Rooftop solar for foundries and workshops in Shapar–Veraval.

Machining bays, fettling shops and pump assembly lines in Shapar–Veraval draw most of their power in daylight, which is when a rooftop plant produces. We design the plant around your PGVCL connection, supply modules as an authorised channel partner of Adani with Qbits inverters, and file the rooftop papers for you.

PGVCL Rajkot Rural papers handledPurlin and sheet checks on every shedSized to daytime units, not roof areaFree load study before any price

Book a Shapar–Veraval factory survey

Send twelve months of PGVCL bills and your shed location. An engineer calls to agree a survey date and tells you which drawings and load records to keep ready.

Free load study and site survey. No obligation.

Prefer to talk? +91 63904 05060

Distribution licensee
PGVCL
Shapar-Veraval sub-division, Rajkot Rural division
Regulator
GERC
Rooftop, banking and metering terms for Gujarat
Daily yield
4 to 4.5 units per kW
Annual average on a shadow-free roof
200 kW plant
2.92 to 3.29 lakh units a year
Computed from the daily yield band
Depreciation
40% accelerated
Income Tax Rules, Appendix I
GST on a turnkey plant
About 8.9% blended
5% equipment, 18% on the 30% service share

The short answer

Factories in the Shapar–Veraval industrial area south of Rajkot are supplied by PGVCL, which runs a Shapar-Veraval sub-division under its Rajkot Rural division. A rooftop plant there yields 4 to 4.5 units per kW a day, so 200 kW gives roughly 2.92 to 3.29 lakh units a year. Factories get no PM Surya Ghar subsidy; they claim 40% accelerated depreciation. Plants above 25 kW are priced after a load study.

Last reviewed 2 October 2026 · Heaven Green Energy engineering team

The cluster

Shapar–Veraval: Rajkot's casting and engineering belt

Shapar–Veraval is an industrial area in Rajkot district, south of Rajkot city. It is part of the engineering and foundry belt that grew around the city's diesel engine trade, and its sheds are working buildings first.

First, a clarification that saves confusion. This page is about the Veraval next to Shapar in Rajkot district. It is not Veraval town, the fishing port in Gir Somnath district, which has its own page at /solar/veraval. The two share a name and a licensee, PGVCL, but they sit in different districts. Shapar–Veraval falls under PGVCL's Rajkot Rural circle, while Veraval town is handled by the Veraval division of the Junagadh circle.

Wikipedia's article on Rajkot puts the city's foundry count at about 500 units. It says the cluster grew to supply castings to the local diesel engine industry and spreads across Aji Vasahat, Gondal Road, Bhavnagar Road, Shapar, Veraval and Metoda. Most of those units pour grey iron castings for the domestic market, and a small share export motor and automobile castings. The same article lists bearings, diesel engines, auto parts, forgings and machine tools among Rajkot's industrial products.

We do not name any firm as operating in Shapar–Veraval or as our client there. What matters for solar is your own unit. Three things count: what it draws between morning and late afternoon, how much load PGVCL has sanctioned, and whether the shed roof can carry an array. The rest of this page works through those three questions.

Melting and furnace loads

Induction melting is the heaviest draw in a foundry and often runs in long heats, sometimes past sunset. A rooftop plant rarely covers a furnace on its own. It trims the daytime share, so we size against the melt schedule you actually run rather than the furnace nameplate.

Machining, CNC and tool rooms

Lathes, machining centres and grinders run mainly through the day shift, which is a close fit with the solar curve. Their load is steadier than a furnace, so most of the generation is consumed on site as it is produced. This is usually the easiest load in the belt to offset.

Fettling, shot blasting and compressed air

Shot blasting machines, grinders and the compressors behind pneumatic tools draw hard while castings are cleaned and finished. Compressors in particular run for most of the working day. We log their cycles during the survey, since leaks and idle running change what solar can usefully supply.

Pump, motor and assembly lines

Units that assemble pumps, motors or engine parts often test each piece under power before dispatch. Test benches add short, sharp peaks on top of a modest base load. We look at those peaks so the inverter and protection settings suit the way your floor actually draws power.

How the numbers work

Reading the case in units, not rupees

A factory plant earns its keep by replacing grid units your machines use in daylight. We will not print a rupee saving here, because your tariff category, demand charges and day-to-night load split decide it.

Daylight consumption is the number that counts. On a clear Shapar–Veraval roof each kilowatt yields 4 to 4.5 units a day over the year. A 100 kW plant gives about 1.46 to 1.64 lakh units annually; 200 kW gives about 2.92 to 3.29 lakh. Compare that with what your meter records during working daylight hours. A machine shop on one day shift will absorb most of it. A foundry melting through the night will absorb a smaller fraction.

Your PGVCL sanction caps the plant. The licensee approves rooftop capacity against the load sanctioned on your connection, so roof area alone does not set the size. Solar cuts the units you buy; it does not guarantee a lower recorded maximum demand, because a furnace heat during a cloudy spell can still set the peak. Twelve months of bills show us both patterns before we propose a rating.

Tax treatment replaces the household subsidy. PM Surya Ghar covers residential consumers only, so your firm instead claims 40% accelerated depreciation on solar power generating systems under Appendix I of the Income Tax Rules. From 22 Sep 2025, GST is 5% on solar equipment and 18% on the service element, taken as 30% of a supply-and-install contract, which works out to about 8.9% overall. For reference, a 25 kW plant falls in an indicative installed band of ₹10.75 lakh to ₹13.50 lakh, about ₹43,000 to ₹54,000 per kW. Anything bigger is priced after a load study, since structure, cable length and metering move the cost.

Generation from verified Gujarat constants (4 to 4.5 units per kW per day)
Plant sizeUnits a year
25 kW36,500 – 41,063
50 kW73,000 – 82,125
100 kW1,46,000 – 1,64,250
250 kW3,65,000 – 4,10,625
500 kW7,30,000 – 8,21,250

Indicative installed cost at 25 kW: ₹10.75–13.50 lakh (market range, not a quotation). Larger plants are priced after a load study of your bills and roof.

This is what we actually build.

Heaven Green Energy installations across India. Not stock photography, and not renders.

Solar panels installed flush on a corrugated metal factory roof
Factory roof
Long row of solar modules on a commercial rooftop at sunrise
Commercial rooftop
Elevated solar canopy structure above a terrace
Elevated structure
Wall of string inverters at a large solar installation
Electricals
Roof, structure and electricals

Putting an array on a foundry or workshop shed

Casting and machining sheds raise their own issues: heat, dust, crane gantries and old sheeting. We settle three questions before we draw a layout.

Purlins, sheeting and the extra weight

Many sheds in the belt were built for sheeting and wind only. We record purlin section, spacing and span, the sheet profile and how far it has corroded, then calculate the added load from modules and rails. If a bay is under-strength we specify strengthening or leave it out of the layout before you sign.

Dust, heat vents and safe access

Foundry roofs carry fume vents, ridge monitors and a steady film of sand and dust. We keep arrays clear of hot exhaust, plan cleaning access and walkways, and seal every fixing point against the monsoon. The structure is earthed, and lightning protection is designed for the shed height and layout.

Switchgear, protection and the PGVCL interface

Qbits inverters sit close to the main LT panel to keep AC cable runs short. The drawings show DC and AC isolation, surge protection, earthing pits and the metering PGVCL requires. On an HT connection the plant ties in on the LT side of your transformer, and we document that interface for the licensee.

PGVCL

Approvals: who does what.

PGVCL must approve and inspect your plant before it is connected. We prepare the file, keep it consistent with what gets built, and stand with you at the inspection.

1

Load study and drawings

We read your bills, connection type and sanctioned load, survey the shed, and produce the plant rating, layout and single-line diagram. PGVCL reviews exactly these documents, so they are checked before filing.

Us
2

Rooftop application

We submit the application with your consumer number, plant rating, diagram and equipment datasheets. PGVCL checks it against your sanctioned load and the feeder, then approves it or returns it with queries.

Us, then PGVCL
3

Build and safety documentation

We install to the approved design and compile test results, earthing readings and protection settings. If your plant size needs Electrical Inspectorate clearance under the current rules, we prepare and follow up that file too.

Us
4

Inspection, meters and switch-on

PGVCL inspects the plant and installs or certifies the required meters. After energisation the generation shows on your bill. Our engineer attends the inspection so any query is answered on the spot.

PGVCL
Paying for it

Three ways to fund the plant.

You can own the plant, borrow for it, or buy its output. The right choice depends on your tax position and how you treat capital spending.

Buy it outright

Your firm pays for the plant, records it as a fixed asset and claims 40% accelerated depreciation in the year it is first used. This suits a profitable, taxpaying unit. You keep every unit generated, and an AMC with us covers cleaning, inspections and inverter checks.

Bank or NBFC finance

Lenders finance rooftop plants for MSMEs, and you still own the asset and claim depreciation. We provide the quotation, bill of materials and unit-generation estimate a lender asks for. The lender sets the rate and tenure, so compare total cost across offers before choosing.

Third-party ownership (OPEX)

An investor owns the plant on your roof and bills you for the units it supplies. No capital leaves your account, and no depreciation comes to you either. Check tenure, buy-out terms, roof access and what happens if you move premises before you sign.

From enquiry to export

How the project runs.

Five stages from your first call to a commissioned plant. You see every drawing before it goes to PGVCL.

Where we work from

Heaven Green Energy has a single office, at Mota Varachha in Surat. We do not have an office in Rajkot. Our channel partner network and field engineering team cover Shapar–Veraval and the rest of Saurashtra, running surveys, supervising installation and attending PGVCL inspections. We tell you this before you sign, not after.

01

Bills and a first read · Day 1

You send twelve months of PGVCL bills and the shed location. We check connection type, sanctioned load and daytime use, and tell you honestly whether a survey is worth your time.

02

Shed and load survey · Week 1

An engineer measures purlins, sheeting, shading and cable routes, and inspects the main panel. For foundries we note furnace schedules; where needed we log the load for several days.

03

Design and written proposal · Week 2

You get the layout, single-line diagram, itemised bill of materials and a generation estimate in units. The price comes from this design, not from a per-kW rate card.

04

Approval and installation · Weeks 3 to 8

We file with PGVCL, procure Adani modules and Qbits inverters, and install in stages so production keeps running and the roof stays sealed.

05

Commissioning and upkeep · After approval

PGVCL inspects and connects the plant. We hand over test reports and warranties, set up monitoring, and begin the maintenance schedule in your contract.

Customers

What businesses say after a year.

Plants we have built for industrial and commercial customers, each shown with its real city. None is in Shapar–Veraval or Rajkot, and we make no claim that it is.

★★★★★
250 kW industrial system on our chemical plant. Generation has been 8% above estimate every month. Their O&M team is responsive.
SSanjay Joshi
Industrial · Bharuch · 250 kW
★★★★★
150 kW at our textile factory dropped power costs by 68%. The ROI calculation they provided was spot-on, break-even under 4 years.
MMihir Shah
Commercial · Surat · 150 kW
★★★★★
80 kW on our hospital rooftop. Diesel backup running time cut by 60%. Heaven Green's structural design cleared all wind-load checks first time.
NNilesh Bhatt
Commercial · Anand · 80 kW
Before you sign

Six things to check with any vendor.

  1. Shapar–Veraval is in Rajkot district and supplied by PGVCL through its Shapar-Veraval sub-division, Rajkot Rural division. It is not Veraval town in Gir Somnath.
  2. A kilowatt of rooftop solar here gives 4 to 4.5 units a day, so a 200 kW plant makes about 2.92 to 3.29 lakh units a year.
  3. Machining and finishing loads match daylight generation closely; furnace melting usually needs more power than a roof can supply.
  4. Factories get no PM Surya Ghar subsidy. They claim 40% accelerated depreciation under Appendix I of the Income Tax Rules.
  5. GST on a turnkey plant blends to about 8.9%: 5% on equipment and 18% on the 30% service share.
  6. Your sanctioned load caps the plant size, and anything above 25 kW is priced after a load study.
Questions

Industrial solar in Shapar–Veraval, answered.

Cost & output

What does rooftop solar cost for a factory in Shapar–Veraval?
A 25 kW plant sits in an indicative installed band of ₹10.75 lakh to ₹13.50 lakh in Gujarat, about ₹43,000 to ₹54,000 per kW. Bigger plants are priced only after a load study, because purlin work, cable runs and metering change the cost. Every quotation comes with an itemised bill of materials.
How many units will a 200 kW plant produce in Shapar–Veraval?
Roughly 2.92 to 3.29 lakh units a year, based on 4 to 4.5 units per kW per day on a shadow-free roof. Summer months run above that average and monsoon months below it. Your proposal shows the expected output month by month.
Can solar run my induction furnace?
Only partly. Induction melting draws far more power than a typical shed roof can generate, and heats often continue after dark. Solar trims the daytime share of that load and covers machining, finishing and lighting better. We size the plant to the units you use in daylight, not to the furnace rating.

Licensee & approvals

Which licensee supplies Shapar–Veraval?
PGVCL. Its Disaster Management Plan 2025 lists a Shapar-Veraval sub-division under the Rajkot Rural division and Rajkot Rural circle. Torrent Power has no licence area here. If your bill names a different licensee, follow the bill, and tell us at the first call.
Is this the same Veraval as the port town in Gir Somnath?
No. This page covers the Veraval beside Shapar in Rajkot district, an industrial area south of Rajkot city. Veraval town is a separate place in Gir Somnath district with its own page at /solar/veraval. Both are PGVCL areas: Veraval town sits in the Junagadh circle, Shapar–Veraval in Rajkot Rural.
Who sets the banking and metering rules for a factory plant?
The Gujarat Electricity Regulatory Commission, through its regulations, read with the Gujarat Solar Power Policy. PGVCL applies them; installers do not write them. The terms vary by consumer category and plant type, so we confirm the rules for your connection in writing before the design is final.

Roof & engineering

Can an old foundry shed carry solar panels?
Often, but not always. We measure purlin sections and spacing, check how far the sheeting has corroded, and calculate the extra load. Weak bays are strengthened or left out. If the sheeting is near the end of its life, replace it before the array goes up.
Will foundry dust cut the plant's output?
Yes, if the modules are left dirty. Sand and fume deposits reduce generation until they are washed off. We keep arrays away from hot exhausts, plan walkways for cleaning, and set a cleaning frequency in the maintenance schedule based on what we see on your roof.
Does an HT connection change the design?
Yes. On an HT supply the plant normally connects on the LT side behind your transformer, and the protection, metering and drawings must show that arrangement. We document the interface for PGVCL and set protection so the plant disconnects correctly when the grid side trips.

Finance & tax

Is my factory eligible for the PM Surya Ghar subsidy?
No. PM Surya Ghar is a residential scheme. A factory claims 40% accelerated depreciation on solar power generating systems under Appendix I of the Income Tax Rules. Ask your chartered accountant how that fits your firm's tax position before choosing between ownership and an OPEX contract.
How is GST charged on a turnkey factory plant?
Since 22 Sep 2025, solar equipment carries 5% GST and services 18%. In a supply-and-install contract the service share is taken as 30%, so the blended rate is about 8.9%. A GST-registered business may be able to claim input tax credit; your accountant should confirm it.

About Heaven Green

Does Heaven Green have an office near Shapar–Veraval?
No. Our only office is at Mota Varachha in Surat. Our channel partner network and field engineering team handle surveys, installation supervision and PGVCL inspections in the Rajkot belt. Modules come through our role as an authorised channel partner of Adani, and inverters are Qbits.
Call WhatsApp