Rooftop solar for apartment societies in Vadodara.

Your Vadodara society's common connection runs the lifts, the sump-to-tank pumps and every staircase light, and MGVCL bills it to the association. A terrace plant on that connection cuts the units your maintenance fund pays for. We check the bill's name and category, size the plant on a year of common-area units, and prepare the papers MGVCL asks for.

MGVCL common-meter papers preparedSized on your society's own unitsAuthorised channel partner of AdaniFree survey and committee proposal

Book a terrace survey for your society

Share the latest common-meter bill and how many flats and floors you have. An engineer calls the chairman or secretary and fixes a survey the committee can attend.

Free load study and site survey. No obligation.

Prefer to talk? +91 63904 05060

Licensee
MGVCL
Registered office at Race Course, Vadodara; Torrent Power holds no licence here
Name on the bill
Society or RWA
MGVCL asks for a change of name if the common meter is in one person's name
Common-meter category
RGP
Required by MGVCL's checklist; another category needs changing first
Generation
4 to 4.5 units per kW daily
Annual average on a shadow-free terrace
25 kW market band
₹10.75 lakh to ₹13.50 lakh
Before any subsidy; bigger plants are priced after a load study
Central support
₹18,000 per kW
Common facilities only; MNRE guidelines, June 2024

The short answer

A Vadodara housing society can put a rooftop solar plant on its terrace and connect it to the common meter that MGVCL bills to the association. MGVCL expects that bill in the society's name and under the RGP category before it processes the file. Each kilowatt generates 4 to 4.5 units a day. Under MNRE's PM Surya Ghar operational guidelines (June 2024), a GHS or RWA plant serving common facilities only attracts ₹18,000 per kW of central support. That support covers up to 3 kW per house and 500 kW at most.

Last reviewed 2 October 2026 · Heaven Green Energy engineering team

Societies, apartments and RWAs

Which loads a Vadodara society plant is built to carry

A society plant offsets one account: the common connection. Flats keep their own meters and their own bills. Before sizing anything, we list what hangs off that common account, because the mix of loads decides how much output gets used by day.

Walk through a typical Vadodara apartment block and you find two layers of supply. Every flat has an MGVCL meter in the owner's name. The association holds a separate connection for the parts nobody owns alone: lifts, pumps, the stair core, the compound and the gate. Monthly maintenance pays that bill, so a cut in its units reaches every owner at once.

The size of that account varies widely. A four-storey block without a lift may draw little beyond stair lights and one pump. A taller building with several lifts, fire and booster pumps, a clubhouse and basement fans can carry a common bill larger than any single flat's. The plant has to fit the account you actually have, so we read the bills before we read the roof.

Timing decides value. Panels produce from mid-morning to late afternoon, while a society uses much of its power after dark. Whatever the building cannot use at midday is exported to MGVCL and set against night draw under the GERC framework. A committee that moves pump runs into daylight keeps more of its own output on site.

Lifts

Lifts draw heavy current in short bursts, peaking when residents leave for work and come home in the evening. In a block with two or more cars per wing, lifts usually lead the common bill. The plant does not drive the lift directly; it lowers the account's net monthly units.

Sump and overhead-tank pumps

Most societies lift water from an underground sump to overhead tanks, often twice a day. That pump is the easiest load to move. A timer that runs it in late morning puts it inside solar hours, so more generation is consumed on site instead of exported for credit.

Stair, compound and street lighting

These lights run all night and never coincide with generation. Export credits earned at noon carry them. Replacing old tube lights and sodium fittings with LED before sizing shrinks the night load, and with it the size of plant the committee has to pay for.

Clubhouse, gym and EV charging

Newer societies add a clubhouse, gym air conditioning and shared EV chargers to the common account. PM Surya Ghar's guidelines name EV charging among the common facilities a GHS or RWA plant may serve. Tell us about chargers you plan to add, so the plant is sized once.

How the numbers work

Reading the numbers in units, the way MGVCL bills them

Judge a society plant by the units it takes off the common account each month. The rupee value depends on the category and slabs printed on your own bill, so your treasurer converts it; this page does not guess a tariff.

Start with output. Each kilowatt on a clear Vadodara terrace averages 4 to 4.5 units a day. A 10 kW plant gives about 1,200 to 1,350 units a month. A 25 kW plant gives 100 to 112 units a day, roughly 36,500 to 41,000 units over a year. A 50 kW plant on a large campus doubles that to about 73,000 to 82,000 units. Set these beside twelve months of common-meter bills and you can see what share of the shared load the terrace carries.

The connection sets the ceiling. MGVCL tests the proposed capacity against the sanctioned load of the common connection and the transformer that feeds it. A society whose bill has grown since handover, with more lifts or new chargers, may need a load revision first. Daytime match matters as well: units used on site avoid the full billed rate, while exported units are settled under the GERC framework.

Tax and GST. GST is charged at 5% on the equipment and 18% on the service portion, taken as 30% of a supply-and-install contract. That blends to about 8.9%, and these rates have applied since 22 Sep 2025. A housing society usually cannot claim that back, so budget the GST-inclusive price. The 40% accelerated depreciation under Appendix I of the Income Tax Rules suits taxpaying businesses. For a society with little taxable income it rarely helps, and the society's auditor should confirm either way.

Generation from verified Gujarat constants (4 to 4.5 units per kW per day)
Plant sizeUnits a year
25 kW36,500 – 41,063
50 kW73,000 – 82,125
100 kW1,46,000 – 1,64,250
250 kW3,65,000 – 4,10,625
500 kW7,30,000 – 8,21,250

Indicative installed cost at 25 kW: ₹10.75–13.50 lakh (market range, not a quotation). Larger plants are priced after a load study of your bills and roof.

This is what we actually build.

Heaven Green Energy installations across India. Not stock photography, and not renders.

Solar panels installed flush on a corrugated metal factory roof
Factory roof
Long row of solar modules on a commercial rooftop at sunrise
Commercial rooftop
Elevated solar canopy structure above a terrace
Elevated structure
Wall of string inverters at a large solar installation
Electricals
Roof, structure and electricals

Terrace, structure and wiring on a Vadodara society building

Societies share the terrace with tanks, lift rooms and residents who use it. The survey settles what area is usable, how modules are held down, and how the plant reaches the common meter without disturbing the building.

Shadow-free terrace area

We map shadows from overhead tanks, lift machine rooms, staircase heads and the parapet across the seasons, since a low winter sun lengthens every one of them. What remains is the usable area. Where tanks crowd the roof, an elevated structure lifts modules clear and leaves the terrace walkable underneath for cleaning and residents.

Holding down and waterproofing

Vadodara's long dry season bakes the terrace slab, and the monsoon then tests every joint at once. We prefer ballasted or chemically anchored bases that avoid drilling through the waterproofing, and we seal any penetration we cannot avoid. Fire exits, the terrace door and access to the tanks stay clear for cleaning and emergencies.

Cable route, meter room and MGVCL checks

Cables descend a shaft to the common-meter room, often several floors down. We size conductors for that distance and fit surge protection, earthing and an isolator MGVCL can inspect. If the meter room sits in a basement or a low-lying pocket that floods in heavy monsoons, the inverter and switchgear go above likely water.

MGVCL

Approvals: who does what.

MGVCL processes a common-meter application only when the society's own papers are in order. We prepare both sets, but the resolution and the bill's name and category come first.

1

Bill name, category and society papers

MGVCL's common-meter checklist asks for the latest bill in the society or RWA name and the common meter under the RGP category. It also asks for the association's memorandum (bandharan) and a resolution (tharav) approving the plant. We tell you early if a change of name or category is needed.

Us
2

Authority for the chairman

The association authorises its chairman (pramukh) to sign the agreement and other documents, through a notarised authority letter on stamp paper as the checklist specifies, along with the chairman's Aadhaar. We draft the letter for the other office-bearers to sign.

Us
3

Application, feasibility and installation

We file in the society's name. MGVCL checks capacity against the common connection's sanctioned load and the local transformer. We install only after feasibility is released, then MGVCL inspects earthing, protection and isolation on the terrace and in the meter room.

Us, then MGVCL
4

Bidirectional meter

MGVCL replaces the common meter with a bidirectional one and records commissioning. Export credits on the society account run from that date. Any PM Surya Ghar claim for the society then proceeds on the national portal against the commissioned plant.

MGVCL
Paying for it

Three ways to fund the plant.

A society needs a funding route the general body can approve and the minutes can record. Three routes cover most committees, and which ones are open to you depends on your bylaws.

Central support under PM Surya Ghar

MNRE's PM Surya Ghar operational guidelines (June 2024) pay a Group Housing Society or RWA ₹18,000 per kW for a plant serving common facilities, EV charging included. Supported capacity stops at 3 kW per house and never exceeds 500 kW, and it includes plants that flats have already installed. The claim belongs to the association that maintains the common areas, the connection must not supply any flat, and every module must be DCR.

Repair fund or per-flat contribution

Many associations pay from the repair or sinking fund; others split the cost across flats, equally or by area, as the bylaws direct. Either route needs a recorded resolution. Show owners the units the plant removes from the common bill, since that is the figure they will check afterwards.

Loan or instalments

Where funds are thin, the plant can be financed and repaid from maintenance collections. We introduce our finance partner and supply the quotation, layout and Bill of Materials a lender asks for. The committee should weigh repayments against the expected fall in common-meter units before anyone signs.

From enquiry to export

How the project runs.

Five stages take a Vadodara society from the first call to export credits on its MGVCL common account.

Where we work from

Heaven Green Energy's only office is at Mota Varachha, Surat. There is no branch in Vadodara. Our channel partner network and field engineering team cover the city and the wider Central Gujarat region, running terrace surveys, supervising installation and attending MGVCL inspections. We tell committees this at the first meeting, before anything is signed.

01

Terrace and meter survey · Day 1 to 3

An engineer walks the terrace, logs tanks and shadows, photographs the common meter, notes its sanctioned load and category, and collects a year of common-account bills.

02

Proposal for the committee · Day 4 to 7

You receive a written layout, plant size, Bill of Materials, yearly unit estimate and price, with a short note the secretary can forward to every flat owner.

03

Papers and resolution · Set by the society

The committee passes the tharav, signs the chairman's authority letter and fixes funding. If the bill needs a name or category change, that goes to MGVCL first.

04

MGVCL filing and installation · After feasibility

We file, wait for feasibility, then install over several working days, planned around lift use, water timings and residents who use the terrace.

05

Inspection, meter and handover · Set by MGVCL

MGVCL inspects and fits the bidirectional meter. Monitoring access, warranties and the cleaning schedule are handed to the committee, not to one resident.

Customers

What businesses say after a year.

These are residential Heaven Green Energy customers, each shown with the city their system went into. None is presented as a Vadodara society plant, because we have not relabelled anyone to suit this page.

★★★★★
Got the full ₹78,000 PM Suryaghar subsidy credited within 30 days of commissioning. Not one extra trip needed, they did all the follow-up.
AAshok Mehta
Residential · Vadodara · 6 kW
★★★★★
From first call to generation start: 28 days. On-site engineer answered every question. Post-installation monitoring app is excellent.
PPriyanka Desai
Residential · Ahmedabad · 3 kW
★★★★★
Zero advance, just like they promised. EMI through their finance partner, installation done before the first payment was due. Bills practically gone.
DDharmesh Vyas
Residential · Mehsana · 5 kW
Before you sign

Six things to check with any vendor.

  1. The plant connects to the society's common meter, which MGVCL bills to the association, never to an individual flat's meter.
  2. MGVCL's common-meter checklist wants the bill in the society or RWA name and under the RGP category; correct either first if it is wrong.
  3. Keep the bandharan, a tharav for the plant, the chairman's notarised authority letter and the chairman's Aadhaar ready before filing.
  4. Each kilowatt yields 4 to 4.5 units a day in Vadodara; a 25 kW plant makes about 36,500 to 41,000 units a year.
  5. PM Surya Ghar pays a GHS or RWA ₹18,000 per kW for common facilities only, counts plants flats already have within its cap, and needs DCR modules.
  6. Move pump runs into daylight and switch common lights to LED before sizing, so less output is exported and more is used on site.
Questions

Housing society solar in Vadodara, answered.

Cost & output

What does a solar plant for a Vadodara housing society cost?
A 25 kW plant falls in a market band of ₹10.75 lakh to ₹13.50 lakh before any subsidy, about ₹43,000 to ₹54,000 per kW at that size. Larger society plants are priced after a load study of the common account, because terrace layout, structure height and cable runs all move the figure.
How many units will the plant take off our common bill?
Each kilowatt averages 4 to 4.5 units a day on a clear Vadodara terrace. A 10 kW plant makes about 1,200 to 1,350 units a month, and a 25 kW plant about 36,500 to 41,000 a year. Compare that with twelve months of common-meter units to see the share the terrace covers.
Will the solar plant keep our lifts running in a power cut?
No, not a standard grid-tied plant. The inverter shuts down when MGVCL supply fails, so line workers are never exposed to back-feed. Lifts during an outage still need the society's DG set or a battery system designed for that load, which is a separate decision with its own quotation.

Licensee & approvals

Is our society served by MGVCL or Torrent Power?
MGVCL. Madhya Gujarat Vij Company Limited, registered at Race Course, Vadodara, is the licensee for the city, and Torrent Power holds no Vadodara licence. That covers societies in Alkapuri, Akota and Karelibaug as much as fringe villages such as Bhayli and Sevasi. The licensee's name is printed on your bill.
What does MGVCL need before it accepts a society's application?
Its common-meter checklist asks for the latest bill in the society or RWA name, the RGP category on that meter and the association's memorandum. It also asks for a resolution approving the plant, a notarised authority letter for the chairman and the chairman's Aadhaar. A wrong name or category has to be corrected first.
Can flat owners still claim PM Surya Ghar for their own meters?
Individually, yes, where the society allows a flat its own plant, but it affects the society's claim. Under MNRE's PM Surya Ghar operational guidelines (June 2024), a GHS or RWA is supported on up to 3 kW per house. That capacity includes plants individual residents have already installed. A society of 40 flats with 30 kW already on private meters has 90 kW left. Plan both together before anyone files on the national portal.

Roof & engineering

How much terrace does a society plant need?
It depends on the shadow-free area left after tanks, lift rooms and parapet shadows, not on the gross terrace. Our survey maps that area across the seasons and fits the largest sensible layout. Where tanks crowd the roof, an elevated structure can recover space that a flat layout loses.
Do the mounting bases need holes in our terrace?
Usually not. We prefer ballasted or chemically anchored bases that sit on the slab without cutting the waterproofing layer. Where a fixing has to go through, we seal it and record its position for the committee. Ask any vendor to show you the base detail in writing before you compare quotes.
Where should the inverter go in our building?
Close to the common-meter room, but above any water. Basement and ground-floor meter rooms in low-lying Vadodara pockets have flooded in heavy monsoons, so we mount the inverter and switchgear high and ventilated. The cable route and isolator position are agreed with MGVCL's inspection in mind.

Finance & tax

Does GST apply when a society buys a solar plant?
Yes. Since 22 Sep 2025, solar equipment carries 5% GST and the service portion, taken as 30% of a supply-and-install contract, carries 18%, about 8.9% blended. A housing society normally cannot claim input credit, so the committee should approve the GST-inclusive figure.
Can the society claim accelerated depreciation?
Rarely in practice. The 40% rate for solar power generating systems under Appendix I of the Income Tax Rules helps an entity that has taxable income to set it against. Most cooperative housing societies have little, so the society's auditor should confirm before the committee counts on it.

About Heaven Green

Why work with Heaven Green Energy on a Vadodara society plant?
We prepare the MGVCL common-meter papers, size the plant on your own units, and supply modules as an authorised channel partner of Adani, with Qbits inverters. Our office is in Surat, not Vadodara; our field team and channel partners run the survey, installation and inspection on site.
Call WhatsApp