Rooftop solar for factories in Savli GIDC and Manjusar.

Engineering and electronics units in Savli GIDC, north of Vadodara, run their heaviest loads in daylight, which is when a shed-roof plant produces. We survey your roof and panel room, design around your sanctioned load, file with the MGVCL sub-division named on your bill, and maintain the plant after connection. Modules come through our Adani channel partnership.

Savli and Manjusar MGVCL files handledPurlin and sheet survey before any priceAdani modules, Qbits invertersFree load study, no advance

Book a Savli or Manjusar factory survey

Share one recent MGVCL bill and your plot number. Our engineer phones you to fix a survey date and lists the drawings and records worth keeping ready.

Free load study and site survey. No obligation.

Prefer to talk? +91 63904 05060

Licensee
MGVCL
Baroda O&M Circle, Baroda (O&M) Division
Sub-divisions
Savli and Manjusar Industrial
Both listed in MGVCL's contact directory
Estate size
About 800 hectares
GIDC estate, as described on Wikipedia
Output per kW
4 to 4.5 units a day
Annual average, unshaded roof
200 kW plant
2.92 to 3.29 lakh units a year
Computed from the daily band
Tax treatment
40% accelerated depreciation
Appendix I, Income Tax Rules

The short answer

Factories in Savli GIDC and the Manjusar units buy power from Madhya Gujarat Vij Company Limited (MGVCL), through its Savli and Manjusar Industrial sub-divisions. Each kW of unshaded roof solar there yields 4 to 4.5 units a day, so a 200 kW plant makes about 2.92 to 3.29 lakh units a year. Firms claim 40% accelerated depreciation instead of a subsidy. Plants above 25 kW are priced after a load study.

Last reviewed 2 October 2026 · Heaven Green Energy engineering team

The Savli and Manjusar estate

A large engineering estate with two MGVCL desks

Savli GIDC is one of the bigger estates in Vadodara district, and the Manjusar units sit on the same northern stretch. Knowing which MGVCL office holds your connection saves weeks on a rooftop file.

Wikipedia describes the Savli industrial area as a GIDC-owned estate of about 800 hectares, home to engineering and electronics manufacturers. It lies north of Vadodara city, towards the Mahi river, and the same article places it on the Savli to Halol route of the Delhi to Mumbai Industrial Corridor project. We do not list firms inside the estate. A factory's roof, bill and load profile are what decide its plant, not its neighbours.

MGVCL serves the area from its Baroda O&M Circle. Its contact directory places a Savli sub-division and a separate Manjusar Industrial sub-division under the Baroda (O&M) Division. In practice that means two units a short drive apart can have their rooftop applications read by different offices. The office printed on your bill is the one that receives your file.

One caution on licensees. Wikipedia also records Savli as a location for an Export Promotion Industrial Park that was proposed for elevation to a Special Economic Zone. We could not confirm from an official source whether any SEZ inside the estate has been notified or holds its own distribution licence. If your unit sits in an EPIP or SEZ block, check the licensee named on your bill before you plan anything.

Heavy engineering and fabrication bays

Tall sheds with overhead cranes, welding bays, machining centres and test rigs draw most of their power on the day shift. Crane runways and roof monitors limit where panels can sit, so we draw the layout around them. Motor starts and welding surges get logged during the survey.

Electrical and electronic equipment plants

Assembly lines, burn-in rooms, test bays and compressed air run steadily through working hours. That flat daytime base load suits rooftop solar well, since nearly every unit is used on site. Sensitive test equipment means we pay close attention to harmonics and earthing in the design.

Process and chemical units

Some Savli and Manjusar plants run reactors, dryers, pumps and cooling towers round the clock. Solar then trims a constant base load instead of covering a peak. Chemical fallout on the roof calls for coated fixings and a shorter cleaning and inspection interval in the maintenance contract.

Supplier workshops on one shift

Smaller plots feeding the larger plants often work a single shift and close one day a week. On that day a plant exports most of what it makes. We size these units against weekday daylight demand, so you are not paying for capacity that mostly feeds the grid.

How the numbers work

Count the daylight units first

A Savli factory plant is sized from the units your meter records between morning and late afternoon. Rupee savings depend on your tariff category and demand charges, so we work them out from your own bills, not from this page.

Generation is predictable; usage is the variable. A kilowatt of shadow-free roof in this part of Gujarat produces 4 to 4.5 units a day on average across the year. That gives roughly 1.46 to 1.64 lakh units a year from 100 kW, 2.92 to 3.29 lakh from 200 kW and 7.3 to 8.21 lakh from 500 kW. Set those figures against what your plant consumes in daylight. When daytime use comfortably exceeds generation, almost every unit displaces grid power, and that is the position to aim for.

Sanctioned load and recorded demand behave differently. MGVCL assesses a rooftop plant against the load sanctioned on your connection, so a 10,000 square metre roof does not automatically justify a large plant. Solar cuts the units you buy. It cannot promise a lower maximum demand reading, because a cloudy monsoon afternoon with every machine running will still pull that peak from the grid. We read twelve months of bills, demand column included, before recommending a rating.

Tax does the work a subsidy would. PM Surya Ghar is for homes, so a manufacturer instead claims 40% accelerated depreciation on solar power generating systems under Appendix I of the Income Tax Rules. Since 22 Sep 2025, GST is 5% on solar equipment and 18% on services. With the service share of a supply-and-install contract taken at 30%, the blended rate is about 8.9%. As a reference point only, the indicative installed band for 25 kW in Gujarat is ₹10.75 lakh to ₹13.50 lakh, about ₹43,000 to ₹54,000 per kW at that size. Larger plants are priced after a load study, since structure, cable runs and metering shift the cost.

Generation from verified Gujarat constants (4 to 4.5 units per kW per day)
Plant sizeUnits a year
25 kW36,500 – 41,063
50 kW73,000 – 82,125
100 kW1,46,000 – 1,64,250
250 kW3,65,000 – 4,10,625
500 kW7,30,000 – 8,21,250

Indicative installed cost at 25 kW: ₹10.75–13.50 lakh (market range, not a quotation). Larger plants are priced after a load study of your bills and roof.

This is what we actually build.

Heaven Green Energy installations across India. Not stock photography, and not renders.

Solar panels installed flush on a corrugated metal factory roof
Factory roof
Long row of solar modules on a commercial rooftop at sunrise
Commercial rooftop
Elevated solar canopy structure above a terrace
Elevated structure
Wall of string inverters at a large solar installation
Electricals
Roof, structure and electricals

Engineering for Savli sheds

Before any module is ordered we settle three questions: can the roof carry the array, will it stay put and stay safe, and where does it join your electrical system.

Roof load and sheet condition

Crane bays and wide-span sheds in Savli vary in purlin depth, spacing and sheet gauge. We measure each, calculate the added dead load and inspect sheets for corrosion and thinning. Where the roof needs strengthening or re-sheeting, the proposal says so in writing and prices that work separately.

Wind, water and safe access

Mounting rails fix into purlins through sealed penetrations so the shed stays dry in the monsoon. The layout keeps ridge vents, skylights and smoke outlets clear and leaves walkways for cleaning crews. The structure is earthed, and lightning protection is designed for the real height of your building.

Panel room, protection and MGVCL metering

Qbits inverters go close to the main LT panel to keep AC cable runs short. The design carries DC and AC isolation, surge protection, earth pits and the meters MGVCL specifies. On an HT supply the plant connects on the LT side of your transformer, and the single-line diagram shows the exact tie-in.

MGVCL

Approvals: who does what.

Nothing connects until MGVCL approves it. Files move fastest when they reach the right sub-division with drawings that match the roof as built.

1

Bills, sanctioned load and drawings

We gather a year of bills, confirm your sanctioned load and connection type, then survey roof and panel room. You receive a layout, single-line diagram and datasheets. We also note whether Savli or Manjusar Industrial holds your account.

Us
2

Application to your sub-division

We lodge the rooftop application with the MGVCL office printed on your bill. The sub-division checks the proposed rating against your sanctioned load and the local feeder, then approves it or asks for changes, which we answer.

Us, then MGVCL
3

Installation and safety file

We build to the approved drawings and record insulation tests, earth resistance and protection settings. Where plant size calls for Electrical Inspectorate clearance, we prepare that file and chase it until the certificate is issued.

Us
4

Inspection and energisation

MGVCL inspects the installation, fits or certifies the meters and energises the plant. Solar generation starts appearing on your bill from that cycle. Our engineer attends the inspection so questions are settled on the roof.

MGVCL
Paying for it

Three ways to fund the plant.

Pick a route by your tax position and whether you want the plant on your own books. All three are used by manufacturers in the Vadodara estates.

Capital purchase

Your company owns the plant and claims 40% accelerated depreciation from the year it is put to use. This suits a profitable unit with cash to deploy. Every unit generated is yours, and an AMC with us covers cleaning, inspections, inverter health checks and the generation reports your auditor will ask for.

Bank or NBFC loan

Lenders finance rooftop plants for MSMEs while your firm keeps ownership and the depreciation claim. We supply the quotation, bill of materials and month-by-month generation estimate in units that a credit officer needs. Rate and tenure are the lender's call, so compare total repayment rather than the monthly instalment alone.

RESCO agreement

A developer installs and owns the plant on your roof and bills you for the units supplied. You spend no capital and claim no depreciation. Read the tenure, buy-out terms, roof access rights and exit clauses closely, because the contract ties your premises to the developer for its full term.

From enquiry to export

How the project runs.

Five stages take a Savli or Manjusar unit from enquiry to a connected plant. You approve each document before MGVCL sees it.

Where we work from

Heaven Green Energy has one office, at Mota Varachha in Surat. We serve factories in Savli GIDC, Manjusar and the wider Central Gujarat region through our channel partner network and field engineering team. The team carries out roof surveys, supervises installation and attends MGVCL inspections in person. We have no branch in Vadodara district and say so before you sign.

01

Bill review · Day 1

You share twelve months of bills and plot details. We check sanctioned load, supply voltage and daytime consumption, and tell you plainly if a visit is not worth your time.

02

Roof and load survey · Week 1

An engineer measures purlins, sheets and shading, traces the cable route and opens the main panel. If the load pattern is unclear, we log it over several working days.

03

Design and written offer · Week 2

You receive the layout, single-line diagram, a bill of materials with makes and quantities, and monthly output in units. The price is built from that design.

04

MGVCL approval and build · Weeks 3 to 8

We file with your sub-division, procure Adani modules and Qbits inverters and install in stages that fit your shift pattern, keeping the shed weather-tight throughout.

05

Connection and maintenance · After MGVCL inspection

MGVCL inspects and energises the plant. We hand over test records and warranties, start remote monitoring and begin the cleaning and inspection schedule set out in your contract.

Customers

What businesses say after a year.

These reviews come from Heaven Green commercial and industrial customers in Bharuch, Surat and Anand. None is from Savli, and each keeps the city where the plant was actually installed.

★★★★★
250 kW industrial system on our chemical plant. Generation has been 8% above estimate every month. Their O&M team is responsive.
SSanjay Joshi
Industrial · Bharuch · 250 kW
★★★★★
150 kW at our textile factory dropped power costs by 68%. The ROI calculation they provided was spot-on, break-even under 4 years.
MMihir Shah
Commercial · Surat · 150 kW
★★★★★
80 kW on our hospital rooftop. Diesel backup running time cut by 60%. Heaven Green's structural design cleared all wind-load checks first time.
NNilesh Bhatt
Commercial · Anand · 80 kW
Before you sign

Six things to check with any vendor.

  1. Savli GIDC and the Manjusar units are on MGVCL, under the Savli and Manjusar Industrial sub-divisions of the Baroda (O&M) Division.
  2. If your unit is inside an EPIP or SEZ block, confirm the licensee printed on your bill; we could not verify a separate SEZ licensee.
  3. Each kW of unshaded roof gives 4 to 4.5 units a day, so a 200 kW plant makes about 2.92 to 3.29 lakh units a year.
  4. Factories get no PM Surya Ghar subsidy; the firm claims 40% accelerated depreciation on the plant instead.
  5. GST on a supply-and-install contract blends to about 8.9%: 5% on equipment, 18% on the 30% service share.
  6. Sanctioned load and daylight consumption set the rating, and plants above 25 kW are priced only after a load study and roof check.
Questions

Industrial solar in Savli GIDC, answered.

Cost & output

How much does solar for a factory in Savli GIDC cost?
For a 25 kW plant the indicative installed band in Gujarat is ₹10.75 lakh to ₹13.50 lakh, roughly ₹43,000 to ₹54,000 per kW. Factory plants above that size are priced after a load study, because roof strengthening, cable length and metering change the figure. Each offer includes a written bill of materials.
How many units will a 500 kW plant make in Savli?
About 7.3 to 8.21 lakh units a year, using 4 to 4.5 units per kW per day on a shadow-free roof. The dry months run above that average and the monsoon months below it. Your proposal shows expected generation month by month so you can match it to production.
Why not cover the whole shed roof with panels?
Because MGVCL approves the plant against your sanctioned load, and a plant larger than your daytime use pushes units to the grid instead of offsetting purchases. We start from bills and load logs, choose the rating, and only then work out how much of the roof it occupies.

Licensee & approvals

Who supplies electricity to Savli GIDC and Manjusar?
Madhya Gujarat Vij Company Limited. MGVCL's directory lists a Savli sub-division and a Manjusar Industrial sub-division under its Baroda (O&M) Division. Torrent Power has no licence here. Units inside an EPIP or SEZ block should confirm the licensee named on their own bill before planning a plant.
Does an SEZ in Savli have its own power licensee?
We could not verify one. Wikipedia notes Savli's Export Promotion Industrial Park was proposed for elevation to an SEZ, but we found no official record of a separate distribution licensee. Your bill settles it: if it names MGVCL, we file with MGVCL; if it names another licensee, we follow that licensee's procedure.
How does MGVCL net metering work for industrial units?
The terms come from GERC orders and the Gujarat Solar Power Policy, which MGVCL applies by consumer category. We do not quote clauses from memory. Before the plant size is fixed, we confirm in writing the metering and settlement arrangement that currently applies to your connection type.

Roof & engineering

Can a crane-bay shed roof carry solar panels?
Usually, once checked. Crane bays often have long spans and roof monitors, so we measure purlins, check sheet gauge and calculate the extra dead load. Panels stay clear of monitors, vents and smoke outlets. If strengthening is needed, the proposal states it and prices it separately.
Will roof works stop production at my unit?
Normally not. We install in sections, keeping each part of the roof sealed before moving on, and schedule lifting and electrical tie-in around your shifts. The final connection needs a short planned shutdown, which we agree with you in advance, usually on your weekly holiday.
Where does solar connect on an HT factory supply?
On the LT side, behind your own transformer. The single-line diagram, protection settings and metering show this clearly for MGVCL's review. We set inverter and relay protection so the plant disconnects correctly when grid supply fails, and record the arrangement for inspection.

Finance & tax

Can a Savli manufacturer get PM Surya Ghar subsidy?
No. PM Surya Ghar covers residential connections. A manufacturing company claims 40% accelerated depreciation on solar power generating systems under Appendix I of the Income Tax Rules. Ask your chartered accountant how it applies to your books before choosing purchase, a loan or a RESCO contract.
What GST applies to a factory solar plant now?
Since 22 Sep 2025, solar equipment carries 5% GST and services 18%. On a supply-and-install contract the service share is taken as 30%, which gives a blended rate of about 8.9%. Our quotation shows the goods and service portions separately so your accounts team can check it.

About Heaven Green

Does Heaven Green have an office near Savli?
No. Our only office is at Mota Varachha, Surat. Savli and Manjusar factories are handled by our channel partner network and field engineers, who survey, supervise the build and attend MGVCL inspections on site. Modules come through our Adani channel partnership and inverters are Qbits.
Call WhatsApp