Terrace solar for apartment schemes in Ahmedabad.

An Ahmedabad apartment scheme pays one common bill for lifts, borewell and transfer pumps, parking lights and the clubhouse. A terrace plant on the society's own connection brings those units down. We read that bill, survey the roof, give the managing committee a written proposal, and file with Torrent Power or UGVCL.

Torrent Power or UGVCL checked from your billPlant sized on twelve months of common unitsProposal written for the managing committeeSurvey free, nothing to pay up front

Book a terrace survey for your scheme

Share the common-area bill, tower count and floors. We call the secretary or chairman and fix a survey slot that committee members can attend in person.

Free load study and site survey. No obligation.

Prefer to talk? +91 63904 05060

Who bills the society
Torrent Power or UGVCL
The licensee's name is printed at the top of the bill
Regulator
GERC
One net-metering framework covers both licensees
Generation
4 to 4.5 units per kW daily
Yearly average on an unshaded terrace
50 kW plant output
About 73,000 to 82,000 units a year
Worked out from the daily band
25 kW market band
₹10.75 lakh to ₹13.50 lakh
Bigger plants are priced after a load study
Central support
₹18,000 per kW
Common facilities, MNRE guidelines of June 2024

The short answer

Yes, an Ahmedabad housing society can put solar on its terrace and connect it to the common meter that feeds lifts, pumps and lighting. Each kW yields 4 to 4.5 units a day here. Torrent Power bills most societies inside the city; UGVCL bills some western and eastern fringe areas. For the common facilities, MNRE's PM Surya Ghar operational guidelines (June 2024) set central support for RWAs and group housing societies at ₹18,000 per kW. That support is capped at 3 kW per house and 500 kW.

Last reviewed 2 October 2026 · Heaven Green Energy engineering team

Apartment schemes and societies

Where an Ahmedabad scheme's common units go

The units that matter sit on the society's connection, not in the flats. That common bill funds the building's shared machinery through maintenance, and it is the bill a terrace plant is designed to shrink.

Ahmedabad's apartment stock comes in two broad shapes. Older parts of the city, such as Paldi, Naranpura and Maninagar, have low walk-up blocks with a staircase light, a pump and little else on the common meter. The newer schemes are different. Along SG Highway and in Thaltej, Bodakdev, Gota and Chandkheda, and out towards Bopal and Shela, developers have built multi-tower complexes with lifts, basements, clubhouses and pools.

Those schemes run a heavy common bill, and much of it is daytime load. Lifts work through the day, transfer pumps fill overhead tanks, and the clubhouse and gym open in working hours. That suits solar well, because units used on site while the plant generates never touch the export account at all.

There is a constraint that tall schemes share. A tower roof is crowded with lift machine rooms, overhead tanks, telecom equipment and fire-water pipework, and neighbouring towers cast shade at certain hours. The usable area is usually much smaller than the slab. We map it with a shadow study before quoting a size, because a plant drawn on the full roof outline is a plant the terrace cannot hold.

Lifts in multi-tower schemes

A complex with four or six towers may run eight or more lifts, often the largest line on its common bill. Lift demand peaks around school and office hours, much of it while the sun is up. The plant offsets their monthly units through the meter rather than powering any one lift directly.

Borewell, sump and booster pumps

Many schemes pump from a borewell or a municipal sump into overhead tanks, and boosters hold pressure on the top floors. A committee that sets filling for late morning on a timer moves that load into generating hours, so more solar is consumed on site and less is banked.

Parking, podium and compound lighting

Basement parking in newer towers often needs lighting and exhaust fans for much of the day, while podium, gate and compound lights run all night. The night share is carried by credits from midday export. Converting old fittings to LED first shrinks the plant the committee has to fund.

Clubhouse, pool and EV charging

Clubhouse air conditioning, pool filtration pumps and the gym sit on the common connection in most new schemes. EV chargers in the basement are the newest addition. Tell us what the committee expects to add, because sizing for that load now costs less than a second plant later.

How the numbers work

Counting the plant in units, not rupees

Measure a society plant by the units it takes off the common bill. What each unit is worth depends on the tariff category printed on your own bill, so the treasurer does that sum with us, bill in hand.

Start from the units. In Ahmedabad a 50 kW plant gives about 200 to 225 units a day, which is roughly 73,000 to 82,000 units over a year. A 25 kW plant gives about 36,500 to 41,000 units. Lay those figures next to twelve months of common-area bills and you see what share of the shared load the terrace can carry. Monsoon months generate less, and the banked credits from the dry months cover part of that gap.

The connection sets the ceiling. Torrent Power or UGVCL checks the plant against the sanctioned load on the society's common connection and the capacity of the local transformer. A scheme that has added lifts, a pool or EV points since possession may be running above its original sanction. If so, a load revision comes first, and we flag it at the survey rather than after the application is returned.

Tax works differently for a society. A business claims 40% accelerated depreciation on solar power generating systems under Appendix I of the Income Tax Rules. A cooperative housing society, however, rarely has business income to set it against. Ask your auditor before counting on it. GST has been 5% on solar equipment since 22 Sep 2025, with 18% on the 30% service share of a supply-and-install contract, about 8.9% blended. A 25 kW plant falls in the ₹10.75 lakh to ₹13.50 lakh market band, roughly ₹43,000 to ₹54,000 per kW at that size. Larger plants are priced after a load study.

Central support scales with the houses. Under MNRE's PM Surya Ghar operational guidelines (June 2024), a scheme's resident body claims ₹18,000 per kW on capacity serving its common facilities. That body may be an AOA or a cooperative housing society. The supported capacity is limited to 3 kW per house and 500 kW overall, so in a scheme of more than 166 houses the 500 kW ceiling binds first. Rooftop plants that members have already put up for their own flats are counted inside that limit. Non-DCR modules anywhere in the plant forfeit the support.

Generation from verified Gujarat constants (4 to 4.5 units per kW per day)
Plant sizeUnits a year
25 kW36,500 – 41,063
50 kW73,000 – 82,125
100 kW1,46,000 – 1,64,250
250 kW3,65,000 – 4,10,625
500 kW7,30,000 – 8,21,250

Indicative installed cost at 25 kW: ₹10.75–13.50 lakh (market range, not a quotation). Larger plants are priced after a load study of your bills and roof.

This is what we actually build.

Heaven Green Energy installations across India. Not stock photography, and not renders.

Solar panels installed flush on a corrugated metal factory roof
Factory roof
Long row of solar modules on a commercial rooftop at sunrise
Commercial rooftop
Elevated solar canopy structure above a terrace
Elevated structure
Wall of string inverters at a large solar installation
Electricals
Roof, structure and electricals

Engineering a plant on a tower roof

Three checks decide whether a scheme's terrace can carry a plant safely. They are how much shade-free area is left, what the slab and parapet can bear, and how the common connection is wired.

Usable area after the clutter

We draw every lift room, tank, telecom mast, solar water heater and pipe run on the roof plan, then model shade from neighbouring towers through the day. In multi-tower schemes the adjacent block is often the biggest shading source in winter mornings. Only the area left after that exercise counts towards the plant size.

Structure, wind and access

A tower roof sees stronger gusts than a bungalow terrace, so the mounting is designed for wind load at that height and anchored without breaking the waterproofing. We keep walkways for tank cleaning and fire access, and plan lifting of modules and steel so lifts and stair cores are not damaged in the process.

Wiring to the common meter

Cable runs from roof to the meter room can be long in a tall building, so we size conductors to hold voltage drop down. Where a scheme has several common connections, we confirm which one carries the most daytime load before connecting. Earthing, surge protection and an isolator the licensee can inspect come as standard.

Torrent Power or UGVCL, by address

Approvals: who does what.

Two approvals sit behind every society plant: the committee's decision inside the scheme and the licensee's approval outside it. We prepare the papers for both and attend the inspection.

1

Committee resolution

We give the managing committee a written proposal with roof layout, unit estimate and bill of materials, so it can be tabled at a meeting. The society passes its resolution and authorises a signatory under its own bye-laws.

Us
2

Licensee application

We file on the society's common consumer number with the licensee named on its bill, attaching the single-line diagram, equipment datasheets and the authorisation. The licensee then reviews sanctioned load and transformer capacity for feasibility.

Us, then Torrent Power or UGVCL
3

Installation

Once feasibility clears, we install. Work is scheduled around residents: noisy drilling in daytime hours, lifts protected during material movement, and the terrace kept accessible for tank and fire checks throughout the job.

Us
4

Inspection and net meter

The licensee inspects earthing, protection and the isolator, then replaces the common meter with a bidirectional one. Export credits run from commissioning. Our engineer is on the roof when the inspector is.

Torrent Power or UGVCL
Paying for it

Three ways to fund the plant.

A society pays from its corpus, from a special levy on members, or through a loan. Which suits you depends on the corpus balance and how the members vote.

Pay from the sinking or repair fund

Schemes with a healthy corpus can fund the plant outright, and the lower common bill then eases future maintenance demands. Check the bye-laws first, because some restrict what the repair fund may pay for. The committee usually needs a general body resolution before spending from it.

One-time levy on flat owners

Where the corpus is thin, the cost is split across flats, often by carpet area as maintenance already is. A clear unit estimate and a written bill of materials are what persuade a general body. We attend the meeting if the committee asks, and answer members' questions on the roof.

Loan to the society

Some banks and finance companies lend to registered societies for solar, repaid from the maintenance account. Terms vary by lender and by the society's records. We can introduce finance partners, but the committee should compare their terms with its own bank before choosing.

From enquiry to export

How the project runs.

Five stages take a scheme from its first enquiry to an exporting net meter, with the licensee's own steps shown.

Where we work from

Heaven Green Energy's only office is at Mota Varachha, Surat. We do not have an Ahmedabad branch. Our channel partner network and field engineering team serve societies in Ahmedabad. They carry out terrace surveys, supervise installation and deal with Torrent Power or UGVCL on the ground. We tell committees this before they sign.

01

Bill and roof check · Day 1–3

We read twelve months of common-area bills, note the licensee and sanctioned load, then walk every tower roof with a committee member present and log tanks, lift rooms and shade.

02

Committee proposal · Day 4–7

A written proposal follows: plant size, roof layout, unit estimate, bill of materials and price. It is set out so the committee can table it at its next meeting.

03

Resolution and filing · Set by the society

Once the society passes its resolution, we file with Torrent Power or UGVCL on the common connection. Any load revision the connection needs is raised in this stage.

04

Installation · 1–3 weeks

After feasibility clears we install, working tower by tower so residents keep roof access. Time on site depends on plant size, crane or lift access and the number of towers.

05

Inspection and handover · Set by the licensee

The licensee inspects and fits the bidirectional meter. We hand the committee warranty papers, a monitoring login and a cleaning schedule for the dusty months.

Customers

What businesses say after a year.

We have no society reviews from Ahmedabad to show yet. These are real Heaven Green customers, labelled with the city each system was actually installed in.

★★★★★
From first call to generation start: 28 days. On-site engineer answered every question. Post-installation monitoring app is excellent.
PPriyanka Desai
Residential · Ahmedabad · 3 kW
★★★★★
Our showroom AC bills used to be ₹38k/month. After 25 kW solar, it's ₹3,500. 25-year warranty paperwork was registered same day. Smooth experience.
VVipul Modi
Commercial · Ahmedabad · 25 kW
★★★★★
Booked the site visit on Friday, got a full proposal with shadow analysis on Monday. The drone survey caught a chimney shadow our previous quote missed.
GGeeta Nair
Residential · Surat · 4 kW
Before you sign

Six things to check with any vendor.

  1. Read the licensee's name on the common-area bill before anything else. Torrent Power bills most of the city, but UGVCL bills some schemes on the fringe.
  2. Size the plant on twelve months of common units, not on the roof outline. Tower roofs lose much of their area to tanks, lift rooms and shade.
  3. Check the common connection's sanctioned load early. Schemes that added lifts, pools or EV chargers may need a load revision before approval.
  4. Move pump filling into late morning where you can. Units used on site while the plant generates never pass through the export account.
  5. Get a general body resolution and a named signatory before filing. The licensee application is made in the society's name, not a member's.
  6. Budget central support at ₹18,000 per kW, capped at 3 kW per house and 500 kW, as MNRE's PM Surya Ghar operational guidelines (June 2024) set out. Members' own rooftop plants count against that cap.
Questions

Housing society solar in Ahmedabad, answered.

Cost & output

How much does a housing society solar plant cost in Ahmedabad?
A 25 kW plant sits in a market band of ₹10.75 lakh to ₹13.50 lakh before any support, about ₹43,000 to ₹54,000 per kW at that size. Plants larger than that are priced after a load study, because roof access, tower count and cable length change the cost more than module price does.
How many units will a society plant produce in Ahmedabad?
Each kW produces about 4 to 4.5 units a day as a yearly average on an unshaded roof. A 25 kW plant gives roughly 36,500 to 41,000 units a year and a 100 kW plant about 1.46 to 1.64 lakh units. Compare those with your common-area bills.
What size plant does our scheme need?
It depends on two limits: twelve months of common-area units and the shade-free area left on the towers. Whichever runs out first sets the size. The sanctioned load on the common connection caps it too. We work all three out at the survey before quoting any figure.

Licensee & approvals

Is our society billed by Torrent Power or UGVCL?
Look at the top of your common-area bill. Torrent Power holds the distribution licence for Ahmedabad city, while UGVCL supplies much of the surrounding district. UGVCL runs sub-divisions named Bopal, Shilaj and Shela, so a scheme in the western suburbs may be on UGVCL despite an Ahmedabad address.
Can a society get PM Surya Ghar support for common areas?
Yes. MNRE's PM Surya Ghar operational guidelines (June 2024) give Residential Welfare Associations and Group Housing Societies ₹18,000 per kW for plants serving common facilities, EV charging included. It differs from the per-household slabs. The connection must be dedicated to common facilities and cannot supply the flats, and the modules must be DCR. Capacity is supported up to 3 kW per house and 500 kW.
What does the licensee need from the society?
The common consumer number, a society resolution authorising the plant, a named signatory, and our single-line diagram and equipment datasheets. The licensee checks sanctioned load and transformer capacity, then inspects the plant before fitting a bidirectional meter. We prepare the technical papers and file them for you.

Roof & engineering

Our tower roof is full of tanks and lift rooms. Is solar still possible?
Usually, though on less area than the slab suggests. We map tanks, lift rooms, masts and pipework, then model shade from neighbouring towers. Elevated structures can carry modules above some of the clutter where the slab allows. The shadow study shows what is realistic before you commit.
Will mounting the plant damage our terrace waterproofing?
It should not, if the anchoring is planned around it. We use ballast or anchoring detailed for the existing waterproofing, and seal any fixing that has to penetrate. Ask your vendor in writing how the structure is fixed and who repairs a leak, before the committee signs.
How do Ahmedabad's dust and heat affect a society plant?
Summer dust settles on modules and quietly cuts output, and heat lowers module efficiency. We leave airflow under the modules and walkways for cleaning. Most committees schedule cleaning every two to three weeks from March to June, when dust is heaviest, and rely on the monsoon in July.

Finance & tax

Can our society claim accelerated depreciation?
Probably not in practice. Accelerated depreciation of 40% on solar power generating systems helps entities with taxable business income, and most cooperative housing societies have little. Your auditor should confirm the society's position. A business claiming it is a different case from a residents' society.
What GST applies to a society solar plant?
Since 22 Sep 2025, solar equipment carries 5% GST and the service share of a supply-and-install contract carries 18%. With the service part treated as 30% of the contract value, the blended rate works out to about 8.9%. Ask for an invoice that shows both lines.

About Heaven Green

Does Heaven Green have an office in Ahmedabad?
No. Our only office is at Mota Varachha, Surat. Ahmedabad societies are served by our channel partners and field engineers, who survey, supervise installation and deal with the licensee. Modules come through us as an authorised channel partner of Adani, and inverters are Qbits.
Call WhatsApp