Solar panel installation in Kalol.

Kalol homes, GIDC units and farmhouses get rooftop solar from Heaven Green Energy sized on their own UGVCL units, not on a sales template. We survey the roof, fit Adani panels with a Qbits inverter, lodge the net-metering file with UGVCL's Kalol Division and run the PM Surya Ghar claim for residential connections.

UGVCL Kalol Division filing done for youUp to ₹78,000 PM Surya Ghar for homesAdani channel partner, Qbits invertersIn business since 2017, 10,000+ systems

Ask for a Kalol solar proposal

Attach your latest UGVCL bill and say whether the roof is a society terrace, a GIDC shed or a farmhouse slab. You get a size, a generation forecast and the subsidy sum in writing, at no charge.

Free site survey. No advance payment.

Prefer to talk? +91 63904 05060

Who supplies power
UGVCL (Uttar Gujarat Vij Company Limited)
Kalol sits in UGVCL's Kalol Division, part of its Sabarmati Circle. Torrent Power's Gandhinagar licence stops at the capital and does not include Kalol.
Rule-maker
Gujarat Electricity Regulatory Commission (GERC)
GERC's rooftop regulations decide capacity limits, metering and how surplus units are settled on a Kalol bill.
Sunshine
About 5.5 peak sun hours
Gandhinagar district's dry climate puts Kalol in the strongest Indian solar band.
Output per kW
4 to 4.5 units a day
Annual mean for a clean, shade-free array. Dust and May heat pull real days below it.
Home subsidy
Up to ₹78,000
Central PM Surya Ghar money for residential connections. GIDC, shop and pump connections are excluded.
Payback
4–5 years for 5 kW at home
Smaller 2 kW and 3 kW homes recover cost in 3.5–4.5 years.

The short answer

In Kalol, Gandhinagar, a 3 kW rooftop system costs an indicative ₹1.80 lakh to ₹2.25 lakh before subsidy and a 5 kW system ₹2.85 lakh to ₹3.45 lakh. Residential owners recover up to ₹78,000 through PM Surya Ghar after commissioning. Expect 4 to 4.5 units per kW per day. UGVCL, through its Kalol Division, fits the net meter, and a 5 kW home system pays for itself in 4–5 years.

Last reviewed 2 October 2026 · Heaven Green Energy engineering team

Price, size and savings

Find your bill. Read across.

Your bill picks the size. Find the row that matches what you normally pay UGVCL each month. Then read across for the system it suits, the indicative installed price before subsidy, Kalol's expected monthly units, the shade-free roof needed and the likely payback.

Indicative Kalol (Gandhinagar) market ranges, 2026
Your monthly bill System Generates Roof needed Cost after subsidy Payback
Up to ₹1,800 2 kW A flat or row house in the old Desaivada lanes with fans, a fridge and a cooler 240–270units/month ~200 sq ft ₹65,000 – ₹95,000 ₹1.25 lakh–₹1.55 lakh before ₹60,000 subsidy 3.5–4.5 years
₹2,000–₹3,500 3 kW Best value A Panchvati or Kalol West society bungalow claiming the full home subsidy 360–405units/month ~300 sq ft ₹1.02 lakh – ₹1.47 lakh ₹1.80 lakh–₹2.25 lakh before ₹78,000 subsidy 3.5–4.5 years
₹3,500–₹6,000 5 kW A two-storey house off Gandhi Road running two air conditioners in summer 600–675units/month ~500 sq ft ₹2.07 lakh – ₹2.67 lakh ₹2.85 lakh–₹3.45 lakh before ₹78,000 subsidy 4–5 years
₹6,000–₹13,000 10 kW A large family home in Santej or Saij, or a farmhouse with its own house connection 1,200–1,350units/month 700–1,000 sq ft ₹4.42 lakh – ₹5.52 lakh ₹5.20 lakh–₹6.30 lakh before ₹78,000 subsidy 4–5 years
Above ₹13,000 25 kW+ A daytime workshop or chemical unit in Kalol GIDC or Chhatral GIDC 3,000–3,400units/month Site-specific ₹10.75 lakh – ₹13.50 lakh ₹10.75 lakh–₹13.50 lakh, no subsidy 3–4.5 years

These are indicative market ranges for Kalol in 2026, not a Heaven Green Energy quotation. The final price moves with roof type (society RCC terrace, GIDC sheet roof or farmhouse slab), structure height, cable run, chosen hardware and any civil work. Subsidy figures follow the central PM Surya Ghar slabs published at pmsuryaghar.gov.in and apply only to residential connections. Rooftop solar systems attract 5% GST on the equipment since 22 Sep 2025. A supply-and-install contract taxes 30% of the value as installation service at 18%, so the blended rate on a typical quote is about 8.9%.

The subsidy stops growing at three kilowatts. PM Surya Ghar gives ₹30,000 per kW on the first two and ₹18,000 on the third, a ceiling of ₹78,000. A fourth or fifth kilowatt is worth buying only if your own units justify it, never to chase a bigger cheque.

Price gaps between Kalol quotes mostly come from the frame, not the panels. Ask each seller for the steel section, the galvanising thickness and how the legs are fixed to your slab. A frame that skimps on any of these looks fine at handover and starts to rust or loosen after a few summers of dust and pre-monsoon squalls.

GIDC sheds are priced differently again. A sheet roof in Kalol GIDC or Chhatral GIDC usually takes rails clamped to the purlins rather than a raised frame, which cuts steel. Old or corroded sheets have to be replaced first, though. We inspect the sheets and purlins before quoting, so a re-roofing cost does not appear halfway through the job.

Why there is no rupee saving in that table

No honest installer can print one rupee saving for every Kalol home. Your saving depends on your UGVCL tariff category, the fixed charge for your sanctioned load and how much of your use falls in daylight. A household that commutes to Ahmedabad or Gandhinagar and uses most power after 7 pm exports more by day and banks it under net metering. A family at home all day uses the solar directly. Bring twelve months of bills and we work it out from your actual units. Prefer to work it out yourself first? Put your bill into our solar savings calculator. No phone number required.

This is what we actually build.

Heaven Green Energy installations across India. Not stock photography, and not renders. Your Kalol (Gandhinagar) system is built to the same specification.

Rooftop solar array photographed against a city skyline at sunset
Residential rooftop
Long row of solar modules on a commercial building rooftop photographed at sunrise
Commercial rooftop
Elevated solar canopy structure mounted above a terrace, leaving the floor below usable
Elevated structure
Wall of dozens of string inverters mounted in neat rows at a large solar installation
Electricals

PM Surya Ghar Muft Bijli Yojana

₹78,000

Maximum central subsidy for a residential rooftop system.

  • ₹30,000 per kW for the first 2 kW
  • ₹18,000 for the 3rd kW
  • Nothing paid above 3 kW
  • Credited directly to your bank account
  • We file the entire claim for you
How the subsidy works

Five steps, and we run four of them.

Kalol households can recover up to ₹78,000 from PM Surya Ghar. You pay the installer in full, and the central government credits the subsidy to your bank after UGVCL commissions the net meter.

1

Register on the national portal

Open pmsuryaghar.gov.in, pick Gujarat and UGVCL, and enter the consumer number from your bill. The name and address must match UGVCL's record, so a house still billed in a late parent's name needs a name transfer first.

2

Get UGVCL feasibility

Enter the capacity you want. UGVCL checks it against your sanctioned load and the transformer feeding your society or village, and replies on the portal, usually inside a fortnight.

3

Select an empanelled vendor

Only work by a vendor registered on the portal qualifies. We upload the module and inverter details, installation photos and test results against your application.

4

Net meter and inspection

UGVCL fits and seals the bidirectional meter and the system passes electrical inspection. The portal then issues the commissioning certificate, which is the trigger for payment.

5

Bank details and credit

Upload a cancelled cheque or passbook page for an account in the consumer's name. In Gujarat, claims we file usually reach the bank 30 to 45 days after commissioning.

If you are a business, this section does not apply

The subsidy covers residential connections only. Factory units in Kalol GIDC, Chhatral GIDC or Khatraj, along with shops, clinics and agricultural pump connections, cannot claim it. Businesses usually look at accelerated depreciation instead, and farmers at PM-KUSUM for pumps. Have your chartered accountant confirm the tax position before you commit.

UGVCL (Uttar Gujarat Vij)

Net metering: who you actually file with.

Net metering is what makes a home system pay. Units your roof sends to the grid at midday are set off against the units you draw in the evening, so surplus is not wasted.

UGVCL supplies Kalol. Its Kalol Division handles the town and taluka and reports to the Sabarmati Circle. UGVCL's own tender notices for this division name sub-divisions for Kalol Town, Kalol-1, Kalol-2, Santej and Chhatral. Your bill prints the sub-division that holds your connection, and that is where the net-metering file goes.

Buyers here often ask whether they are under Torrent Power, because Gandhinagar and Ahmedabad are so close. Torrent holds the licences for Ahmedabad city and Gandhinagar city, and Kalol is outside both. Santej and Khatraj, the parts of the taluka nearest Ahmedabad, are still UGVCL. One more trap: Gujarat has a second Kalol, in Panchmahal district, which falls under MGVCL. A quote for Kalol, Gandhinagar that mentions MGVCL, DGVCL, PGVCL or Torrent was written for the wrong town.

The GERC framework applies throughout. Rooftop capacity is capped at your sanctioned load, homes, shops, industries and farm connections may all apply, and imports and exports are netted in each billing cycle. Surplus credit left over is settled under whichever GERC order was in force when your system was commissioned.

1

Application lodged

We file with your consumer number, sanctioned load and the planned capacity, addressed to the Kalol Division sub-division on your bill. That may be Kalol Town, Kalol-1, Kalol-2, Santej or Chhatral.

Heaven Green
2

Installation papers

Once fitted, we submit the test report with module and inverter serial numbers, earthing resistance readings and the single-line diagram. Missing pages here are the usual reason meter dates slip.

Heaven Green
3

Meter fitting and inspection

UGVCL staff fix and seal the bidirectional meter, and the electrical inspector visits separately. Our engineer attends both visits to answer protection and earthing questions on site.

UGVCL
4

Agreement and first net bill

We sign off the net-metering agreement with UGVCL. Your next bill shows import, export and net units side by side. Send it to us if a figure looks wrong.

Heaven Green, then UGVCL
Solar panels installed flush on a corrugated metal factory roof with industrial buildings behind
Not a home?

Solar for Kalol (Gandhinagar)'s businesses.

Kalol earns its living from industry. Two GIDC estates, a fertiliser complex and a belt of chemical, pigment and metal units run mostly on day shifts, which is when a rooftop array produces.

GIDC runs two estates in the taluka. The first is Kalol (listed by GIDC as Kalol N.G., North Gujarat, to separate it from Kalol in Panchmahal) on the town's east side. The larger Chhatral estate sits up the Mehsana highway, built out in several phases. Chhatral's units lean towards chemicals, pigments, pharma intermediates, stainless and tube makers, and engineering shops. Khatraj has its own industrial estate post office near Santej, and IFFCO's Kalol fertiliser complex, its first ammonia-urea plant from 1974, stands at Saij. Kalol East grew up around the Sintex plastics works.

For these units the economics turn on daytime use. A reactor, dryer, compressor or CNC line that runs from 9 to 6 absorbs most of what the roof makes, so very little is exported. A two-shift unit that idles on Sundays should be sized from a full year of bills, because Sunday generation is exported and settled at the GERC rate rather than used.

Chemical and pigment plants need extra care with roofs. Acidic or alkaline fumes speed up corrosion of steel structures and sheet fixings. Where the process calls for it, we specify heavier galvanising and stainless fasteners, and we keep inverters in a ventilated electrical room, away from process vents.

Industrial and commercial connections are outside PM Surya Ghar. Read accelerated depreciation on solar for the tax treatment and zero down payment solar if you would rather not tie up working capital.

  • Kalol GIDC (Kalol Industrial Estate, 382725)
  • Chhatral GIDC, phases along the Kalol–Mehsana highway (382729)
  • Khatraj industrial estate and the Santej side
  • Shops, hospitals, schools and showrooms along Gandhi Road and in Kalol town

Agriculture still covers most of the taluka outside these pockets. Gujarat's Jyotigram scheme put farm pumps on separate agricultural feeders, apart from village household supply, and PM Surya Ghar does not pay for pump connections. For a solar pump, see our PM-KUSUM page and the GEDA guide to KUSUM in Gujarat. If your farmhouse in Dingucha, Soja or Nardipur has a separate residential meter, that house can still claim PM Surya Ghar.

Why us

Reasons Kalol owners choose Heaven Green Energy

Since 2017 we have completed more than 10,000 installations in Gujarat. For you that means UGVCL procedures we file every week, reliable supply of Adani modules and an installer still around when a warranty question comes up.

Filed to the correct sub-divisionThe Kalol Division has several sub-divisions, and Santej or Chhatral connections are not handled by the town office. We send your file to the one on your bill, which avoids weeks of bounced paperwork.
One panel brand, our own inverterWe are an authorised channel partner of Adani for modules and fit only Adani panels. Inverters are Qbits, the group's own brand, so one company answers for the main hardware.
Industrial roofs understoodChemical fumes, ageing GIDC sheets and fragile purlins all change the design. We check them before quoting and tell you plainly if the roof needs work before panels go on.
The quote you sign holdsShade, roof strength and cable lengths are measured at survey, so the written price already includes them. Nothing is added once the team is on your roof.

Where we are based

Heaven Green Energy is headquartered at Mota Varachha, Surat, and that is our only office. We have no shop, branch or local phone number in Kalol. We serve Kalol and the wider North Gujarat region through our channel partner network and field engineering team. They carry out surveys, supervise installation and handle UGVCL coordination on the ground. We state this before you sign rather than after.

How we work

From first call to a spinning net meter.

From the first call to a UGVCL bill that shows exported units, a Kalol project moves through four stages.

01

Bill reading

WhatsApp or email two recent UGVCL bills. We look at units consumed and sanctioned load, then give an approximate size and price range before anyone visits.

Same day
02

Roof survey and proposal

An engineer visits your Kalol property, maps shade from water tanks and neighbouring floors, checks the slab or sheets and plans the cable route. The written proposal gives generation, structure details and the subsidy calculation.

2–4 days
03

Fitting and testing

The team erects the frame, mounts panels, installs the inverter, earthing, surge protection and monitoring, and tests the whole system. Every step is photographed for the portal and the inspector.

2–4 days on site
04

Meter, inspection, subsidy

UGVCL fits the net meter, the inspector clears the system, the portal issues the commissioning certificate and, for a home, the subsidy is credited.

3–7 weeks

What Kalol's climate does to a solar roof

Kalol is hot and dry for most of the year, with a short monsoon from mid-June to mid-September of roughly 800 mm in long-run averages. Strong sun lifts output; heat, dust and early-summer storms are what wear the hardware.

Dust from highway, estates and fields

Traffic on the Kalol–Mehsana highway, open plots in the GIDC estates and dry fields after harvest all leave a fine film on glass. It costs units before it is visible. In the dry months, wash every two to three weeks, and more often if the roof faces a busy road or a dusty yard.

Hot roofs from March to June

Summer afternoons in Kalol regularly pass 40°C, and dark terrace slabs run hotter still. Hot modules lose efficiency, so we raise them on a frame with a clear air gap underneath. We put the inverter in shade or indoors, never on a sun-baked west wall.

Squalls before the rain

Rain cloud costs little output over a full year here because the monsoon is short. The bigger risk is wind: dust storms and thunder squalls in late May and June. We anchor frames into the RCC slab with chemical or expansion anchors, and clamp rails to purlins on GIDC sheds.

Service area

Areas of Kalol (Gandhinagar) we install in.

We take projects across Kalol town, its GIDC estates and the villages of Kalol taluka. Each name below is checked against India Post's record for Kalol, Gandhinagar district. If your area is not listed, send the pin code and we will confirm.

Kalol town Pin 382721

Kalol East · Kalol Centre · Kalol West · New Panchvati · Gandhi Road · Desaivada · Kalol Society Area · Ambika Society · Mubarakpura

GIDC estates and the Santej side Pin 382725, 382729, 382721

Kalol GIDC (Kalol Industrial Estate) · Chhatral · Chhatral GIDC · Khatraj Industrial Estate · Santej · Saij · Vadsar · Jaspur

Villages around the town Pin 382721

Aluva · Balva · Moti Bhoyan · Borisana · Hajipur · Isand · Jethlaj · Limbodra · Palsana · Piyaj · Ramnagar · Serisa

Nardipur, Soja and Dingucha villages Pin 382735, 382740

Nardipur · Soja · Amja · Golthara · Jamla · Khoraj · Kotha · Veda · Dingucha · Dhamasana · Mokhasan · Pansar

Customers

Real customers, real cities.

These reviews come from real Heaven Green Energy customers and show the town where each system was fitted. None is from Kalol, and we will not relabel a review to make it look local.

★★★★★
Zero advance, just like they promised. EMI through their finance partner, installation done before the first payment was due. Bills practically gone.
Dharmesh Vyas
Residential · Mehsana · 5 kW
★★★★★
Our showroom AC bills used to be ₹38k/month. After 25 kW solar, it's ₹3,500. 25-year warranty paperwork was registered same day. Smooth experience.
Vipul Modi
Commercial · Ahmedabad · 25 kW
★★★★★
250 kW industrial system on our chemical plant. Generation has been 8% above estimate every month. Their O&M team is responsive.
Sanjay Joshi
Industrial · Bharuch · 250 kW
Before you sign

Six things to check on any Kalol (Gandhinagar) quote.

Including ours. Take this list to every vendor you speak to.

Questions

Solar in Kalol (Gandhinagar): every question answered.

17 questions Kalol (Gandhinagar) buyers actually search for, including the ones competing pages leave out. Grouped so you can skip to what you need.

Cost & subsidy

What is the solar panel price in Kalol in 2026?
Indicative installed ranges before subsidy run from ₹1.25 lakh to ₹1.55 lakh for 2 kW and ₹1.80 lakh to ₹2.25 lakh for 3 kW. A 5 kW system runs ₹2.85 lakh to ₹3.45 lakh, and 10 kW runs ₹5.20 lakh to ₹6.30 lakh. Your roof, frame height and cable run set the final figure.
How much Kalol solar subsidy can my home get?
Up to ₹78,000. PM Surya Ghar pays ₹30,000 per kW for the first two kilowatts and ₹18,000 for the third, and nothing beyond. The scheme is central, so a Kalol house gets the same as a house anywhere else in India.
Can my unit in Chhatral GIDC claim PM Surya Ghar?
No. The subsidy is for residential connections only, so factories in Chhatral GIDC, Kalol GIDC or Khatraj cannot claim it. Most profitable units use accelerated depreciation instead, which can be worth more than the home subsidy. Ask your chartered accountant to run the numbers.
I have a farmhouse near Dingucha. What applies to me?
If the farmhouse has its own residential UGVCL connection, that house qualifies for PM Surya Ghar like any home. The pump on an agricultural connection does not. For the pump, PM-KUSUM is the route, explained on our PM-KUSUM page and GEDA guide.

Net metering & DISCOM

Which DISCOM handles net metering in Kalol?
UGVCL, Uttar Gujarat Vij Company Limited. Kalol falls under its Kalol Division in the Sabarmati Circle, and UGVCL tender notices list Kalol Town, Kalol-1, Kalol-2, Santej and Chhatral sub-divisions within it. Your bill shows which one has your connection.
Kalol is next to Gandhinagar. Am I a Torrent Power customer?
No. Torrent Power's licence covers Gandhinagar city, the planned capital, and Ahmedabad city. Kalol town and its taluka, including Santej and Khatraj, are UGVCL areas. If your bill carries the UGVCL logo, that is the company that will fit your net meter.
How long does UGVCL net metering take in Kalol?
Allow three to seven weeks after installation for a sealed bidirectional meter. That covers the test report, UGVCL's meter visit and the electrical inspector's clearance. A complete file sent to the right sub-division of the Kalol Division keeps you near the short end.
Is UGVCL net metering in Kalol different from the Kalol in Panchmahal?
Yes, they are different companies. Kalol in Panchmahal district is served by MGVCL, and Kalol in Gandhinagar district by UGVCL. Both follow GERC rules, but the offices, portals and paperwork are separate, so the application must name the right one.

Sizing & performance

How much will a 5 kW system generate on a Kalol roof?
About 600 to 675 units a month. Kalol gets around 5.5 peak sun hours, which gives 4 to 4.5 units per kW per day on a yearly average. Clear spring months run above that, and a dusty, unwashed array runs below it.
My bill is about ₹4,500 a month. What size do I need?
A bill in the ₹3,500 to ₹6,000 band usually points to 5 kW, which needs roughly 500 sq ft of shade-free roof. We still size on units, because fixed charges and slab tariffs make the rupee total a rough guide on a UGVCL bill.
Will fumes from Chhatral's chemical units damage my panels?
Glass and aluminium frames tolerate it, but steel structures and fasteners corrode faster near chemical and pigment processes. On those roofs we specify heavier galvanising and stainless fasteners, and keep the inverter away from process vents. Washing also removes deposits before they build up.
My Kalol society has a shared terrace. Can each flat get solar?
Usually not one array per flat, because terraces in Kalol apartment blocks are small and shaded by water tanks and stair heads. The society can install a system on the common connection for lifts, pumps and lighting. Owners of independent houses and row houses have their own roofs and decide alone.

Installation & service

How long does installation take in Kalol?
Two to four days on site for a typical house, covering the frame, panels, inverter, earthing, surge protection and monitoring. GIDC sheds take longer depending on size. UGVCL's meter visit and inspection then follow over three to seven weeks.
How often should I clean panels in Kalol?
Every two to three weeks from October to early June, sooner if the roof faces the highway or an industrial yard. Monsoon showers wash panels for you, so cleaning can be spaced out between July and September. Use plain water and a soft brush, never detergent.
What happens if output drops after installation?
The monitoring app shows a fall in daily units, and you or our team can spot it quickly. Scheduled service visits cover cleaning checks, fixings and electrical tests. Panels are Adani and inverters are our own Qbits, so warranty claims come back to us.

About Heaven Green

Does Heaven Green have an office in Kalol?
No. We have one office, at Mota Varachha in Surat. Kalol jobs are handled by our channel partner network and field engineering team, who survey, supervise installation and deal with UGVCL. We say this up front so you can decide with the facts.
Why pick Heaven Green as your solar company in Kalol?
We have installed since 2017 and completed more than 10,000 systems across Gujarat, from society terraces to industrial sheds and farm connections. That experience shows in UGVCL files that move without you chasing them and in prices that do not change after you sign.
Nearby

We also install around Kalol (Gandhinagar).

Every city we cover is listed in the solar by location directory.

Free Kalol (Gandhinagar) site survey No advance payment, no obligation Get my quote
Call WhatsApp