Solar panel installation in Morbi.

Heaven Green Energy is an authorised channel partner of Adani and a PM Surya Ghar empanelled vendor, installing rooftop solar across Morbi. We size your system against the units printed on your PGVCL bill and install it. We file the net-metering application with Paschim Gujarat Vij and claim your ₹78,000 central subsidy. You sign. We do the running around.

Authorised Adani Solar distributor₹78,000 subsidy handled end-to-endPGVCL net metering filed for youFree survey, no advance payment

Get your free Morbi solar quote

Send us your last bill and your pin code. An engineer calls back with system size, cost after subsidy and payback, usually inside 2 working hours.

Free site survey. No advance payment.

Prefer to talk? +91 63904 05060

Distribution licensee
PGVCL (Paschim Gujarat Vij)
Not Torrent Power, which serves Ahmedabad and Surat
Regulator
GERC
Sets the Gujarat net-metering framework
Solar resource
About 5.5 peak sun hours
Among the strongest in India
Generation
4 to 4.5 units per kW daily
Year-round average
Central subsidy
Up to ₹78,000
Residential consumers, 3 kW and above
Typical payback
3.5 to 5 years
Residential on-grid

The short answer

Rooftop solar in Morbi costs about ₹1.80 lakh to ₹2.25 lakh for 3 kW before subsidy, and ₹1.02 lakh to ₹1.47 lakh after the ₹78,000 PM Surya Ghar subsidy. Each installed kW generates 4 to 4.5 units a day on Saurashtra sunlight. Paschim Gujarat Vij Company Limited, PGVCL, handles Morbi net metering. Residential payback runs three and a half to five years.

Last reviewed 18 September 2026 · Heaven Green Energy engineering team

Price, size and savings

Find your bill. Read across.

Most Morbi solar pages hide the price behind a callback form or quote an all-India average that means nothing in Saurashtra. This table answers it outright. Find your monthly bill in the left column, then read across for size, generation, roof area and cost after subsidy.

Indicative Morbi market ranges, 2026
Your monthly bill System Generates Roof needed Cost after subsidy Payback
Up to ₹1,800 2 kW 1–2 BHK with one air conditioner used lightly 240–270units/month ~200 sq ft ₹65,000 – ₹95,000 ₹1.25 lakh–₹1.55 lakh before ₹60,000 subsidy 3.5–4.5 years
₹2,000–₹3,500 3 kW Best value The biggest system that still earns the whole ₹78,000 360–405units/month ~300 sq ft ₹1.02 lakh – ₹1.47 lakh ₹1.80 lakh–₹2.25 lakh before ₹78,000 subsidy 3.5–4.5 years
₹3,500–₹6,000 5 kW A 3 BHK running two ACs through a 41°C Morbi May 600–675units/month ~500 sq ft ₹2.07 lakh – ₹2.67 lakh ₹2.85 lakh–₹3.45 lakh before ₹78,000 subsidy 4–5 years
₹6,000–₹13,000 10 kW Bungalows on Ravapar Road, clinics, showrooms, trading offices 1,200–1,350units/month 700–1,000 sq ft ₹4.42 lakh – ₹5.52 lakh ₹5.20 lakh–₹6.30 lakh before ₹78,000 subsidy 4–5 years
Above ₹13,000 25 kW+ Commercial and industrial connections claiming depreciation 3,000–3,400units/month Site-specific ₹10.75 lakh – ₹13.50 lakh ₹10.75 lakh–₹13.50 lakh, no subsidy 3–4.5 years

These are indicative Morbi market ranges for 2026 covering Tier-1 modules, a branded inverter, a galvanised mounting structure, protection equipment and installation. They are not a Heaven Green quotation. Subsidy amounts are the central PM Surya Ghar figures published on pmsuryaghar.gov.in. Generation assumes a shadow-free, roughly south-facing roof.

Size against units, not rupees. Read the units consumed off your PGVCL bill rather than the amount payable, because units are what an array cancels and the amount moves with slab and fuel charges. The word shadow-free in that roof column is doing real work too. In the older lanes off Nagar Dwaraja and Lakhdhirwas, roofs sit close together. An overhead water tank clipping the array for two hours a day quietly removes a tenth of your annual yield.

The 3 kW cliff decides your economics. The subsidy pays ₹30,000 for each of the first two kilowatts and ₹18,000 for the third, then nothing above that. So it covers roughly a third of a 3 kW system and around an eighth of a 10 kW one. On a borderline bill, 3 kW returns more rupees per rupee spent.

A cheap Morbi quote is cheap in the steel, not the panel. This is a windy, dusty, ceramic-dust-laden town, and the parts that fail first are the ones nobody photographs. That means galvanising thickness, cable gauge, earthing pits, surge protection and the wind-load design of the structure. Ask every vendor for a written Bill of Materials listing make, model and quantity. Without that sheet you are comparing two numbers, not two systems.

Why there is no rupee saving in that table

You will notice the table shows no rupee saving. That is deliberate. The rupee value of a generated unit depends on the slab rate you personally pay, printed on your own PGVCL bill. That rate differs between a domestic connection in Shakti Plot and a shop on Sanala Road. Bring your last bill to the free survey and we will work the exact figure out with you, in front of you. We use your own slab rather than an average pulled off a spreadsheet. Prefer to work it out yourself first? Put your bill into our solar savings calculator. No phone number required.

This is what we actually build.

Heaven Green Energy installations across India. Not stock photography, and not renders. Your Morbi system is built to the same specification.

Rooftop solar array photographed against a city skyline at sunset
Residential rooftop
Long row of solar modules on a commercial building rooftop photographed at sunrise
Commercial rooftop
Elevated solar canopy structure mounted above a terrace, leaving the floor below usable
Elevated structure
Wall of dozens of string inverters mounted in neat rows at a large solar installation
Electricals

PM Surya Ghar Muft Bijli Yojana

₹78,000

Maximum central subsidy for a residential rooftop system.

  • ₹30,000 per kW for the first 2 kW
  • ₹18,000 for the 3rd kW
  • Nothing paid above 3 kW
  • Credited directly to your bank account
  • We file the entire claim for you
How the subsidy works

Five steps, and we run four of them.

There is no special Morbi subsidy and no special Gujarat top-up on the central scheme. PM Surya Ghar is a national scheme, so the money is identical in Morbi, Rajkot and Delhi. What changes city to city is which utility processes your file, and in Morbi that is PGVCL.

1

Register on the National Portal

You register at pmsuryaghar.gov.in using your PGVCL consumer number, mobile number, Aadhaar and address. We sit with you while you do it, because a consumer number that does not match PGVCL's own records is the single commonest reason a Morbi application stalls.

2

Apply for feasibility, then choose your vendor

PGVCL checks the application against your sanctioned load and confirms technical feasibility. You then pick an empanelled vendor from the portal list. Heaven Green Energy is empanelled, so we map straight onto your application without a workaround.

3

Install only after approval comes through

Installing before feasibility clears is how people lose the subsidy entirely. Once approval lands we supply Adani modules with traceable serial numbers, and hand you a Bill of Materials and the full warranty schedule on commissioning day.

4

Inspection and the bidirectional meter

A PGVCL officer inspects the installation and the sub-division fits the bidirectional meter, which generates the commissioning certificate on the portal. Our engineer attends the inspection so questions get answered on the roof, not over email.

5

Claim, then direct credit

We file the subsidy claim the moment the certificate issues. The government credits the money straight to your bank account. It never passes through us, so treat any Morbi vendor who offers to collect the subsidy on your behalf as a warning sign.

If you are a business, this section does not apply

PM Surya Ghar is for residential consumers only. A ceramic unit, a trading firm or a shop in Morbi cannot claim it. Those businesses claim accelerated depreciation on the asset instead, which for a profitable taxpayer is usually worth considerably more than the residential subsidy would have been.

PGVCL (Paschim Gujarat Vij)

Net metering: who you actually file with.

Net metering is where competing Morbi pages get it wrong, and naming the wrong licensee costs you every export credit you were counting on. Here is the correct version.

Morbi is supplied by Paschim Gujarat Vij Company Limited (PGVCL), the GUVNL subsidiary that distributes power across Saurashtra and Kutch from its corporate office in Rajkot. Morbi district is one of the twelve districts in its licence area, alongside Rajkot, Jamnagar, Surendranagar, Bhavnagar, Junagadh, Amreli, Botad, Porbandar, Devbhumi Dwarka, Gir Somnath and Kutch. It is a different company from Torrent Power, which distributes in Ahmedabad and Surat city, from MGVCL in central Gujarat and from DGVCL in the south. Any page that files your Morbi application with Torrent or DGVCL has sent you to the wrong counter.

The commercial terms are not set by PGVCL and certainly not by us. They come from the Gujarat Electricity Regulatory Commission (GERC), which publishes the solar rooftop and net-metering framework for every licensee in the state. Under that framework your system is capped against your sanctioned load, and every consumer category may apply. Units you export are credited against units you import rather than paid out as cash.

Practically, that means two numbers on your bill decide your system size: units consumed and sanctioned load in kilowatts. If you want an array larger than your sanctioned load allows, the load enhancement application goes in first. We check both before quoting rather than after.

1

Application to the sub-division

Consumer details, sanctioned load, system rating, single-line diagram and site layout go to your PGVCL sub-division office with the standard registration fee.

Filed by us
2

Technical feasibility

PGVCL checks transformer capacity and the local feeder against your proposed rating, then issues the feasibility approval that lets installation start legally.

PGVCL
3

Installation and testing

We install, earth and commission the array, then submit the test report and installation completion documents so the meter can be scheduled without a second round trip.

Filed by us
4

Inspection and meter change

Our engineer attends the PGVCL inspection. PGVCL replaces your meter with a bidirectional one and your export credits start appearing on the next billing cycle.

Us, then PGVCL
Solar panels installed flush on a corrugated metal factory roof with industrial buildings behind
Not a home?

Solar for Morbi's businesses.

Not a home? Morbi is an unusually industrial town for its size, and the arithmetic on a factory shed roof is different from the one on a bungalow slab.

Morbi is India's ceramic capital, with hundreds of tile, vitrified tile, sanitaryware and glaze units. They cluster along National Highway 8A and the roads out to Lalpar, Jambudiya, Rafaleshwar, Trajpar, Old Ghuntu Road, Lakhdhirpur Road and Dhuva. Wall clock and consumer durables manufacturing and paper mills sit alongside them. Those units have two things solar likes: very large connected loads and very large flat shed roofs already standing.

Commercial and industrial consumers cannot claim PM Surya Ghar. They do something better. A business claims accelerated depreciation on the solar asset, which for a profitable taxpayer usually beats the residential subsidy outright. It can be combined with a zero down payment structure so the monthly instalment sits below the bill the system removes.

  • Shed roofs need a structural and wind-load assessment before any rating is quoted.
  • Sizing is capped against sanctioned load, so load enhancement may come first.
  • Kiln-adjacent roofs need a soiling and cleaning plan written into the AMC.
Why us

Why Morbi customers choose Heaven Green Energy

We have been installing since 2017 and have crossed 10,000 installations across Gujarat. Longevity is not an argument on its own, so here is what it actually buys you in Morbi, stated plainly and without adjectives.

We file the PGVCL paperwork ourselvesApplication, feasibility, test report, inspection attendance and meter follow-up all sit with us. You are not learning a sub-division's document habits on your own time.
Adani modules, Qbits invertersWe are an authorised channel partner of Adani and manufacture Qbits inverters in-house. Serial numbers are traceable and warranty claims do not turn into a hunt for an absent importer.
A written Bill of Materials, every timeMake, model and quantity for every component, handed over on commissioning. It is the one document that makes two Morbi quotes genuinely comparable, and most vendors will not give it.
Free survey, no advance paymentAn engineer visits, measures the roof, checks shadows and reads your bill before any number is quoted. Nothing is payable to start the process.

Where we are based

Heaven Green Energy is headquartered at Mota Varachha, Surat. We serve Morbi and the wider Saurashtra region through our channel partner network and field engineering team. They run the surveys, supervise the installation and handle PGVCL coordination on the ground. There is no Heaven Green branch office, address or local phone line in Morbi, and we tell you that before you sign rather than after.

How we work

From first call to a spinning net meter.

Four stages run from your first call to your first export credit on a PGVCL bill. The timelines below are typical for Morbi, not promises.

01

Call and bill review

We read units, tariff category and sanctioned load off your PGVCL bill and give you an indicative size and cost band before anyone travels anywhere.

Same day
02

Free site survey

An engineer measures usable shadow-free roof, checks the slab or shed structure, plans cable routes and picks a shaded, ventilated inverter position.

1–3 days
03

Paperwork and approval

Portal registration, PGVCL application and feasibility approval. Duration depends on the sub-division's queue, so we keep you updated rather than quiet.

2–5 weeks
04

Install, inspect, commission

Structure, modules, inverter, earthing and protection go up, then the PGVCL inspection and bidirectional meter change. Generation starts the same week.

2–4 days on site

What Morbi weather does to a solar system

Morbi sits in a hot semi-arid belt with strong sun, a short violent monsoon and eight dry dusty months. That combination is excellent for generation and hard on hardware, and the design has to answer both honestly. Three things drive the engineering decisions here.

Dust, and then ceramic dust on top of it

Morbi is dry from October to May, with March humidity around 31%, so ordinary road and field dust settles on glass continuously. Add a tile cluster of several hundred kilns and spray dryers and the deposition near the industrial roads is heavier than a normal Gujarat town. Soiling is the largest avoidable loss here. We fix cleaning frequency by where your roof actually sits, not by a template.

41°C Mays and 44°C peaks

May averages a daily high around 41°C and Morbi has recorded 44°C. Module output falls as cell temperature rises, so the mounting matters: enough gap under the array for air to move, and no hot pocket trapped against a flat slab. An inverter baked in a west-facing sun trap also derates. We place it shaded and ventilated, which is a five-minute decision that pays for twenty-five years.

A short, heavy monsoon and open-country wind

Rain here is concentrated: roughly 440 to 600 mm a year, most of it between June and September with July the peak month at around 208 mm. Saurashtra also gets strong open-country wind across flat terrain. That argues for galvanised structures with proper anchoring, sealed and gasketed cable entries, and earthing that has been tested rather than assumed. Cheap structures fail in the first squall, not in year ten.

Service area

Areas of Morbi we install in.

We survey and install across Morbi city, the Sanala Road corridor and the ceramic belt on the highway out of town. If your area is not named below it is almost certainly still covered. Send your pin code and we will confirm it the same day.

Old city and the Machhu riverside Pin 363641

Old Morbi · Lakhdhirwas · Mani Mandir area · Nagar Dwaraja · Nani Bazar · Gandhi Chowk · Capital Market · Sardar Baug · Navlakhi Road · Kayaji Plot · Shakti Plot · Timbdi

Sanala Road corridor Pin 363641

Sanala · Sanala Road · Morbi Bypass Road · Savsar Plot · Lati Plot · Sardar Nagar · Gokul Nagar · Gayatri Nagar · Ranchod Nagar · Mahendra Para · Kanya Chhatralay Road · New Bus Stand area · Vavdi Road · Canal Road

Ravapar Road and the north side Pin 363641 / 363642

Ravapar Road · Ravapar · Ravapar (Nadi) · Jail Road · Shastrinagar · Madhuram Society · Sardar Patel Society · Amrut Nagar · Yogesh Nagar · Nani Vavdi · Pipaliya · Lakhdhirpur · Lakhdhirpur Road

Ceramic and industrial belt Pin 363642

Lalpar · Jambudiya · Rafaleshwar · Trajpar · Old Ghuntu Road · Dhuva · Makansar · Bhadiyad · Mahendranagar · Lilapar · Paneli · Jetpar Road · Halvad Road

Customers

Real customers, real cities.

These are real Heaven Green customers, shown with the city each system was actually installed in. We do not relabel a review to whichever page you happen to be reading, which is why you will see Bharuch, Surat and Rajkot here rather than Morbi.

★★★★★
250 kW industrial system on our chemical plant. Generation has been 8% above estimate every month. Their O&M team is responsive.
Sanjay Joshi
Industrial · Bharuch · 250 kW
★★★★★
150 kW at our textile factory dropped power costs by 68%. The ROI calculation they provided was spot-on, break-even under 4 years.
Mihir Shah
Commercial · Surat · 150 kW
★★★★★
Compared 5 vendors, Heaven Green's quote was the most transparent. No hidden fees. Adani panels installed on schedule, structure is solid.
Kiran Trivedi
Residential · Rajkot · 4 kW
Before you sign

Six things to check on any Morbi quote.

Including ours. Take this list to every vendor you speak to.

Questions

Solar in Morbi: every question answered.

17 questions Morbi buyers actually search for, including the ones competing pages leave out. Grouped so you can skip to what you need.

Cost & subsidy

What is the price of a solar panel system in Morbi in 2026?
A 3 kW rooftop system runs about ₹1.80 lakh to ₹2.25 lakh before subsidy in Morbi, and ₹1.02 lakh to ₹1.47 lakh after the ₹78,000 PM Surya Ghar subsidy. A 5 kW system runs ₹2.85 lakh to ₹3.45 lakh before subsidy. These are indicative market ranges, not a quotation.
How much Morbi solar subsidy can I actually get?
Up to ₹78,000. The scheme pays ₹30,000 for each of the first two kilowatts and ₹18,000 for the third, then nothing above 3 kW. It is a central scheme, so the amount is identical in Morbi, Rajkot and everywhere else in India. Residential consumers only.
Is there an extra Gujarat state subsidy on top of the central one?
No. Anyone advertising a larger Morbi or Gujarat figure is describing money that does not exist under PM Surya Ghar. The ₹78,000 cap is the whole central benefit. Businesses get nothing from this scheme and claim accelerated depreciation on the asset instead.
Can I get rooftop solar in Morbi with zero down payment?
Yes, through financing rather than a discount. The instalment is structured so it sits at or below the bill the system removes, which is how most commercial Morbi installations are funded. Residential financing is also available. Bring your bill and we will show the two cash flows side by side.

Net metering & DISCOM

Which electricity company handles net metering in Morbi?
Paschim Gujarat Vij Company Limited, PGVCL. It is the GUVNL distribution subsidiary for Saurashtra and Kutch, headquartered in Rajkot, and Morbi district is one of its twelve licence districts. Torrent Power, DGVCL and MGVCL do not distribute here, so your file goes to PGVCL.
How does PGVCL net metering work for a Morbi rooftop?
A bidirectional meter replaces your existing meter. Units you export are credited against units you import within the billing cycle, so you pay for net consumption. The commercial terms come from GERC, the state regulator, not from PGVCL and not from your installer.
How large a system will PGVCL approve on my connection?
Sizing is capped against your sanctioned load in kilowatts, which is printed on your bill. If you want a larger array than the load allows, a load enhancement application goes in first. We check sanctioned load before quoting, not after installation.
How long does PGVCL approval take in Morbi?
Typically two to five weeks from application to feasibility approval, then the inspection and meter change after installation. The variable is the sub-division's queue. We file it, chase it and tell you where it is stuck rather than leaving you to call.

Sizing & performance

How many units will a solar system generate in Morbi?
About 4 to 4.5 units per installed kW per day, on roughly 5.5 peak sun hours. A 3 kW system produces 360 to 405 units a month and a 5 kW system 600 to 675 units. Saurashtra sits near the top of the Indian generation range.
What size system do I need for my Morbi electricity bill?
Roughly: 2 kW up to ₹1,800 a month, 3 kW for ₹2,000 to ₹3,500, 5 kW for ₹3,500 to ₹6,000, 10 kW for ₹6,000 to ₹13,000. Above ₹13,000 you are into 25 kW and commercial territory. Size against units, not rupees.
How much roof area does a rooftop solar system need?
About 200 sq ft for 2 kW, 300 sq ft for 3 kW, 500 sq ft for 5 kW and 700 to 1,000 sq ft for 10 kW. The area must be shadow-free. A water tank or a neighbour's parapet clipping the array cuts more yield than people expect.
Does ceramic dust in Morbi reduce solar generation?
Yes, soiling is the biggest avoidable loss here. Morbi is dry from October to May and the tile cluster adds industrial deposition on top of ordinary dust. Cleaning frequency should be set by where your roof sits relative to the kilns, and written into the maintenance plan.

Installation & service

How long does installation take in Morbi?
Two to four days on site for a residential system once approval is through. The full timeline from first call to generation is usually four to eight weeks, and almost all of that is PGVCL paperwork rather than work on your roof.
What happens if a panel or inverter fails after installation?
Modules are Adani Solar, supplied through our authorised distribution, and inverters are Qbits, manufactured in-house. Serial numbers are recorded on your Bill of Materials, so a warranty claim is traceable rather than a search for a vanished importer. Our field team handles it.
Will the structure survive Morbi wind and the monsoon?
It should, if it is designed for it. Ask for galvanised structure with specified coating thickness, proper anchoring for open-country wind, sealed cable entries and tested earthing. Rainfall here is concentrated into June to September, so the first squall is the real test.

About Heaven Green

Does Heaven Green Energy have an office in Morbi?
No. There is one office, at Mota Varachha in Surat. Morbi is served through our channel partner network and field engineering team, who run the surveys, supervise installation and coordinate with PGVCL. We say this upfront because several competitors imply local branches they do not have.
Why choose Heaven Green Energy over a local Morbi installer?
Installing since 2017, past 10,000 installations, authorised Adani Solar distributor, in-house Qbits inverters, and a written Bill of Materials on every job. We file the PGVCL and PM Surya Ghar paperwork ourselves. Compare that list against any local quote before deciding.
Nearby

We also install around Morbi.

Every city we cover is listed in the solar by location directory.

Free Morbi site survey No advance payment, no obligation Get my quote
Call WhatsApp