes several weeks.
Can you install on a farmhouse in a Botad taluka village?
Yes, if the farmhouse has its own residential connection, which can take PM Surya Ghar and net metering. An agricultural pump connection is different. For pumps, the route is PM-KUSUM, covered on our separate KUSUM page and GEDA guide.
What happens if a panel or inverter fails after installation?
Adani modules and Qbits inverters carry manufacturer warranties registered at commissioning. You call our support line and our field team arranges diagnosis and replacement. Because Qbits is our group's own brand, inverter claims are not routed through a third-party importer.

About Heaven Green

Is there a Heaven Green office in Botad?
No. Our only office is at Mota Varachha, Surat. Botad is served by our channel partner network and field engineers, who survey, supervise installation and coordinate with PGVCL locally. We say this upfront so you know who you are dealing with.
Why choose Heaven Green over a local Botad solar company?
Compare on paper. We give a written Bill of Materials, install only Adani modules as an authorised channel partner, use Qbits inverters, handle the PGVCL and subsidy filing, and take no advance. Put any local quote next to ours, item by item.
Nearby

We also install around Botad.

Every city we cover is listed in the solar by location directory.

Free Botad site survey No advance payment, no obligation Get my quote
Call WhatsApp