Industrial rooftop solar across Vadodara's estates.

A factory around Vadodara buys most of its power while the sun is up, so a plant on your own shed cuts grid units the hour they are made. We design, file with MGVCL and maintain plants for units in Makarpura, Savli, Manjusar, Nandesari, Waghodia and Halol. We use Adani modules through our authorised channel partnership, with Qbits inverters.

MGVCL industrial file prepared by usPurlin and sheet check before pricingAdani modules, Qbits invertersLoad study free, nothing paid upfront

Request a Vadodara factory solar survey

Send one recent MGVCL bill and the estate and plot number. An engineer calls to agree a survey date and tells you which records to keep ready.

Free load study and site survey. No obligation.

Prefer to talk? +91 63904 05060

Licensee
MGVCL
Headquartered in Vadodara; Torrent Power holds no licence here
Estate sub-divisions
GIDC, Manjusar, Nandesari, Savli, Waghodia
Per MGVCL's own contact directory
Output per kW
4 to 4.5 units a day
Annual mean on an unshaded roof
250 kW plant
3.65 to 4.1 lakh units a year
Worked out from the daily band
Depreciation
40% accelerated
Solar power generating systems, Appendix I
GST on a turnkey job
About 8.9% blended
5% on goods, 18% on the 30% service share

The short answer

Factories across Vadodara's industrial estates are supplied by Madhya Gujarat Vij Company Limited (MGVCL), not Torrent Power. A rooftop plant here yields 4 to 4.5 units per kW each day, so 250 kW gives roughly 3.65 to 4.1 lakh units a year. Businesses cannot claim PM Surya Ghar; they claim 40% accelerated depreciation. Anything above 25 kW is priced only once we have studied your load.

Last reviewed 2 October 2026 · Heaven Green Energy engineering team

Vadodara's industrial belt

Four estate clusters, one licensee, different roofs

Vadodara's factories are spread across several GIDC estates rather than packed into one. The estate you sit in decides which MGVCL office reads your file, and often what kind of shed you are asking us to load.

Start with the map. Makarpura GIDC lies inside the city on its southern edge, beside Tarsali and Manjalpur. Wikipedia describes it as one of Vadodara's main industrial areas and notes that the Vadodara Chamber of Commerce and Industry sits there. North of the city, the Savli GIDC estate and the Manjusar units lie on the Savli to Halol stretch that Wikipedia places on the Delhi to Mumbai Industrial Corridor route. Waghodia GIDC lies east of the city, and Nandesari and Por complete the chemical and engineering belt on the highway.

Halol GIDC belongs on this list for practical reasons, though it falls in Panchmahal district rather than Vadodara. MGVCL runs it from its Godhra O&M Circle through a dedicated Halol GIDC sub-division.

MGVCL's directory shows how the company has organised itself around this industry. The Baroda O&M Circle carries a Manjusar Industrial sub-division and a Nandesari sub-division beside Savli and Waghodia, and the Baroda City Circle lists a sub-division named simply GIDC. We do not name the firms inside any estate. Your own bill, roof and load are what we size against.

Fabrication, machining and switchgear shops

Welding sets, CNC machines, press lines and test benches run through the day shift and stop at night. That load sits neatly under the solar curve. We log starting surges and power factor at survey, because welding and press loads swing hard and the inverter setting has to suit them.

Chemical and process plants

Reactors, agitators, pumps and cooling towers at Nandesari or Por often run around the clock. Solar then covers part of a flat base load and nearly every unit is used on site. Corrosive air at these plants means coated fasteners and closer inspection intervals, which we write into the maintenance plan.

Pharma, packaging and clean rooms

Air handling, chillers and controlled storage carry steady daytime demand and peak in the hot months, when the array produces most. Pharma roofs often hold HVAC units and exhaust stacks, so we map the shadow they cast before fixing a layout, rather than drawing panels across the whole roof.

Large plants feeding smaller suppliers

Automotive and engineering anchors in Savli, Manjusar and Halol draw a ring of supplier workshops on one or two shifts. These units often close on a weekly holiday and export on that day. We size against weekday daytime use so the plant is not built for units you cannot use.

How the numbers work

Factory economics in units, not promises

We size a Vadodara factory plant from what your meter records in daylight hours. A rupee saving depends on your tariff category and demand pattern, so we calculate it from your own bills at survey, never from a web page.

Daylight units decide the size. Every kilowatt on a clear, shadow-free roof here makes 4 to 4.5 units a day over the year. A 100 kW plant therefore gives about 1.46 to 1.64 lakh units annually, and 250 kW about 3.65 to 4.1 lakh. Compare that with what your unit uses between morning and late afternoon. If daytime use is well above the plant's output, almost all of it is consumed on site, which is the strongest position to be in.

Sanctioned load caps the plant, and demand behaves differently from units. MGVCL approves a rooftop plant against the load sanctioned on your connection, so a large roof does not mean a large plant. Solar reduces the units you buy. It does not promise a lower recorded maximum demand, because a monsoon afternoon can still see every machine pull from the grid. We read a full year of bills, including the demand column, before we propose a rating.

Tax replaces the subsidy. PM Surya Ghar covers homes only. Your firm can instead claim 40% accelerated depreciation on solar power generating systems under Appendix I of the Income Tax Rules. From 22 Sep 2025 GST runs at 5% on solar equipment and 18% on services. With the service share of a turnkey contract taken as 30%, the blend comes to about 8.9%. For reference, the indicative installed band at 25 kW in Gujarat is ₹10.75 lakh to ₹13.50 lakh, roughly ₹43,000 to ₹54,000 per kW. Larger plants are priced after a load study, since roof work, cable length and metering move the figure.

Generation from verified Gujarat constants (4 to 4.5 units per kW per day)
Plant sizeUnits a year
25 kW36,500 – 41,063
50 kW73,000 – 82,125
100 kW1,46,000 – 1,64,250
250 kW3,65,000 – 4,10,625
500 kW7,30,000 – 8,21,250

Indicative installed cost at 25 kW: ₹10.75–13.50 lakh (market range, not a quotation). Larger plants are priced after a load study of your bills and roof.

This is what we actually build.

Heaven Green Energy installations across India. Not stock photography, and not renders.

Solar panels installed flush on a corrugated metal factory roof
Factory roof
Long row of solar modules on a commercial rooftop at sunrise
Commercial rooftop
Elevated solar canopy structure above a terrace
Elevated structure
Wall of string inverters at a large solar installation
Electricals
Roof, structure and electricals

Engineering for Vadodara sheds and process plants

We settle three things before ordering panels. Can the roof take the weight? How will the array survive wind and allow safe access? Where does it join your electrical system?

Roof capacity and condition

Older Makarpura sheds and newer Savli or Waghodia buildings differ in purlin size, spacing and sheet gauge. We measure them, calculate the added dead load and check the sheet for rust and thinning. If the roof will not carry the array, you hear it in writing with the remedy, before any order is placed.

Wind, corrosion and safe access

Rails are bolted into purlins with sealed penetrations so the roof stays dry through the monsoon. Near chemical plants we specify coated hardware. We leave walkways for cleaning, keep vents, skylights and fire routes clear, earth the structure and design lightning protection for the actual roof height.

Switchgear, protection and MGVCL interface

Qbits inverters sit near the main LT panel to keep AC runs short. The design carries DC and AC isolators, surge protection, earthing pits and the metering MGVCL requires. On an HT connection the plant ties in on the LT side behind your transformer, and the single-line diagram records exactly how.

MGVCL

Approvals: who does what.

MGVCL must approve the plant before it is connected. The file moves faster when it goes to the correct sub-division and the drawings match what is built on the roof.

1

Bills, load data and drawings

We collect a year of bills and your sanctioned load, survey the roof and panel room, then prepare the layout, single-line diagram and equipment datasheets. We also confirm from your bill which MGVCL sub-division holds the connection.

Us
2

Application to the sub-division

We lodge the rooftop application with the office named on your bill, whether GIDC, Manjusar, Nandesari, Savli, Waghodia or Halol GIDC. MGVCL checks the rating against your sanctioned load and the feeder, then approves or asks for revisions.

Us, then MGVCL
3

Build and safety clearance

We install to the approved drawings and compile test results, earthing values and protection settings. Where the plant size triggers an Electrical Inspectorate clearance, we prepare that file and follow it through to the certificate.

Us
4

Inspection and connection

MGVCL inspects the plant, then fits or certifies the meters and energises the connection. Generation begins to show on your bill from that cycle. Our engineer attends the inspection, so any query is answered on the roof.

MGVCL
Paying for it

Three ways to fund the plant.

How you pay depends on your tax position and on whether you want the plant on your own balance sheet. Each route below is common among Vadodara manufacturers.

Buy the plant outright

Your company owns the asset and claims 40% accelerated depreciation in the year it is put to use. This suits a profitable unit with spare capital. You keep every unit generated, and an AMC with us covers cleaning, inspections, inverter checks and the reports your auditor asks for.

Term loan or equipment finance

Banks and NBFCs fund rooftop plants for MSMEs, and you still own the asset for depreciation purposes. We provide the quotation, bill of materials and generation estimate in units that a lender wants. The lender sets rate and tenure, so compare total cost, not the instalment alone.

Third-party ownership (RESCO)

A developer owns the plant on your roof and bills you for the units it supplies. There is no capital outlay and no depreciation claim. Check contract tenure, the buy-out schedule and roof access rights carefully, because they bind your premises for as long as the agreement runs.

From enquiry to export

How the project runs.

Five stages take a Vadodara factory from first call to a running plant. You see each document before it reaches MGVCL.

Where we work from

Heaven Green Energy has a single office, at Mota Varachha in Surat. We serve Vadodara's estates and the wider Central Gujarat region through our channel partner network and field engineering team. They carry out surveys, supervise the build and attend MGVCL inspections on site. There is no Heaven Green branch in Vadodara, and we tell you that before you sign.

01

First call and bill review · Day 1

You send twelve months of bills and the plot details. We check sanctioned load, connection type and daytime use, and say frankly if your roof is not worth a site visit.

02

Site and load survey · Week 1

An engineer measures the roof, purlins and shading, walks the cable route and opens the main panel. Where the load pattern is unclear we log it for several days.

03

Design and written proposal · Week 2

You get the layout, single-line diagram, a bill of materials naming makes and quantities, and monthly generation in units. The price follows from that design, not a rate card.

04

Approval and build · Weeks 3 to 8

We file with MGVCL, procure Adani modules and Qbits inverters and install around your production plan. Roof work is staged so the shed stays sealed and lines keep running.

05

Commissioning and upkeep · After MGVCL approval

MGVCL inspects and connects the plant. We hand over test reports and warranties, switch on monitoring, then start the cleaning and inspection schedule written into the contract.

Customers

What businesses say after a year.

Reviews from Heaven Green industrial and commercial customers in Bharuch, Anand and Surat, shown with the city each plant was actually built in. None of them is in Vadodara.

★★★★★
250 kW industrial system on our chemical plant. Generation has been 8% above estimate every month. Their O&M team is responsive.
SSanjay Joshi
Industrial · Bharuch · 250 kW
★★★★★
80 kW on our hospital rooftop. Diesel backup running time cut by 60%. Heaven Green's structural design cleared all wind-load checks first time.
NNilesh Bhatt
Commercial · Anand · 80 kW
★★★★★
150 kW at our textile factory dropped power costs by 68%. The ROI calculation they provided was spot-on, break-even under 4 years.
MMihir Shah
Commercial · Surat · 150 kW
Before you sign

Six things to check with any vendor.

  1. Vadodara's industrial estates are supplied by MGVCL. Torrent Power holds no licence in Vadodara, so ignore any advice that points you there.
  2. MGVCL runs estate-specific offices, including GIDC, Manjusar Industrial, Nandesari, Savli, Waghodia and Halol GIDC sub-divisions. Your bill names yours.
  3. A kilowatt of roof solar makes 4 to 4.5 units a day here, so a 250 kW plant gives about 3.65 to 4.1 lakh units a year.
  4. Factories get no PM Surya Ghar subsidy. The firm claims 40% accelerated depreciation on the plant.
  5. Turnkey GST blends to about 8.9%: 5% on equipment and 18% on the 30% service share.
  6. Sanctioned load and daytime use set the plant size. Any plant above 25 kW is priced after a load study and a purlin check.
Questions

Industrial solar in Vadodara, answered.

Cost & output

What does industrial rooftop solar cost in Vadodara?
At 25 kW the indicative installed band in Gujarat is ₹10.75 lakh to ₹13.50 lakh, roughly ₹43,000 to ₹54,000 per kW. Bigger factory plants are quoted only after a load study, because roof strengthening, cable distance and the metering arrangement change the cost. Every quotation carries a written bill of materials.
How much will a 100 kW plant generate on a Vadodara factory?
Roughly 1.46 to 1.64 lakh units a year, based on 4 to 4.5 units per kW each day on an unshaded roof. Output climbs in the dry months and dips through the monsoon, so the yearly figure is an average. Your proposal lists the expected output month by month.
Should I fill my whole shed roof with panels?
Not automatically. MGVCL limits the plant against your sanctioned load, and a plant much larger than your daytime use sends more units back than it saves on site. We size from your bills and load pattern first, then check how much roof that rating actually needs.

Licensee & approvals

Is my Vadodara factory on MGVCL or Torrent Power?
MGVCL. Torrent Power distributes in Ahmedabad, Gandhinagar and parts of Surat, not Vadodara. MGVCL's directory lists GIDC, Manjusar Industrial, Nandesari, Savli and Waghodia sub-divisions around the city, and Halol GIDC under Godhra. If your unit sits inside an SEZ or private park, check the licensee printed on your bill.
Which MGVCL office handles my rooftop application?
The sub-division printed on your electricity bill. Makarpura-side units, Manjusar units, Nandesari units and Waghodia units can each fall under different offices, and a file sent to the wrong desk is returned. We read the bill before filing and lodge the application with the correct office.
Who sets net metering terms for MGVCL industrial consumers?
The Gujarat Electricity Regulatory Commission, through its orders and regulations, read with the state's solar policy. MGVCL applies those terms and no installer can change them. Treatment differs by consumer category, so we confirm in writing the current rules for your connection before the plant size is final.

Roof & engineering

Can an old Makarpura shed roof take a solar plant?
Often, but only after a check. Older sheds may have lighter purlins or worn sheeting. We measure purlin size and spacing, assess the sheet and calculate the extra dead load. If strengthening or re-sheeting is needed first, the proposal says so and prices it separately.
Does chemical plant air near Nandesari damage solar structures?
It can, if ordinary hardware is used. Acidic or saline fallout attacks plain fasteners and the film on the glass needs washing rather than wiping. We specify coated structure and fixings for such sites and build a closer cleaning and inspection interval into the maintenance schedule.
How does solar connect on an HT factory connection?
Normally on the LT side, behind your own transformer. The protection settings, metering and single-line diagram must show that clearly for MGVCL's review. We set the inverter and relay protection so the plant isolates correctly when the grid trips, and document the interface for inspection.

Finance & tax

Can a Vadodara manufacturer get the PM Surya Ghar subsidy?
No. PM Surya Ghar is a residential scheme. A manufacturing firm claims 40% accelerated depreciation on solar power generating systems under Appendix I of the Income Tax Rules. Your chartered accountant should confirm how it applies before you choose between ownership, a loan or a RESCO contract.
What GST rate applies to an industrial solar plant?
Since 22 Sep 2025, solar equipment attracts 5% GST and services 18%. With the service share of a supply-and-install contract taken as 30%, the blended rate is about 8.9%. A GST-registered business may be able to take input tax credit, which your accountant should confirm.

About Heaven Green

Does Heaven Green Energy have an office in Vadodara?
No. Our only office is at Mota Varachha in Surat. Our channel partner network and field engineers run Vadodara surveys, supervise installation and attend MGVCL inspections. Modules come through our authorised channel partnership with Adani, and inverters are Qbits.
Call WhatsApp