Solar panel installation in Jamnagar.

Heaven Green Energy installs rooftop solar across Jamnagar as an authorised channel partner of Adani and a PM Surya Ghar empanelled vendor. We size your array against the units printed on your PGVCL bill, install it with coastal-grade hardware, file the net-metering papers with PGVCL and claim your ₹78,000 subsidy. You sign. We do the running about.

Authorised Adani Solar distributor₹78,000 subsidy claimed for youPGVCL net metering filed end-to-endFree survey, no advance payment

Get your free Jamnagar solar quote

Send your last bill and your pin code. An engineer rings back with system size, cost after subsidy and payback, usually inside two working hours.

Free site survey. No advance payment.

Prefer to talk? +91 63904 05060

Distribution licensee
PGVCL (Paschim Gujarat Vij)
Not Torrent Power, which supplies Ahmedabad and Surat city
Regulator
GERC
Sets the rooftop and net-metering framework for all Gujarat licensees
Solar resource
About 5.5 peak sun hours
Among the strongest numbers in India
Generation
4 to 4.5 units per kW daily
Annual average across a Saurashtra year
Central subsidy
Up to ₹78,000
Residential consumers, 3 kW and above
Typical payback
3.5 to 5 years
Residential on-grid, before any tariff rise

The short answer

Rooftop solar in Jamnagar costs roughly ₹60,000 to ₹75,000 per kW before subsidy. A 3 kW system runs about ₹1.80 lakh to ₹2.25 lakh, dropping to ₹1.02 lakh to ₹1.47 lakh once the ₹78,000 PM Surya Ghar subsidy lands. Each kW yields 4 to 4.5 units a day at Saurashtra irradiance. PGVCL handles net metering. Payback falls between three and a half and five years.

Last reviewed 18 September 2026 · Heaven Green Energy engineering team

Price, size and savings

Find your bill. Read across.

Most Jamnagar solar pages hide the price behind a callback form. This table does not. Find your monthly bill in the left column, then read across for the system size, monthly units, roof area needed, cost band and payback. Two systems of the same rating can differ by a lakh, and the difference is almost always in the parts you cannot see from the street.

Indicative Jamnagar market ranges, 2026
Your monthly bill System Generates Roof needed Cost after subsidy Payback
Up to ₹1,800 2 kW 1–2 BHK, one AC used sparingly 240–270units/month ~200 sq ft ₹65,000 – ₹95,000 ₹1.25 lakh–₹1.55 lakh before ₹60,000 subsidy 3.5–4.5 years
₹2,000–₹3,500 3 kW Best value The largest system that still earns the full ₹78,000 360–405units/month ~300 sq ft ₹1.02 lakh – ₹1.47 lakh ₹1.80 lakh–₹2.25 lakh before ₹78,000 subsidy 3.5–4.5 years
₹3,500–₹6,000 5 kW 3 BHK running two ACs through summer 600–675units/month ~500 sq ft ₹2.07 lakh – ₹2.67 lakh ₹2.85 lakh–₹3.45 lakh before ₹78,000 subsidy 4–5 years
₹6,000–₹13,000 10 kW Bungalows, clinics, shops, coaching institutes 1,200–1,350units/month 700–1,000 sq ft ₹4.42 lakh – ₹5.52 lakh ₹5.20 lakh–₹6.30 lakh before ₹78,000 subsidy 4–5 years
Above ₹13,000 25 kW+ Commercial connections, on accelerated depreciation 3,000–3,400units/month Site-specific ₹10.75 lakh – ₹13.50 lakh ₹10.75 lakh–₹13.50 lakh, no subsidy 3–4.5 years

These are indicative Jamnagar market ranges for 2026 covering Tier-1 modules, a branded inverter, galvanised structure, protection, cabling and installation. They are not a Heaven Green Energy quotation. Subsidy figures are the central PM Surya Ghar amounts published on pmsuryaghar.gov.in. Generation assumes a shadow-free, broadly south-facing roof.

Size against units, never against rupees. Your PGVCL bill prints both the amount and the units consumed. Units are what an array actually cancels, so that is the number an honest surveyor asks for. The roof column says shadow-free for a reason: an overhead water tank, a parapet or a neighbour's rising second floor can cost a Jamnagar roof two productive hours. In tight plots around Chandi Bazar or Kadiawad, an elevated structure earns back the extra steel within a few years.

The 3 kW cliff decides most Jamnagar homes. PM Surya Ghar pays ₹30,000 for each of the first two kilowatts and ₹18,000 for the third, then nothing. So the subsidy covers a third or more of a 3 kW system but barely a seventh of a 10 kW one. If your bill sits on the boundary, 3 kW usually returns more rupees per rupee spent.

The Jamnagar-specific warning: ask what grade of steel and what grade of fastener. Sea air off the Gulf of Kutch attacks cheap galvanising and plain mild-steel bolts within a handful of years. Vendors quoting the bottom of these bands are almost always saving money on the mounting structure, the earthing and the cable, not on the panels. Insist on a written Bill of Materials listing make, model, quantity, galvanising thickness and fastener grade. Without it you are not comparing prices, you are comparing adjectives.

Why there is no rupee saving in that table

You will notice the table shows no rupee saving. That is deliberate. Your saving depends on the tariff slab you personally sit in, which is printed on your own PGVCL bill. That slab differs between a domestic connection in Patel Colony and a commercial one in Udyognagar. Guessing it here would be dishonest. Bring your last bill to the free survey and we will work the real number out in front of you. Nobody can price your saving accurately without that piece of paper, and anyone who does it over the phone is guessing. Prefer to work it out yourself first? Put your bill into our solar savings calculator. No phone number required.

This is what we actually build.

Heaven Green Energy installations across India. Not stock photography, and not renders. Your Jamnagar system is built to the same specification.

Rooftop solar array photographed against a city skyline at sunset
Residential rooftop
Long row of solar modules on a commercial building rooftop photographed at sunrise
Commercial rooftop
Elevated solar canopy structure mounted above a terrace, leaving the floor below usable
Elevated structure
Wall of dozens of string inverters mounted in neat rows at a large solar installation
Electricals

PM Surya Ghar Muft Bijli Yojana

₹78,000

Maximum central subsidy for a residential rooftop system.

  • ₹30,000 per kW for the first 2 kW
  • ₹18,000 for the 3rd kW
  • Nothing paid above 3 kW
  • Credited directly to your bank account
  • We file the entire claim for you
How the subsidy works

Five steps, and we run four of them.

Anybody advertising a bigger "Jamnagar subsidy" is selling you a story. PM Surya Ghar is a central scheme, so the amount is identical in Jamnagar, Rajkot and Delhi. What changes city to city is which licensee processes the file, and here that is PGVCL. Everything else about the scheme, the slabs, the cap and the payment route, is fixed nationally.

1

Register on the National Portal

You register at pmsuryaghar.gov.in using your PGVCL consumer number, mobile, Aadhaar and address. We sit with you while you do it, because a consumer number that does not match PGVCL records is the single commonest reason a Jamnagar application stalls for weeks.

2

Apply for feasibility, then pick your vendor

PGVCL checks the application against your sanctioned load and the local feeder. You then choose an empanelled vendor from the portal list. Heaven Green Energy is empanelled, so we map straight onto your application with no detour.

3

Install only after approval

Installation starts once feasibility clears, never before. Anything installed early risks the subsidy outright. We supply Adani modules with traceable serial numbers and hand over a Bill of Materials and the full warranty schedule.

4

Inspection and net meter

PGVCL inspects the installation and fits the bidirectional meter, which generates the commissioning certificate on the portal. Our engineer attends the inspection so queries get answered on the spot rather than by post.

5

Claim and credit

We file the claim the moment the certificate issues. The government credits the subsidy directly into your bank account. It never passes through us, so treat any Jamnagar vendor offering to collect it on your behalf as a red flag.

If you are a business, this section does not apply

PM Surya Ghar covers residential consumers only. A brass unit in Dared or a shop on Ranjit Sagar Road cannot claim it. Businesses claim accelerated depreciation on the asset instead, which for a taxpaying firm frequently returns more than the residential subsidy ever would.

PGVCL (Paschim Gujarat Vij)

Net metering: who you actually file with.

Net metering is where rival Jamnagar pages trip up, and naming the wrong licensee costs you every export credit you were counting on.

Jamnagar is supplied by Paschim Gujarat Vij Company Limited (PGVCL), a GUVNL subsidiary distributing power across Saurashtra and Kutch from its corporate office in Rajkot. Jamnagar has its own PGVCL circle office at Lal Bungalow, with city divisions under it. Jamnagar district is one of the twelve districts in the PGVCL licence area, alongside Rajkot, Morbi, Surendranagar, Bhavnagar, Junagadh, Amreli, Botad, Porbandar, Devbhumi Dwarka, Gir Somnath and Kutch.

PGVCL is not the same company as Torrent Power, the private licensee in Ahmedabad and Surat city. Nor is it MGVCL in central Gujarat, DGVCL in the south or UGVCL in the north. Gujarat has four state discoms and one large private one. A page that tells you to file your Jamnagar application with Torrent has sent you to the wrong counter entirely.

The commercial rules come from the Gujarat Electricity Regulatory Commission (GERC), not from PGVCL and certainly not from us. Under the GERC rooftop framework your system is capped against your sanctioned load, and every consumer category may apply. Exported units are credited against imported units rather than paid out in cash. Two numbers on your bill therefore decide your array size: units consumed and sanctioned load in kilowatts. If you want more capacity than your load permits, the load enhancement application goes in first.

Practically, that means we read two lines off your bill before we quote anything. We tell you at the survey if a load enhancement is needed, rather than discovering it after you have paid an advance to somebody.

1

Application to your sub-division

Consumer details, sanctioned load, system rating, single-line diagram, datasheets and site layout go to your Jamnagar PGVCL sub-division with the registration fee.

Filed by us
2

Technical feasibility

PGVCL tests your distribution transformer and feeder against the proposed rating. Oversized arrays fail here, which is why we size against sanctioned load on the very first visit.

PGVCL
3

Installation and test report

We install, earth and commission the array, then file the test report and completion documents so the meter change can be scheduled without a wasted round trip.

Us, then PGVCL
4

Inspection and bidirectional meter

Our engineer attends the PGVCL inspection. PGVCL swaps your meter for a bidirectional net meter and export credits begin appearing from the next billing cycle.

PGVCL
Solar panels installed flush on a corrugated metal factory roof with industrial buildings behind
Not a home?

Solar for Jamnagar's businesses.

Running a brass unit, a bandhani workshop or a shop rather than a home? The arithmetic is different and this page is written for householders.

Businesses in Udyognagar, Shankar Tekri, the Dared GIDC phases, Hapa and the Lakha Baval belt get no PM Surya Ghar subsidy. They claim accelerated depreciation on the asset instead, which for a taxpaying firm usually beats what the residential subsidy would have paid. A brass turning or forging shop is close to the ideal solar load: the lathes, furnaces and compressors run through the middle of the day. That is exactly when the array produces, so most units are self-consumed rather than exported.

Capital outlay is avoidable too, through OPEX and RESCO structures where you pay per unit and own nothing. We deliver turnkey commercial and industrial EPC across the Jamnagar belt, with structural design to coastal wind-load standards, PGVCL registration and long-term operations and maintenance.

The bandhani dyeing and finishing workshops around the old city sit differently: their load is lighter but their tariff is commercial. The sums still work, usually at smaller ratings on shared or leased roofs.

Why us

Why Jamnagar customers choose Heaven Green Energy

We have built solar since 2017 and completed more than 10,000 installations across India, from single terraces to industrial plants running into hundreds of kilowatts. That includes coastal sites across Saurashtra, where the specification differs from an inland job.

Authorised Adani Solar distributorGenuine Adani modules with traceable serial numbers and the full manufacturer warranty. No grey-market stock and no obscure brand that disappears in year eight, exactly when you need a claim honoured.
We manufacture our own invertersQbits is our in-house inverter brand. Service on the component most likely to need it in year six runs through us directly, not through an importer who may have moved on.
Specified for the coast, not the averageHot-dip galvanised structure, corrosion-rated fasteners and sealed terminations are written into the Bill of Materials you receive. You can check what you are buying rather than take our word for it.
The paperwork is our jobPortal registration, vendor mapping, PGVCL feasibility, net metering, inspection and the subsidy claim all sit with our team. You sign forms and attend the survey. That is the whole of your workload.

Where we are based

Heaven Green Energy is headquartered at Mota Varachha, Surat. We serve Jamnagar and the wider Saurashtra region through our channel partner network and field engineering team. They run the surveys, supervise the installation and handle PGVCL coordination on the ground. There is no Heaven Green branch office, address or local phone number in Jamnagar, and we say so before you sign rather than after.

How we work

From first call to a spinning net meter.

Four steps from first call to a spinning net meter, including the parts that belong to PGVCL rather than to us. Two of the four are ours; two are the licensee's, and we say which is which.

01

Free site survey

We measure shadow-free area, check the roof slab and structure, read your sanctioned load and twelve months of PGVCL units, and log shading from tanks, parapets and neighbouring floors.

Day 1–2
02

Written proposal

System size, layout drawing, Bill of Materials with makes and models, generation estimate at Jamnagar irradiance, your subsidy and your payback. No obligation to proceed.

Day 3–5
03

Applications and installation

We file with the national portal and PGVCL, then install once feasibility clears. A typical Jamnagar residential roof takes two to four working days.

Day 5–15
04

Inspection, meter, subsidy

PGVCL inspects, fits the bidirectional meter and the commissioning certificate issues. We file the claim and the government pays the subsidy into your account.

Set by PGVCL

What Jamnagar weather does to a solar system

A design that survives inland Malwa will not last as long on a Jamnagar terrace. Three coastal Saurashtra conditions change the engineering, and a vendor who ignores them quotes cheaper and delivers less. Ask any Jamnagar vendor to address all three in writing before you compare their price with anyone else's.

Salt-laden air off the gulf

Jamnagar sits on the Gulf of Kutch, and the sea breeze carries salt inland across the whole city, not just Bedi and the port side. Salt attacks thin galvanising, plain fasteners, exposed earthing joints and unsealed DC connectors. Hot-dip galvanised structure, stainless fasteners, sealed junction boxes and proper gland entries are not upgrades here, they are the minimum specification.

Forty-degree summers and cell derating

March through May is hot and humid, with maximums around 40°C and recorded extremes far higher. Module output falls as cell temperature climbs, so airflow beneath the array matters. A structure bolted flat to the terrace to save on steel traps heat and quietly costs you generation every summer for twenty-five years.

Dust, then a short violent monsoon

Rainfall here is modest and erratic, roughly 500 mm concentrated into July and August, so glass stays dusty for long dry stretches and soiling losses build unseen from the ground. Cleaning every two to three weeks through the dry months pays for itself. The flip side is cyclonic wind off the Arabian Sea, which is what fastener grade and foundation design are really for.

Service area

Areas of Jamnagar we install in.

We survey and install across Jamnagar city, the GIDC belt and the surrounding villages. An area missing from this list is not an area we refuse. Send your pin code and we will confirm coverage the same day. Coverage extends out along the Kalavad, Khambhalia and Dhrol roads as well.

Old city and the walled core Pin 361001

Darbargadh · Chandi Bazar · Mandvi Chowk · Bedi Gate · Nagnath Gate · Kalavad Gate · Khambhalia Gate · Lal Bungalow · Patrakar Colony · Kadiawad · Grain Market · Subhash Market · Jawahar Nagar · Panchvati

South-west: Ranjit Nagar and Digvijay Plot Pin 361005

Digvijay Plot · Ranjit Nagar · Summair Club Road · Oshwal Colony · Ranjit Sagar Road · Bassav Nagar · Green City · Eva Park · Sadhana Colony · Mahakali Chowk · Valkeshwari Nagari · Nava Nagna · Pancheshwar Tower · Patel Samaj Road

North and east residential belt Pin 361002, 361006, 361007, 361008

Patel Colony · Park Colony · Pandit Nehru Marg · Ajanta Society · Government Colony · Aradhna Society · Mahavir Society · Indradeep Society · Mohan Nagar · Khodiyar Colony · Defence Colony · Sena Nagar · Gulabnagar · Bedeswer

GIDC belt, Bedi and outer Jamnagar Pin 361004, 361009

Udyognagar · Shankar Tekri GIDC · Dared GIDC Phase II · Dared GIDC Phase III · Gokul Nagar · Industrial Estate · Bedi · Bedi Port · Hapa · Lakha Baval · Khijadiya · Naghedi · Moti Khavdi · Shekhpat

Customers

Real customers, real cities.

These are real Heaven Green Energy customers, shown with the city each system was actually installed in. We do not relabel a Rajkot or Junagadh review as a Jamnagar one to make a page look local.

★★★★★
Compared 5 vendors, Heaven Green's quote was the most transparent. No hidden fees. Adani panels installed on schedule, structure is solid.
Kiran Trivedi
Residential · Rajkot · 4 kW
★★★★★
250 kW industrial system on our chemical plant. Generation has been 8% above estimate every month. Their O&M team is responsive.
Sanjay Joshi
Industrial · Bharuch · 250 kW
★★★★★
10 kW on our farmhouse with battery backup. No more relying on the unreliable rural grid. Their AMC visits are on schedule, panels stay clean.
Hardik Solanki
Residential · Junagadh · 10 kW
Before you sign

Six things to check on any Jamnagar quote.

Including ours. Take this list to every vendor you speak to.

Questions

Solar in Jamnagar: every question answered.

17 questions Jamnagar buyers actually search for, including the ones competing pages leave out. Grouped so you can skip to what you need.

Cost & subsidy

What is the price of a 3 kW solar system in Jamnagar?
A 3 kW rooftop system in Jamnagar sits around ₹1.80 lakh to ₹2.25 lakh installed, before subsidy. After the ₹78,000 PM Surya Ghar subsidy you pay roughly ₹1.02 lakh to ₹1.47 lakh. That covers Tier-1 modules, a branded inverter, galvanised structure, protection and installation.
How much subsidy do I get for rooftop solar in Jamnagar?
Up to ₹78,000 for a residential connection. PM Surya Ghar pays ₹30,000 per kilowatt for the first two kilowatts and ₹18,000 for the third, then nothing beyond 3 kW. The scheme is central, so the amount in Jamnagar is identical to anywhere else in India.
Is a bigger system worth it if the subsidy stops at 3 kW?
It depends on your bill. A 5 kW system in Jamnagar costs about ₹2.85 lakh to ₹3.45 lakh and generates 600 to 675 units a month, so it suits a ₹3,500 to ₹6,000 bill. Below that, 3 kW returns more rupees per rupee spent because the subsidy share is far higher.
When does the subsidy money actually reach me?
After commissioning. PGVCL inspects, fits the net meter and the commissioning certificate issues on the portal. We file the claim at that point and the government credits your bank account directly. The money never passes through Heaven Green Energy or any other vendor.

Net metering & DISCOM

Which electricity company handles solar net metering in Jamnagar?
Paschim Gujarat Vij Company Limited, PGVCL, the GUVNL subsidiary covering Saurashtra and Kutch. Jamnagar has its own PGVCL circle office at Lal Bungalow. Torrent Power supplies Ahmedabad and Surat city, not Jamnagar, and filing with the wrong licensee wastes weeks.
How large a system will PGVCL approve on my connection?
Your array is capped against your sanctioned load in kilowatts under the GERC framework, not against your bill amount. If you want more capacity than the sanctioned load permits, a load enhancement application goes in first. We check both numbers before quoting.
What happens to the units I export to PGVCL?
They are credited against the units you import, under the GERC rooftop and net-metering regulations. It is a unit-against-unit settlement rather than a cash payout, which is why sizing to your own consumption matters more than maximising export.
How long does PGVCL net metering take in Jamnagar?
Feasibility approval usually runs one to three weeks from filing, and the meter change follows inspection after commissioning. Timelines belong to PGVCL, not to us, so we will not promise a date. Our engineer attends the inspection to keep queries from becoming delays.

Sizing & performance

How many units will a solar panel generate in Jamnagar?
Roughly 4 to 4.5 units per kilowatt per day as an annual average, on about 5.5 peak sun hours. That puts a 3 kW system at 360 to 405 units a month and a 5 kW at 600 to 675, assuming a shadow-free, broadly south-facing roof.
How much roof do I need in Jamnagar?
About 200 sq ft for 2 kW, 300 sq ft for 3 kW, 500 sq ft for 5 kW and 700 to 1,000 sq ft for 10 kW. The area must be shadow-free through the productive hours. On tight plots an elevated structure recovers space above a tank or stairwell.
Does salt air off the Gulf of Kutch damage solar panels?
The glass and frames handle it, but structures, fasteners, earthing joints and DC connectors do not unless specified for it. Jamnagar installations want hot-dip galvanised steel, corrosion-rated fasteners and sealed terminations. Cheap quotes cut exactly these items, and the corrosion shows up around year five.
Do Jamnagar panels need frequent cleaning?
Yes through the dry months. Rainfall here is modest and concentrated into July and August, so dust builds on the glass for long stretches and output falls without any visible sign from the ground. Cleaning every two to three weeks from November to June is normal. Our AMC covers it.

Installation & service

How long does installation take in Jamnagar?
Two to four working days on a typical residential roof once PGVCL feasibility has cleared. The total elapsed time from first call to a spinning net meter is usually three to six weeks. Most of that is approval and inspection time that belongs to PGVCL.
Do I have to pay anything for the survey?
No. The survey and the written proposal cost nothing and commit you to nothing. You keep the Bill of Materials, the generation estimate and the payback figure, and you are free to price them against any other Jamnagar vendor.
What warranties come with the system?
Adani modules carry the manufacturer's performance and product warranties, and the inverter carries its own. You receive the warranty schedule in writing with the Bill of Materials at handover, with module serial numbers recorded so a future claim can actually be traced.

About Heaven Green

Does Heaven Green Energy have an office in Jamnagar?
No. Our single office is at Mota Varachha, Surat. Jamnagar work runs through our channel partner network and field engineering team, who carry out surveys, supervise installation and handle PGVCL coordination locally. We state that up front rather than implying a branch that does not exist.
Why should I choose Heaven Green Energy over a local Jamnagar installer?
We are an authorised channel partner of Adani, we build our own Qbits inverters, and we have completed more than 10,000 installations since 2017. Compare us on the Bill of Materials rather than the brochure, which is the comparison we would rather you made anyway.
Nearby

We also install around Jamnagar.

Every city we cover is listed in the solar by location directory.

Free Jamnagar site survey No advance payment, no obligation Get my quote
Call WhatsApp